Abitibi Metals Corp. (CSE: AMQ) has announced encouraging regional exploration results from its 100%-owned B26 Polymetallic Property in Quebec, with a new potential volcanogenic massive sulphide (VMS) zinc-silver mineralized zone intersected 1.5 kilometres west of the B26 Deposit. The discovery from drill hole 1274-26-383 returned 14.25 metres of 1.13% zinc and 51.51 g/t silver at 400 metres vertical depth, supporting the company's thesis that B26 is part of a broader VMS cluster. This marks the first systematic test of the property's regional potential beyond the immediate B26 footprint.
Key Points
- Abitibi Metals Corp. (CSE: AMQ) completed a 3,285-metre regional exploration program at its B26 Polymetallic Property in Quebec.
- Drill hole 1274-26-383 intersected 14.25 metres of 1.13% zinc and 51.51 g/t silver 1.5 kilometres west of the B26 Deposit, including 3.10 metres of 2.82% zinc and 120.64 g/t silver.
- The company owns 100% of the B26 Project after exercising its option to acquire the remaining interest from SOQUEM Inc. in June 2026.
- Only three of seven priority regional targets have been tested to date, with significant exploration upside remaining across the property, particularly toward the former Selbaie Mine.
Key Discovery at Target 1: New VMS Lens West of B26
Abitibi Metals' most significant result came from hole 1274-26-383, which tested a new target approximately 1.5 kilometres west of the B26 Deposit at 400 metres vertical depth. The hole intersected 14.25 metres of zinc-silver mineralization grading 1.13% zinc and 51.51 g/t silver, calculated at 0.74% copper equivalent using 2026 metal price assumptions. Within this broader interval, the company identified two higher-grade subintervals: 3.10 metres of 2.82% zinc and 120.64 g/t silver (1.73% CuEq) and 3.50 metres of 1.61% zinc and 82.49 g/t silver (1.18% CuEq).
The geological characteristics of the mineralization at Target 1 closely resemble the peripheral silver-zinc zonation observed at the B26 Deposit itself. The release states that the Zn-Ag mineralization is hosted in pyritized, locally semi-massive felsic ash and lapilli tuffs with medium to strong sericite, silica and iron carbonate alteration—the same host-rock package and alteration style as the B26 deposit sequence. Notably, the same hole also intersected a separate copper-rich interval grading 0.55% copper over 0.60 metres approximately 70 metres farther downhole to the north, associated with chalcopyrite stringers and black chlorite alteration consistent with the Cu Stringer zone signature at B26. This metal zonation architecture supports the interpretation that Target 1 may host a separate VMS lens with similar characteristics to B26 but remaining distinct from the main deposit.
Mineralization Characteristics and Structural Setting
The newly discovered zone displays geological attributes that align with the company's working model for VMS systems in the region. The release indicates that the Zn-Ag mineralization at Target 1 is more intensely altered and moderately foliated compared to the B26 deposit, distinguishing it as a separate occurrence while maintaining the same fundamental host-rock package. This distinction suggests that the zone represents a distal or peripheral expression of a new VMS lens that could lead to the discovery of an additional massive sulphide body with an associated copper stringer zone.
The mineralization at Target 1 remains open in all directions, according to the announcement. The company states that follow-up drilling targeting this horizon is being planned with the intention to further define the controls on mineralization and vector into the core, copper-gold-enriched centre of the lens. The 400-metre vertical depth of this discovery is particularly notable given that historical drilling on the property remained largely limited to the upper 200 metres outside of the B26 Deposit itself, suggesting substantial unexplored potential at greater depths across the regional targets.
High-Grade Silver and Gold at Target 4 Near Historical Selbaie Mine
A second area of exploration interest emerged from drill hole 1274-26-385, which tested Target 4 located approximately 4.5 kilometres northwest of the B26 Deposit. This hole intersected a broad interval of 8.85 metres grading 0.47% copper equivalent (0.68% zinc, 21.21 g/t silver), which includes a subinterval of 4.70 metres grading 0.68% copper equivalent. More notably, the hole returned a high-grade precious metals intercept of 332 g/t silver and 0.83 g/t gold over 1.0 metre from 501 metres downhole.
