ATERRA Metals Inc. (CSE: ATC) (OTCQB: CSSCF) has announced it has commenced preparation of a maiden independent Mineral Resource Estimate (MRE) for its Totora Cu/Au Project in Chile's Dos Amigos Mining District. The company has engaged SRK Consulting (Chile) SpA to prepare the NI 43-101-compliant estimate, which will incorporate results from ATERRA's recently completed Phase I drill program alongside historical drilling. The MRE is anticipated to be available for release during September 2026, representing a significant milestone for investors seeking the first quantitative assessment of the project's scale.

Key Points

  • ATERRA Metals Inc. (CSE: ATC) (OTCQB: CSSCF) is a copper-gold exploration company focused on Chile's Dos Amigos Mining District
  • The company has commenced preparation of a maiden NI 43-101-compliant Mineral Resource Estimate for the Totora Cu/Au Project, with SRK Consulting (Chile) SpA engaged as independent preparer
  • The MRE will cover three copper-gold porphyry systems — Frontera, Totora, and Clinton — with release anticipated in September 2026
  • Investors may be watching for the MRE release, which the company states will establish the technical foundation for future economic studies

SRK Consulting Appointed to Prepare NI 43-101 Estimate Across Three Porphyry Systems

ATERRA has engaged SRK Consulting (Chile) SpA, described in the release as a leading international mining consultancy, to produce the independent MRE. The estimate will focus on the Frontera, Totora, and Clinton copper-gold porphyry systems, which the company identifies as the most advanced exploration targets on the property. The MRE will be prepared in accordance with National Instrument 43-101 standards and will integrate results from ATERRA's Phase I drill program with historical drill data compiled from the project. The Totora Project is located 15 kilometres south of Tintina Mines' Domekyo Sulfuros development project.

Phase I Drill Highlights Underpinning the Totora Resource Estimate

The forthcoming MRE will draw on Phase I drill results previously disclosed by ATERRA on July 16, 2026. Headline intercepts include 284 metres grading 0.64% CuEq (0.41% Cu and 0.27 g/t Au) from surface at the Frontera zone, with a higher-grade sub-interval of 180 metres grading 0.71% CuEq. At the Totora zone, drill hole ATOD01 returned 194 metres grading 0.41% CuEq (0.35% Cu and 0.11 g/t Au) from 254 metres downhole. Copper equivalent grades were calculated using a copper price of US$4.00 per pound and a gold price of US$3,500 per ounce, with assumed recoveries of 85% for both metals.

Strategic Positioning Within Chile's Dos Amigos Mining District

The release notes that multiple companies have recently made investments in the Dos Amigos Mining District, which ATERRA states underscores renewed industry interest in the region's copper-gold potential. The company describes the Totora Project as holding a strategic position within this emerging mining district. The maiden MRE, once completed, is intended to define Totora's initial mineral inventory and provide the technical foundation required for future economic studies, guiding the company's exploration and development planning going forward.