MAX Power Mining Corp. (CSE: MAXX; OTC: MAXXF; FSE: 89N) has released results from its Lawson 4 well in south-central Saskatchewan, reporting the highest Natural Hydrogen readings recorded to date at the Lawson Discovery. The third completed well of the company's commercial validation drill program intersected a highly prospective 20.5-metre interval in the basal Cambrian Sandstone, featuring strong permeability, porosity, and elevated gas readings. The company has simultaneously commenced preparations for Lawson 5, a 30-kilometre step-out well targeting the northeastern extent of the system toward what management describes as the "Salt Wall" flanking the Prairie Evaporite.

Key Points

  • MAX Power Mining Corp. (CSE: MAXX; OTC: MAXXF; FSE: 89N) operates Canada's first confirmed subsurface Natural Hydrogen system at Lawson, Saskatchewan
  • Lawson 4 delivered the highest Natural Hydrogen readings to date across a cored 20.5-metre interval at 2,290–2,310.5 metres depth, with 96.6% core recovery
  • Total cored interval reached 51.4 metres at 98% recovery; well completed to a total measured depth of 2,400 metres with multiple zones of Natural Hydrogen and Helium interest
  • Investors may be watching the outcome of completions testing across multiple Lawson wells and results from the Lawson 5 step-out drill program

Lawson 4 Coring Results and Basal Cambrian Sandstone Interval

The Lawson 4 well intersected a 20.5-metre interval between 2,290 and 2,310.5 metres measured depth in the basal Cambrian Sandstone, sitting immediately above the Precambrian basement complex and a deep crustal fault interpreted as a potential gas migration conduit. Core recovery reached 96.6% for this section and 98% across the full 51.4-metre cored interval. The release states that the additional 30.9-metre core section contained elevated Natural Hydrogen readings and favourable mafic-ultramafic source rocks. The well reached a total measured depth of 2,400 metres, with multiple zones of interest identified for both Natural Hydrogen and Helium.

Geological Significance of the Deep Crustal Conduit at Lawson

MAX Power's release highlights a deep crustal fault beginning at 2,310.5 metres whose dip, strike, and extent remain unknown, with upcoming core analysis and a review of geophysical data by independent evaluator GLJ expected to assist in characterising the structure. The company's evolving geological model suggests the relationship between the basal Cambrian Sandstone and the Precambrian basement may deliver a combination of gas migration pathways, reservoir development, structural trapping, and seal integrity. Chief Geoscientist Steve Halabura described Lawson 4 as "a discovery within a discovery" in the announcement, noting anticipation for perforations and comprehensive completions testing across the program.

Lawson 5 Step-Out Targeting 30-km Extension Toward the Salt Wall

Drilling preparations for Lawson 5 are underway, representing the company's largest step-out yet at approximately 30 kilometres northeast of the existing cluster of four wells drilled within roughly 2 kilometres of each other. The target is the up-dip extension of the Lawson Natural Hydrogen system toward the "Salt Wall," described as an ideal trap-and-seal structure flanking the Prairie Evaporite. CEO Ran Narayanasamy noted in the release that the four existing wells collectively represent just 0.001% of the 1,224 square kilometre Lawson permit area, itself a fraction of MAX Power's 475-kilometre Genesis Trend.

MAXX LEMI Exploration Platform and New Marketing Agreement

Alongside its drilling update, MAX Power disclosed that its MAXX LEMI (Large Earth Model Integration) exploration framework is being developed as a potential commercial intelligence platform, with pathways under consideration including technology licensing, subscription access, technical services, and joint venture participation. The company cautioned that no specific commercialisation model has yet been adopted. Separately, MAX Power disclosed a two-month investor marketing and consulting agreement with RazorPitch, Inc., effective September 14, 2026, for a cash fee of US$100,000, with no securities issuable as compensation.