American Pacific Mining Corp. (CSE: USGD) announced on October 6, 2026 that it has engaged Colog, Inc. to conduct downhole geophysical and structural surveys in drill hole M26C-02 at its 100%-owned Madison Copper-Gold Project near Silver Star, Montana. The surveys follow a significant high-grade intersection — 30.8 metres averaging 7.40 g/t gold, 9.62 g/t silver, and 0.29% copper — reported in September 2026. Results are intended to refine the geological model and guide planned step-out drilling to test the continuity and extensions of the massive sulfide zone, a development investors in early-stage copper-gold explorers may find notable.

Key Points

  • American Pacific Mining Corp. (CSE: USGD | OTCQX: USGDF) is a British Columbia-incorporated precious and base metals explorer focused on the Western United States.
  • The company has engaged Colog, Inc. to conduct downhole geophysical and structural surveys in drill hole M26C-02 at its Madison Copper-Gold Project in Montana.
  • M26C-02 previously intersected 30.8 m averaging 7.40 g/t gold, 9.62 g/t silver, and 0.29% copper, including a higher-grade interval of 7.92 m averaging 25.33 g/t gold, 29.6 g/t silver, and 0.86% copper.
  • Investors may be watching how survey results refine drill targeting and whether follow-up step-out holes confirm continuity of the high-grade zone.

Downhole Survey Methods Planned for M26C-02 at Madison

The survey program will include acoustic televiewer, optical televiewer, induced polarization/resistivity, and inductive conductivity measurements. Acoustic and optical televiewer surveys will provide oriented images of the borehole wall, enabling the technical team to measure the orientation of mineralized contacts, bedding, fractures, and other geological features. The company states these observations will help constrain the geometry of the sulfide body relative to surrounding host rocks. Induced polarization/resistivity and inductive conductivity surveys may also be included to characterise the electrical properties of intersected rocks, complementing borehole imagery, core logging, and assay data.

High-Grade Massive Sulfide Intersection Underpins Survey Rationale

The survey program follows the high-grade assay results disclosed in the company's September 9, 2026 announcement. Drill hole M26C-02 returned 30.8 metres averaging 7.40 g/t gold, 9.62 g/t silver, and 0.29% copper. Within that interval, a higher-grade sub-interval of 7.92 metres averaged 25.33 g/t gold, 29.6 g/t silver, and 0.86% copper. The release notes all reported intervals are downhole lengths and that true widths have not yet been determined. The massive sulfide zone intersected in M26C-02 is described as remaining open down dip and along strike, with the company planning follow-up drilling toward the west-southwest.

Survey Data to Refine Geological Model and Position Step-Out Holes

According to the release, survey results will be incorporated into the geological model to refine the interpreted dip and dip direction of the massive sulfide body, identify geological contacts and structures controlling mineralisation, guide drill-hole orientations and target depths for planned step-outs, and support drilling designed to establish continuity between known intersections. Eric Saderholm, P.Geo., Managing Director of Exploration and the designated Qualified Person under National Instrument 43-101, has reviewed and approved the technical content of the announcement. Continuity, thickness, and grade beyond existing intersections will be evaluated through follow-up drilling, the release states.