Aurbis Resources Corp. (CSE: AURR) has announced that its 100%-owned Ecru Gold Project in Nevada is drill-ready, following six phases of exploration completed over six months. Rock sample assay results correlate closely with hornfels alteration targets, confirming the geochemical signature associated with Robertson-style gold mineralisation. The company has commenced approval documentation for a 3,000-metre drill program planned for November 2026, a milestone investors may be watching closely as the project advances toward its first drill test.

Key Points

  • Aurbis Resources Corp. (CSE: AURR) announced the Ecru Gold Project in Nevada is drill-ready
  • Rock sample geochemistry correlates closely with 14 hornfels alteration targets identified across six exploration phases
  • A 3,000-metre drill program is planned for November 2026; contractor selection to be announced once contracts are finalised
  • Investors may watch for drill contractor confirmation and Bureau of Land Management approval submissions

Six Phases of Systematic Exploration Confirm Robertson-Style Targets at Ecru

Aurbis completed six phases of work on the Ecru Gold Project over six months, combining geological mapping, high-definition magnetic surveys, gravity data reinterpretation, soil geochemistry, and rock sampling. The combined dataset identified 14 targets interpreted as hornfels alteration within the contact aureole of the Ecru intrusion. Hornfels alteration is described in the release as a defining characteristic of Robertson-style gold mineralisation. The company states that mapping, geophysical, and soil geochemical datasets corroborate one another, forming what it describes as a strong foundation for drill targeting.

Rock Sample Assay Results Validate Ecru Geochemical Indicator Suite

Approximately 150 rock samples were collected along the western high-lying section of the project during two separate programs in June and July 2026. The release states that assay results were reviewed against the Robertson-style indicator element suite — primary indicators Au, As, Bi, Te, and Cu, and secondary indicators Se, Pb, and Ag. Anomalous rock sample areas closely coincided with previously identified hornfels and soil geochemical targets. The company states that this correlation provided the final layer of evidence needed to lock in drill targets for Robertson-style gold mineralisation.

Proximity to Robertson Deposit Underpins Ecru's Exploration Rationale

The Robertson deposit, operated by Nevada Gold Mines, sits less than 2 kilometres south of the Ecru project. Aurbis notes that Ecru occupies lower ground with minimal surface outcrop, which it believes left the project largely unnoticed by historical prospectors. The company states that all geological, geophysical, geochemical, and structural characteristics identified at Robertson have now been recognised surrounding the Ecru intrusion. The release also identifies the Northern Nevada Rift and Carlin-style gold potential as additional targets to be investigated after the initial drill program is completed.

Drill Approvals and Contractor Selection Under Way for November 2026 Program

Aurbis has commenced preparation of approval documentation to be submitted to the Bureau of Land Management and has contacted drill contractors for the proposed 3,000-metre program. The release states that the chosen contractor will be announced once all contracts are finalised. Drill targeting will prioritise primary and hornfels targets, with select secondary targets also potentially tested. The immediate share price impact was not clear from available public information.