Boreal Gold Inc. (CSE: BGLD) announced significant gold assay results from its Phase 4 winter and spring 2026 drill program at the North Star Gold Project near Snow Lake, Manitoba. Drill hole GR-26-149 returned 15.54 g/t gold over 2.41 metres, including a high-grade interval of 81.5 g/t gold over 0.41 metres within the Gold Rock Vein. The company has completed 10 HQ drill holes totalling 1,326 metres and is preparing to shift focus to exploration at its Fay Lake property in Flin Flon.

Key Points

  • Boreal Gold Inc. (CSE: BGLD) released Phase 4 drilling results from its 100% owned 2,922-hectare North Star Gold Project located approximately 36 km west of Snow Lake, Manitoba
  • Drill hole GR-26-149 intersected 15.54 g/t gold over 2.41 metres, with a peak interval grading 81.5 g/t gold over 0.41 metres and visible gold observed in core
  • The company completed 10 HQ drill holes totalling 1,326 metres; all holes intersected the Gold Rock Shear Zone with strong alteration
  • Boreal Gold will now focus on drilling the Fay Lake property with an approximate 1,000-metre program targeting volcanogenic massive sulphide horizons and high-grade gold quartz veins

Gold Rock Vein Drilling Extends Mineralization at Depth

Drill hole GR-26-149 on the Gold Rock Vein at Cross-section 63+90N returned an average grade of 15.54 g/t gold over 2.41 metres from 85.17 to 87.58 metres depth. The intersection included a narrower high-grade interval of 25.7 g/t gold over 1.41 metres and a peak zone of 81.5 g/t gold over 0.41 metres. The company reported that the drill core contained over 30 specks of visible gold, suggesting strong mineralization. This selective infill hole extended the high-grade Gold Rock Vein to approximately 60 metres vertical depth on the section, providing evidence of mineralization persistence at depth. Drill hole GR-26-150, drilled beneath GR-26-149 to test deeper extensions, returned lower grades of 1.61 g/t gold over 1.27 metres; however, the company noted that biotite alteration and shear strength remained robust.

Completed Phase 4 Program and Resource Estimate Plans

Boreal Gold completed the 2026 winter and spring drilling program with 10 HQ drill holes (GR-26-144 to GR-26-153) totalling 1,326 metres on the Gold Rock Quartz Shear Zone. The company stated that every drill hole intersected the Gold Rock Shear Zone with strong alteration, though not all returned spectacular results. Management attributed variable success to the nuggety nature of gold veins in these vein structures and multiple geological factors including host-rock rheology, shearing history, and proximity to porphyry sills. The company disclosed plans to commission a new NI 43-101 resource estimate for the Gold Rock Vein, noting that no such report has been completed since 2008. It also intends to conduct a new global resource estimate for both North Star and Gold Rock structures to reflect current gold prices, which the announcement noted are significantly higher than historical estimates.

Fay Lake Exploration Program and Future Drilling Strategy

Following completion of North Star drilling, Boreal Gold will focus on the Fay Lake property in Flin Flon, Manitoba, with an approximate 1,000-metre drill program commencing in the coming weeks. The drill program will target the Redwin volcanogenic massive sulphide horizon and high-grade gold quartz veins previously identified in trenches. The company will also test the Koscielny Lake showings with two drill holes to evaluate quartz veins cutting gabbro and iron formation. Historical sampling returned grades up to 9 g/t gold at Koscielny Lake. Boreal Gold owns a 2,719-hectare Fay Lake property positioned between HudBay Minerals' Vamp Lake deposits and the former Puffy Lake Gold Mine. The company plans concurrent geological mapping, prospecting, and grid-line extension work focusing on VMS-style and quartz-vein-hosted gold mineralization similar to nearby deposits.