Hertz Energy Inc. (CSE: HZ) has announced the successful completion of a high-resolution airborne magnetic and Very Low Frequency Electromagnetic (VLF-EM) survey over its 100%-owned Lake George Antimony-Tungsten-Gold Project in New Brunswick, Canada. The geophysical survey, conducted between June 21 and June 25, 2026, covered 56.66 square kilometres and comprised 1,194 line-kilometres of data acquisition. The company plans to use the results to guide an expansive 2026 field exploration program targeting antimony, tungsten, and gold mineralization in a region historically dominated by North America's largest primary antimony producer.
Key Points
- Hertz Energy Inc. (CSE: HZ) completed a dual-sensor airborne magnetic and VLF-EM survey over its Lake George Antimony-Tungsten-Gold Project in New Brunswick
- The survey covered 56.66 square kilometres across 1,194 line-kilometres at 50-metre line spacing with approximately 23-metre mean terrain clearance, providing substantially higher resolution than historical regional datasets
- The company's Tungmony Project comprises five mineral claims totalling 4,392.4 hectares surrounding the historic Lake George Antimony Mine on three sides across approximately 13 kilometres of prospective strike length
- Hertz Energy plans a 2026 field program including prospecting, mapping, soil geochemistry, induced polarization surveying, and contingent diamond drilling of up to 3,000 metres based on earlier results
- The historic Lake George Mine operated intermittently between 1876 and 1996 as North America's largest primary antimony producer; antimony is designated a critical mineral in both Canada and the United States
Strategic Land Position Surrounding Historic Antimony Mining District
Hertz Energy has consolidated a significant mineral claim package surrounding the Lake George Antimony Mine, one of North America's most prolific antimony-producing operations. The company's Tungmony Project consists of five mineral claims initially staked between September 2024 and April 2025, covering 4,392.4 hectares of prospective ground. The claims encircle approximately 13 kilometres of favourable strike length adjacent to the historic mine site, which is located approximately 38 kilometres southwest of Fredericton, New Brunswick.
The Lake George Antimony Mine operated intermittently for 120 years between 1876 and 1996, establishing itself as North America's premier primary antimony producer. The historic mine was situated along the geological contact between Silurian Kingsclear Group metasedimentary rocks and Devonian intrusive rocks of the Pokiok Plutonic Suite—the same geological framework that hosts the mineralization Hertz Energy is exploring on its surrounding claims. Much of the company's property has experienced minimal historical exploration activity despite favourable geological conditions, according to the announcement.
Advanced Geophysical Survey Methodology and Coverage
Hertz Energy engaged Novatem Airborne Geophysics to conduct a high-resolution survey employing dual optically pumped magnetometers and a three-component VLF-EM receiver system. The survey was flown by helicopter between June 21 and June 25, 2026, at a median terrain clearance of approximately 23 metres. Data acquisition utilised dual optically pumped magnetic sensors operating at 1,000 measurements per second, combined with a VLF-EM receiver measuring three orthogonal magnetic field components. This technological approach provides substantially greater resolution than historical regional airborne geophysics datasets available in the region.
The survey covered a total area of 56.66 square kilometres, comprising 1,194 line-kilometres of flight lines spaced 50 metres apart with 500-metre control lines. According to the release, the high-resolution data is expected to improve geological interpretation by identifying major structures, fault systems, buried intrusive bodies, and other features that may control antimony, tungsten, and gold mineralization. The geophysical framework extends across both the historic Lake George Mine site and Hertz Energy's surrounding claim package, highlighting several magnetic and structural features interpreted to extend onto the company's property.
Exploration Targets and 2026 Field Program Design
Hertz Energy has designed a systematic three-stage exploration approach to advance the Lake George property from target generation through discovery toward potential resource delineation. The first phase comprises a prospecting and mapping program focused on known outcrop areas and potentially favourable locations identified through topographic and LiDAR surveys. This field work will include geological mapping, rock geochemistry analysis, and structural studies to characterize the mineralized systems on the property.
The second phase involves a soil geochemistry survey intended to evaluate potential for blind antimony-tungsten mineralization by assessing dispersion of geochemical signals in surficial materials. Final sample site selection will be based on local quaternary geology, satellite imagery, and LiDAR data. The third phase, contingent on results from earlier stages, includes ground-based induced polarization (IP) surveying to refine drill targets. The announcement states that positive IP results could be followed by up to 3,000 metres of diamond drilling later in 2026, though the company did not disclose specific timing or budget for this work.
Geological Framework and Mineralization Controls
The Lake George region hosts an intrusion-related hydrothermal system that has produced antimony, gold, tungsten, and molybdenum mineralization across the district. Hertz Energy's consolidated land position captures structural features interpreted to continue from the historic Lake George Mine, including a northeast-trending fault system within this broader mineralized framework. The company's property encompasses sections of thin glacial and lacustrine sediment cover that may conceal mineralization beneath shallow overburden, creating opportunities for discovery of buried deposits.
The geophysical survey data reveals multiple interpreted cross-cutting structures considered prospective for antimony, tungsten, and gold mineralization. Hertz Energy believes these structural and geological characteristics indicate potential for the mineralized system to extend onto its claims, although this interpretation remains to be tested through the planned exploration program. The company has also acquired the Lake George Mine historical database, which the release indicates provides additional technical foundation for targeting decisions.
