GoldHaven Resources Corp. (CSE: GOH) announced results from its 2026 helicopter-supported geochemical sampling program at the Magno Project in northwestern British Columbia, identifying a new high-grade tungsten-bearing skarn returning 8,850 ppm tungsten (0.885% W), equivalent to approximately 1.12% WO₃. The program also uncovered a separate molybdenum occurrence returning 2,800 ppm Mo near the historic Cassiar Moly deposit. The findings extend the known mineralised footprint of the Magno Project into previously underexplored areas, a development investors may be watching closely given growing demand for critical minerals.

Key Points

  • GoldHaven Resources Corp. (CSE: GOH, OTCQB: GHVNF, FSE: 4QS)
  • New tungsten-bearing skarn south of Lamb Mountain returned 8,850 ppm tungsten and 1,755 ppm copper from sample J647906
  • 108 surface rock samples collected; molybdenum sample J647976 returned 2,800 ppm Mo near historic Cassiar Moly deposit
  • Investors may watch for further evaluation of newly identified tungsten and molybdenum occurrences alongside existing geological datasets

New Tungsten Skarn South of Lamb Mountain Extends Magno Mineralisation

Sample J647906 was collected from a newly identified skarn south of Lamb Mountain, near the contact with the Cassiar Batholith — an area not previously recognised as a skarn exploration target. The sample returned 8,850 ppm tungsten (0.885% W) and 1,755 ppm copper. The release states the geological setting is similar to the Company's Dead Goat tungsten skarn, where mineralisation is associated with carbonate-hosted skarn development near intrusive contacts. A separate granite sample collected near historic Lamb Mountain skarn trenches returned 710 ppm tungsten, providing additional evidence of tungsten mineralisation associated with the Cassiar Batholith.

Molybdenum Occurrence Near Cassiar Moly Deposit Signals Broader Mineral System

The 2026 program also identified a new molybdenum target, with sample J647976 returning 2,800 ppm molybdenum (0.28% Mo) from the Cassiar Batholith near the historic Cassiar Moly deposit. The announcement notes that visible molybdenum mineralisation was documented at the sample location. Two additional samples from a previously unexplored portion of the batholith returned 321 ppm and 284 ppm molybdenum respectively, further demonstrating the presence of molybdenum across multiple locations and supporting continued evaluation of the project's broader magmatic-hydrothermal system.

QA/QC Protocol and Qualified Person Sign-Off for 2026 Sampling Program

All 108 surface rock samples were submitted to ALS Laboratories in Whitehorse, Yukon, with preparation in Langley and analysis in Vancouver, British Columbia. Tungsten was analysed using lithium borate fusion with ICP-MS finish, while molybdenum, copper, and silver were analysed using four-acid digestion with ICP-AES finish. Certified reference materials and blanks were inserted into the sample stream in accordance with the Company's QA/QC protocols. The technical content was reviewed and approved by Raymond Wladichuk, P.Geo., a Qualified Person as defined under National Instrument 43-101. The Company cautions that rock samples are selective and results are not representative of average mineralisation grades or continuity.