Antimony Resources Corp. (CN: ATMY) has announced high-grade antimony assay results from drill hole BH-26-14 at its Bald Hill project in New Brunswick, reporting 11.41% antimony over 1.55 metres within a broader 2.78% antimony zone spanning 11.3 metres. The company also disclosed geological descriptions of stibnite mineralization intersected in six drill holes at the newly identified Central Zone, located approximately 200 metres south of the Main Zone. These results expand the company's understanding of mineralization patterns across multiple zones at the property.
Key Points
- Antimony Resources Corp. (CN: ATMY) reported assay results from Main Zone drill hole BH-26-14 at Bald Hill
- Drill hole BH-26-14 returned 11.41% antimony (Sb) over 1.55 metres and 2.78% Sb over 11.3 metres, with associated gold values averaging 0.41 grams per tonne
- Central Zone drilling intersected stibnite-bearing breccia in six drill holes at depths of approximately 100 to 150 metres; assay results for these holes have not yet been received
- The company continues infill drilling in the Main Zone and preliminary testing of the newly discovered Central Zone to evaluate deposit continuity
Main Zone Results Extend High-Grade Antimony Mineralization
Drill hole BH-26-14 in the Main Zone returned two distinct mineralized zones at depths of 130 and 165 metres. The higher-grade interval yielded 11.41% antimony from 132.0 to 133.55 metres, situated within the wider 11.3-metre interval grading 2.78% antimony. A secondary zone between 165.35 and 168.0 metres returned 7.48% antimony. Gold mineralization associated with the stibnite averaged 0.41 grams per tonne across the main interval, with some sections exceeding 1 gram per tonne. These results support the company's assertion that Bald Hill represents a high-grade antimony deposit with mineable widths, and drilling indicates mineralization remains open in multiple directions.
Central Zone Drilling Identifies Stibnite-Bearing Breccia Below Surface
Six drill holes completed at the Central Zone have identified stibnite-bearing breccia similar in style to mineralization observed in the Main Zone and surface trenches. Geological descriptions based on core logging indicate zones of breccia containing stibnite occurring at depths of approximately 100 to 150 metres. Drill hole BHC-26-03 intersected three zones of stibnite-bearing breccia over approximately 35 metres of drill hole length. The company notes that assay results for these Central Zone holes have not yet been received; current descriptions are based on visual geological observations only. Once assays are received, the company stated these intersections can be fully evaluated.
Bald Hill Project Scope and Exploration Strategy
The Bald Hill antimony project comprises a main mineralized zone spanning over 600 metres in length and extending to depths of at least 350 metres, with average mineralization widths of 4 to 5 metres grading 3% to 4% antimony. A 2025 technical report estimated potential quantities of approximately 2.7 million tonnes with grades between 3% and 4% antimony; however, the company notes this represents a conceptual target and insufficient exploration has been completed to define a mineral resource. The company has also identified new zones through soil sampling approximately 3 kilometres south of the Main Zone on recently acquired claims, expanding the property's exploration potential.



Please wait processing your request...