Avenir Minerals as Regional Neighbour and Industry Development
Avenir Minerals, a subsidiary of Agonic Eagle Mines, was selected by the New Brunswick government to explore and potentially restart the historic Lake George Antimony Mine site itself. This selection followed a call for expressions of interest issued by the New Brunswick Ministry of Mines and reflects the provincial government's Comprehensive Minerals Strategy aimed at revitalizing mineral sector activity and boosting domestic production of critical minerals. Hertz Energy stated in the announcement that it looks forward to cooperating with Avenir Minerals on future collaboration regarding exploration and development in the Lake George region, though no specific joint venture or partnership terms were disclosed.
The involvement of a major mining company subsidiary in neighbouring exploration activity may signal renewed commercial interest in the Lake George district. Avenir Minerals' selection to negotiate an exclusive exploration agreement for the former mine site underscores the region's strategic importance to domestic critical mineral supply chains. However, Hertz Energy does not own, control, or hold exploration rights to the former mine site itself; the company's interest is limited to its surrounding claim package.
Critical Mineral Designation and Market Context
Antimony has been designated a critical mineral by authorities in both Canada and the United States due to its essential applications in defence, electronics, and renewable energy infrastructure. The metal serves multiple industrial purposes, with its largest end-use in flame retardant applications, while also being used in solar panels, batteries, armour-piercing ammunition, infrared sensors, and precision optics. The U.S. Department of the Interior included antimony on its critical minerals list specifically because of these strategic applications and supply vulnerability.
China announced antimony export restrictions in August 2024 that took effect on September 15, 2024, creating significant implications for the global antimony supply chain. Chinese antimony exports are in medium-term structural decline due to rising domestic demand from the country's solar energy sector, while Russian supply has been affected by lower output and international sanctions. Major producing nations including Vietnam, Tajikistan, and Myanmar have experienced supply disruptions related to rerouting of shipments from the Red Sea due to maritime security concerns. These combined factors have created a supply-constrained market environment for antimony globally.
Hertz Energy's Diversified Exploration Portfolio
Beyond the Lake George Antimony-Tungsten-Gold Project, Hertz Energy maintains a diversified mineral exploration portfolio across eastern Canada and Yukon. The company holds a 100%-owned Harriman Antimony Project in the Gaspé Region of Quebec, positioning the company to participate in multiple antimony-bearing districts. The company is also focused on advancing the Crag and Rod properties in east-central Yukon, which include the Craig silver-lead-zinc deposit situated within the Craig Belt—a recognized prospective sub-belt of the approximately 175-kilometre-long Rackla Belt known for hosting some of Yukon's highest-grade silver-lead-zinc and gold mineralization.
Hertz Energy's Agastya Lithium Project in James Bay, Quebec comprises 209 mineral claims spanning approximately 10,650 hectares across three non-contiguous blocks within the James Bay greenstone belt. The property is positioned adjacent to significant lithium discovery activity in the region, including the Adina and Galinée projects that have been consolidated by LI-FT Power. The Agastya claims fall within a lake bottom sediment anomaly trend indicating potential for LCT pegmatite mineralization, providing the company with exposure to one of Canada's emerging lithium districts.
Technical Qualifications and Data Integrity
Scientific and technical information regarding the Lake George Project presented in this announcement has been prepared and approved by Paul Teniere, P.Geo., Technical Advisor to the company and a Qualified Person for the purposes of National Instrument 43-101. Scientific and technical information relating to the Agastya Project has been prepared and approved by Louis Martin, P.Geo., Technical Advisor to the company, who is also considered a Qualified Person under NI 43-101. Both professionals are responsible for the accuracy and validity of technical statements made regarding their respective projects.
The announcement includes a cautionary statement noting that Hertz Energy contains no interest in, ownership of, or exploration rights to the former Lake George Antimony Mine site itself or adjacent properties. Information regarding geology, mineralization, and historical production on adjacent or other properties is not necessarily indicative of mineralization potential on the company's own properties, the release states. Readers are advised that mineral exploration involves inherent uncertainty and exploration results cannot be guaranteed.
Forward-Looking Statements and Risk Factors
The announcement contains forward-looking information regarding the interpretation and usefulness of the airborne survey data, generation and prioritization of exploration targets, scope and timing of the company's planned 2026 exploration program, and expectations regarding antimony and critical mineral markets. These statements are based on assumptions including availability of capital, personnel, permits, and supportive commodity prices. Forward-looking information reflects management expectations as of July 16, 2026, and involves risks and uncertainties that could cause actual results to differ materially from current expectations.
Key uncertainties include the inherent uncertainty of mineral exploration and the risk that no economically viable mineralization may be identified on the company's properties. Additional risks include the possibility that geophysical or geological interpretations may prove incorrect, challenges in securing adequate project financing, volatility in antimony and other commodity prices, permitting and regulatory delays, environmental considerations, Indigenous consultation requirements, and mineral title disputes. General economic and market conditions may also adversely affect the company's ability to advance its exploration programs as planned. Readers should not place undue reliance on forward-looking information.



Please wait processing your request...