Akanda Corp. (NASDAQ: AKAN) has announced that its wholly owned subsidiary, First Towers & Fiber Corp. (FTF), has completed physical installation of a 200-kilometre fibre optic network in Mexico. The first 100 kilometres have been formally accepted by a network provider client and entered the billing phase, with initial lease cash flow expected in August or September 2026. The milestone marks a significant step toward recurring revenue for the emerging telecom infrastructure developer.

Key Points

  • Akanda Corp. (NASDAQ: AKAN) and subsidiary First Towers & Fiber Corp. (FTF)
  • FTF has completed installation of a 200-kilometre fibre optic network in Mexico, with the first 100 kilometres now in the billing phase
  • Remaining 100 kilometres scheduled for client acceptance by December 2026; full commercial run-rate cash flow projected from January 2027
  • Investors may be watching whether client acceptance of the second 100-kilometre segment proceeds on schedule

FTF's 200-Kilometre Fibre Network Now Fully Installed Across Mexico

First Towers & Fiber Corp. has completed the physical installation of its full 200-kilometre fibre optic network, a key infrastructure milestone for the company. The first 100 kilometres — representing 50 percent of the total network — have already been formally accepted by a network provider client and have entered the billing phase. The release states that initial lease cash flow from this segment is expected during August or September 2026. The remaining 100 kilometres are targeted for formal client acceptance by December 2026, after which the entire network is projected to reach full commercial run-rate cash flow beginning January 2027.

FTF's 28-Tower Portfolio Continues Generating Passive Infrastructure Revenue

Alongside its fibre deployment, FTF maintains a portfolio of 28 cellular tower sites, all of which the company describes as fully operational and actively radiating signal. The company's business model centres on passive infrastructure, leasing tower assets to a growing roster of network providers rather than operating active carrier services itself. The announcement characterises this tower portfolio as a continuing and complementary revenue base alongside the fibre network, though specific revenue or financial figures for the tower segment were not disclosed in the announcement.

Guanajuato Expansion Targets Irapuato-Silao Industrial Corridor

The fibre deployment also represents a geographic expansion for FTF into the Guanajuato region of Mexico, with a specific focus on the Irapuato-Silao industrial corridor. The company characterises this corridor as a key local market that it believes strengthens its regional presence and service reach. Chris Cooper, President of FTF, stated that completing installation of the full 200-kilometre network and bringing the first half into billing is a meaningful step toward recurring revenue growth, and expressed satisfaction at extending FTF's footprint into Guanajuato to strengthen its position with key regional partners.