The release notes that Target 4 hosts a strong induced polarization (IP) anomaly and that historical drilling had outlined an open zinc-silver mineralized system in the area, including 0.77% zinc and 33.8 g/t silver over 19.2 metres. The mineralization at Target 4 remains open in all directions, with no prior drilling having tested this corridor below 200 metres vertical depth. The company's announcement suggests this high-grade precious metals intercept should be evaluated alongside other historical high-grade intercepts on the property, including hole 1274-03-82M at Target 5, which returned 8.2 g/t gold, 212.5 g/t silver and 2.9% zinc over 1.0 metre. Target 4's proximity to the former Selbaie Mine and the presence of a separate VMS corridor (Targets 5–7) trending toward that historical producer highlight additional exploration upside in the northern portion of the property.
Early-Stage Regional Program Targets Multiple Untested Zones
The 2026 regional drilling program represents only an initial test of the B26 Property's regional potential. To date, only four drill holes have been completed, targeting three of seven identified high-priority regional targets. This early stage of systematic regional exploration underscores the significant upside that remains to be evaluated across the property. The company's targets were identified through a reinterpretation of historical drilling, legacy induced polarization surveys, and the company's 2025 VTEM-MAG airborne survey.
Target 2, located approximately 5 kilometres west of B26, tested a 1.5-kilometre-long VTEM conductor hosted within the same favourable felsic volcanic sequence as B26. Historical drilling in this area returned broad polymetallic halos, including 0.33% zinc, 0.11% copper and 1.25 g/t silver over 21.0 metres, suggesting leakage from a larger mineralized system at depth. The 2026 drill hole confirmed the favourable geological setting at 400 metres vertical depth and will be followed by downhole Pulse EM surveying to evaluate potential off-hole conductors. The release states that upon resumption of work, all regional holes will be pulsed to investigate larger off-hole targets or extensions, providing additional vectors for follow-up drilling.
Strategic Position Near Selbaie Mine and Infrastructure Advantages
Abitibi Metals' B26 Property benefits from a strategic location just 7 kilometres southeast of the formerly producing Selbaie Mine, a past-producing zinc-copper-silver operation that closed in 1992. The announcement highlights that this proximity provides access to key infrastructure that could support potential future mine development. The regional exploration program has identified a separate VMS corridor (Targets 5–7) that trends toward the Selbaie Mine, opening a new exploration vector that may connect the B26 system with the historical mineralization encountered at Selbaie.
The company's focus on VMS (volcanogenic massive sulphide) mineralization aligns with the geological characteristics of the region, which has demonstrated world-class potential for base and precious metal deposits. By confirming that the newly discovered mineralization west of B26 occurs within the same felsic volcanic package as the B26 Deposit itself, the exploration results reinforce the view that B26 may be part of a broader cluster of mineralized systems. This geological continuity and the demonstrated presence of mineralized lenses at depths previously untested in most areas of the property support the company's assertion that it is at the early stages of building a world-class VMS camp.
Resource Base and Project Development Context
The B26 Polymetallic Project hosts a substantial mineral resource base as of November 2024. The indicated resource is reported as 12.96 million tonnes at 2.08% copper equivalent, comprising 1.19% copper, 1.16% zinc, 0.44 g/t gold and 30.8 g/t silver. The inferred resource totals 12.34 million tonnes at 2.20% copper equivalent, with 1.60% copper, 0.16% zinc, 0.68 g/t gold and 8.1 g/t silver. This existing resource base positions the B26 Property as a substantial polymetallic deposit with combined base and precious metal credits.
The company's regional exploration program is explicitly framed as complementary to the primary objective of expanding the B26 Deposit itself. The release notes that while expanding the B26 Deposit remains the company's primary objective, discoveries like the new VMS zone returned from just 400 metres vertical depth demonstrate management's view that the company is creating meaningful long-term value for shareholders. CEO Jonathon Deluce commented that the results reflect the strength of Abitibi's growing exploration team and its ability to add value across the property, positioning the company to pursue a multi-deposit development scenario in the longer term.
