Emperor Metals Inc. (CSE: AUOZ) has released new assay results from its 2026 exploration campaign at the Duquesne West Gold Project in Quebec, highlighted by a standout intercept of 32.0 metres grading 5.9 g/t gold in drill hole DQ26-37. The program has now completed 66 holes totalling 20,479 metres of new drilling, with assay results received for 44 of those holes. The company states it is advancing toward an updated NI 43-101 Mineral Resource Estimate and a subsequent Preliminary Economic Assessment, with drilling scheduled to resume in Q4 2026.

Key Points

  • Emperor Metals Inc. (CSE: AUOZ, OTCQB: EMAUF, FSE: 9NH) released 2026 drill assay results for Duquesne West, Quebec
  • Top intercept: DQ26-37 returned 32.0 metres grading 5.9 g/t gold at 335 metres vertical depth, including 2.6 metres of 22.4 g/t gold
  • Assay results received for 44 of 66 holes (13,943 metres), representing 68% of new 2026 drilling; approximately 50% of total expected assays remain pending
  • Investors may be watching for remaining assay results, an updated Mineral Resource Estimate, and Q4 2026 drill resumption

Duquesne West Drill Results: DQ26-37 Confirms High-Grade Zone Thickness

Infill hole DQ26-37 was designed to test structural geometry and grade continuity near historic hole DQ23-02 within the core deposit footprint. The intercept of 32.0 metres at 5.9 g/t gold at 335 metres vertical depth, including a higher-grade sub-interval of 2.6 metres at 22.4 g/t gold, confirms local zone thickening of replacement-style mineralisation. The company states this result supports the potential conversion of Inferred resources into the Indicated category in its forthcoming NI 43-101 Mineral Resource Estimate update. True thickness is estimated at 70 to 85 per cent of reported drill widths.

Step-Out Drilling Extends Mineralised System at Depth

Step-out hole DQ26-47 targeted the down-plunge extension of high-grade zones intersected in earlier 2026 holes, returning multiple continuous intervals including 14.7 metres grading 0.5 g/t gold, 7.7 metres at 1.0 g/t gold, and 6.6 metres at 0.9 g/t gold. Separately, DQ26-46 returned an additional 22.0 metres grading 0.7 g/t gold beneath a previously reported high-grade lens. The release states that this area features drill spacing exceeding 300 metres in places and retains unsampled historical core, indicating material upside potential for resource expansion.

Campaign Scale and Path Toward a Mineral Resource Update

The 2026 program comprised 20,479 metres of new drilling and approximately 7,884 metres of targeted historical core resampling, generating more than 28,000 metres of combined drilling data. Total drilling on the property has now reached 142,758 metres. The property currently hosts an inferred mineral resource of 26.9 million tonnes containing 1.46 million ounces of gold at 1.69 g/t. The company intends to incorporate the full 2025 and 2026 dataset into an updated geological model ahead of a revised Mineral Resource Estimate and subsequent Preliminary Economic Assessment.

Q4 2026 Preparations: Surface Stripping and Drill Resumption Planned

Emperor Metals states that in preparation for Q4 exploration, it will commence limited surface stripping within the proposed Phase 1 pit area and re-establish several historical trenches to expose mineralisation and support geological mapping. Diamond drilling is expected to resume in late October 2026, focused on expanding and upgrading mineralisation in priority target areas identified during the 2026 campaign. The immediate share price impact was not clear from available public information.