MAX Power Mining Corp. (CSE: MAXX; OTC: MAXXF; FSE: 89N) has completed its third well in the commercial validation drill program at the Lawson Natural Hydrogen Discovery in south-central Saskatchewan, reporting the highest Natural Hydrogen readings recorded at the project to date. The Lawson 4 well intersected a highly prospective 20.5-metre interval in the basal Cambrian Sandstone immediately above the Precambrian basement complex, along with 30.9 additional metres of elevated readings in mafic-ultramafic source rocks. With the Lawson 4 results in hand, the company announced that drilling preparations for Lawson 5 — a 30-kilometre step-out to the northeast — are now underway.

Key Points

  • MAX Power Mining Corp. (CSE: MAXX; OTC: MAXXF; FSE: 89N) operates Canada's first confirmed subsurface Natural Hydrogen system at Lawson, Saskatchewan
  • Lawson 4 intersected a 20.5-metre interval with strong permeability and porosity at 2,290–2,310.5 metres depth, with a total cored interval of 51.4 metres at 98% recovery
  • Total well depth reached 2,400 metres, with multiple zones of Natural Hydrogen and Helium interest identified from the Interlake Formation to the Precambrian basement
  • Investors will be watching upcoming completions testing across multiple Lawson wells and results from the Lawson 5 step-out drilling program

Lawson 4 Core Results and the Basal Cambrian Sandstone Interval

The Lawson 4 well was drilled to a total measured depth of 2,400 metres and returned what the company describes as the most significant interval to date. A 20.5-metre section between 2,290 and 2,310.5 metres in the basal Cambrian Sandstone — immediately above the Precambrian basement complex — was cored at 96.6% recovery and featured the highest Natural Hydrogen readings recorded at Lawson based on drill rig gas detection equipment. An additional 30.9 metres of core was recovered below that interval, yielding very elevated Natural Hydrogen readings and highly favourable mafic-ultramafic source rocks, bringing total cored length to 51.4 metres at 98% recovery.

Deep Crustal Conduit Adds New Structural Dimension to Lawson Complex

A significant finding at Lawson 4 is the identification of a deep crustal fault — described as a conduit for potential gas migration — encountered beginning at 2,310.5 metres. The company states that the dip, strike, and full extent of this sub-vertical structure remain unknown, and that upcoming core analysis and geophysical data review by independent evaluator GLJ will be critical to assessing its significance. The release states that the relationship between the basal Cambrian Sandstone and the Precambrian basement complex may provide an important combination of gas migration pathways, reservoir development, structural trapping, and seal integrity.

Lawson 5 Step-Out Targets "Salt Wall" Trap 30 km to the Northeast

Drilling preparations for Lawson 5 are underway, representing the company's largest geographic step-out yet at the Lawson project. The well is designed to test a potential up-dip extension of the Natural Hydrogen system toward the "Salt Wall," a structural trap flanking the Prairie Evaporite approximately 30 kilometres to the northeast. The company also disclosed a two-month investor marketing and consulting agreement with RazorPitch, Inc., effective September 14, 2026, for a cash fee of USD $100,000, with no securities issuable as compensation. No specific commercialisation model for its MAXX LEMI exploration platform has yet been adopted.