LAURION Mineral Exploration Inc. (TSX-V: LME | OTC: LMEFF | FSE: 5YD) has released assay results from drill holes LBX26-109 and LBX26-110 at its 100%-owned Ishkōday Gold and Polymetallic Project in Northwestern Ontario. Highlights include a 9.90 m interval grading 0.563 g/t gold and a 4.55 m interval grading 0.76% copper and 12.29 g/t silver, with deeper unexpected gold-bearing intervals also encountered. The results add geological information to a project the company is working to advance toward a potential maiden Mineral Resource Estimate.
Key Points
- LAURION Mineral Exploration Inc. (TSX-V: LME | OTC: LMEFF | FSE: 5YD)
- Assay results released from drill holes LBX26-109 and LBX26-110 at the Ishkōday Project, approximately 220 km northeast of Thunder Bay, Ontario
- Top intercepts include 9.90 m at 0.563 g/t Au and 4.55 m at 0.76% Cu and 12.29 g/t Ag; Phase 1 drilling expanded from 3,865 m to 5,605 m across 22 holes
- Investors may be watching for additional assay results as the expanded Phase 1 program continues
Key Intercepts from LBX26-109 and LBX26-110 at Ishkōday
Drill hole LBX26-110 returned the program's headline intercepts, including 9.90 m grading 0.563 g/t gold from 205.70 m to 215.60 m, with a higher-grade sub-interval of 2.30 m grading 1.693 g/t gold. The hole also intersected 4.55 m grading 0.76% copper and 12.29 g/t silver from 80.45 m to 85.00 m, including 1.70 m at 1.56% copper and 24.45 g/t silver. A 3.70 m interval grading 0.246 g/t gold, 8.04 g/t silver, 0.60% copper and 1.08% zinc was also reported. Drill hole LBX26-109 returned narrower intervals, including 1.20 m at 0.670 g/t gold near surface. The company notes all core lengths are drilled thicknesses and true widths have not yet been determined.
Unexpected Deeper Intervals Add New Geological Data to the A-Zone
LAURION highlighted that LBX26-110 encountered two deeper gold-bearing intervals — the 9.90 m zone and a separate 6.00 m interval from 238.00 m to 244.00 m near contact with the pluton — that were described as unexpected. The company states these intercepts are associated with silicification of a shear zone and possible disseminated pyrite, and provide new geological information for potential follow-up evaluation. The release characterises these results as expanding understanding of the mineralised system beyond previously tested areas, adding context as LAURION works to refine its geological model of the A-Zone.
Phase 1 Drilling Expanded as SRK Structural Analysis Guides Targeting
LAURION has increased its planned Phase 1 drilling from 3,865 metres to 5,605 metres across 22 drill holes. The expansion is informed by an independent structural gap analysis completed by SRK Consulting, which identified five priority target areas within the A-Zone where additional drilling may address gaps in the existing drill database. The company states it is using this framework alongside ongoing results to prioritise near-term drilling as it advances the A-Zone toward a potential maiden Mineral Resource Estimate. The release notes that specific targets, sequencing and timing remain subject to ongoing results and available financing.




Please wait processing your request...