Operational Continuity and Planned Follow-Up Drilling
Drilling activities at the B26 Project had been temporarily suspended due to wildfire-related concerns in the region but resumed following the announcement. The company notes that a follow-up drilling program is being designed for execution in winter 2027, when frozen ground conditions allow access to the drill sites. This planned follow-up will focus on further defining the controls on mineralization in the newly discovered Target 1 zone and vectoring into the core, copper-gold-enriched centre of the potential new lens.
The announcement indicates that downhole Pulse EM surveying will be employed at Targets 2 and 4 to evaluate off-hole conductors and extend the exploration to areas beyond the immediate drill hole vicinity. The company's systematic approach to testing the property's seven high-priority regional targets, combined with the untested precious metal targets north of B26 and the separate VMS corridor (Targets 5–7), suggests a multi-year exploration strategy designed to evaluate the full regional potential of the property. Only three of the seven priority targets have been tested to date, indicating that the exploration campaign is in its very early phases.
100% Ownership Following SOQUEM Option Exercise
Abitibi Metals achieved 100% ownership of the B26 Project in June 2026 after exercising its option to acquire the remaining interest from SOQUEM Inc., a subsidiary of Investissement Québec. This acquisition of the outstanding equity stake removes any requirement to share future mineral discoveries or economic benefits with a joint venture partner, streamlining the company's ability to advance the project toward development. The timing of this ownership consolidation coincided with the company's initiation of the regional exploration program, positioning Abitibi to capture the full value of any discoveries made across the entire property.
Prior to exercising this option, Abitibi had been operating the property under an option agreement that allowed it to conduct exploration and develop the resource. The acquisition of full ownership represents a strategic milestone that reflects management's confidence in the property's long-term potential. With 100% ownership secured, the company can now pursue exploration and development decisions without requiring approval or cooperation from a joint venture partner, potentially accelerating the pace of future development activities if exploration results warrant advancement to the next phase.
Quality Assurance Protocols and Metallurgical Foundation
Abitibi Metals' disclosure includes detailed quality control and quality assurance protocols applied to the regional drilling program. Core logging and QA/QC protocols were run and supervised by the company's technical team, with drill core split in half and sent to AGAT Laboratories Ltd. for analysis. Sample preparation was conducted in Val-d'Or, fire assay in Thunder Bay, and 4-acid digestion/multi-element analysis in Calgary. The standard fire assay technique employed a 30-gram sample split, with 50-gram splits used where required (AGAT Code 202 551).
The company's copper equivalent calculations were based on metallurgical test work referenced as SGS CACGS-P2017-047. The 2026 metal price assumptions used in the reported CuEq calculations were US$4.50 per pound copper, US$1.50 per pound zinc, US$28.00 per ounce silver and US$3,000 per ounce gold, with assumed recovery rates of 98.3% for copper, 90.0% for gold, 96.1% for zinc and 72.1% for silver. An alternative spot price calculation was also provided using higher metal prices (US$5.60/lb Cu, US$1.50/lb Zn, US$75/oz Ag and US$4,650/oz Au), yielding higher CuEq values for the reported intervals. Louis Gariépy, P.Eng. (OIQ #107538) and VP Exploration of Abitibi Metals, serves as the Qualified Person under National Instrument 43-101 and has reviewed and approved the technical information in the announcement.
Investor Considerations and Broader Market Context
The successful identification of a new VMS mineralized zone 1.5 kilometres from the main B26 Deposit adds a new exploration dimension to Abitibi Metals' asset base. The company's thesis that B26 is part of a broader cluster of mineralized systems is supported by the geological continuity observed in the Target 1 discovery and the presence of multiple additional untested targets across the property. For investors monitoring the company, the systematic approach to regional exploration and the early-stage nature of testing (only three of seven high-priority targets evaluated to date) may suggest material exploration upside remains to be captured through future drilling campaigns.
The immediate share price impact was not clear from available public information. However, investors following Abitibi Metals may be watching for results from the planned follow-up drilling program at Target 1, the Pulse EM survey results from Targets 2 and 4, and any announcements regarding the winter 2027 drilling program. The company's progress in defining the regional VMS system, combined with its existing B26 resource base, could influence market perception of the company's longer-term development potential. The presence of high-grade precious metals intercepts at Target 4 and other historical locations on the property may also be of interest to investors tracking the precious metal component of the project's potential.



Please wait processing your request...