Omega Pacific Resources Ltd. (CSE: OMGA) (OTCQB: OMGPF) (FSE: Q0F) has announced the commencement of its 2026 drill program at the Williams Property in British Columbia's Toodoggone District, with drilling having begun on September 14, 2026. The multi-phase program targets up to 5,000 metres in total, with an initial phase of 1,000 to 2,000 metres focused on extending gold mineralization at the West GIC target. Investors may be watching closely given the company's stated ambition to confirm potential for a multimillion-ounce gold deposit at the site.

Key Points

  • Omega Pacific Resources Ltd. (CSE: OMGA) (OTCQB: OMGPF) (FSE: Q0F)
  • The company has commenced a multi-phase 5,000 m drill program at the Williams Property, West GIC gold target, in British Columbia's Toodoggone District
  • Initial drill phase began September 14, 2026 and is anticipated to be completed by mid-October 2026; drone LiDAR and magnetic surveys are also planned for GIC West and ROI targets
  • Investors should watch for assay results, which the company states will be released as they are received and interpreted

West GIC Target and 2024 Drill Program Results Underpinning 2026 Campaign

The 2026 program builds directly on the company's initial 2024 drill campaign at Williams, where gold mineralization was encountered in all four holes drilled. Highlights from that earlier program include hole WM24-01, which returned 1.69 g/t Au over 104 metres, including 6.22 g/t Au over 18.98 metres, and hole WM22-02 ext., which returned 2.16 g/t Au over 96.9 metres. The release also notes that hole WM22-03, located 600 metres east of 2024 drilling, intersected 4.64 g/t Au over 8 metres, providing a lateral reference point for the 2026 program's strike-extension testing.

Drill Design Targets Up-Dip, Down-Dip, and Along-Strike Extensions at Williams

The 2026 drill plan is structured to test multiple directional extensions of the known West GIC mineralised zone. The release states the program will include holes targeting shallower, up-dip extensions connecting drilled gold mineralisation to the Park Gossan and gold-rich surface samples, as well as along-strike holes probing lateral continuity to the east. The company notes that anomalous gold and pathfinder elements in soils and mapped alteration extend across approximately 5,500 metres from West GIC to the ROI target, indicating a broad exploration corridor warranting systematic drill testing.

Geophysical Surveys Planned Alongside Drilling at GIC West and ROI

In addition to the core drilling activities, Omega Pacific has outlined plans for drone LiDAR and magnetic surveys across the GIC West and ROI targets. These surveys are intended to complement drill results by improving the company's understanding of geological structures and critical units controlling gold mineralisation distribution across the property. With drill pads at West GIC confirmed as complete, the initial phase is expected to conclude by mid-October 2026. The Qualified Person for the technical disclosure is Robert L'Heureux (P.Geol.), Director of Omega Pacific Resources. The immediate share price impact was not clear from available public information.