Big Gold Inc. (CSE: BG) has completed a comprehensive historical data compilation at its 100%-owned Martin Kenty Project in northwestern Ontario, identifying numerous prioritized gold exploration targets and compiling high-grade historical drill intercepts. The review, which began in May 2026, integrated geological, geochemical, geophysical and drilling datasets spanning four decades of operator records. The company is advancing a summer 2026 field program with a contractor agreement expected to be finalized in the coming weeks.
Key Points
- Big Gold Inc. (CSE: BG) has completed historical data compilation at its Martin Kenty Project in the Kenora Mining Division, northwestern Ontario.
- The review identified multiple high-priority gold exploration targets based on integrated historical datasets and compiled significant historical drill intercepts, including 96.56 g/t Au over 0.38 metres at the Penn Showing.
- Historical intercepts compiled include 31.00 g/t Au over 0.49 metres in the Heronry area and multiple additional notable holes with gold grades ranging from 1.02 to 24.90 g/t Au.
- A summer 2026 field program agreement with an exploration contractor is at an advanced stage, expected to execute within weeks, with results to guide future drilling decisions.
Scope and Completion of Historical Data Review
Big Gold announced on July 21, 2026, that it has completed a historical data compilation and target-generation review at the Martin Kenty Project. The review commenced on May 27, 2026, and was designed to identify numerous prioritized gold exploration targets through the integration of historical geological, geochemical, geophysical and drilling datasets. The work was led by Morgan Verge, P.Geo., a Qualified Person under National Instrument 43-101.
The compilation reviewed and digitized all publicly available assessment reports covering the Martin Kenty Project, including historical drilling records, airborne geophysical surveys, regional geological mapping, regional and property-scale geochemical surveys, and other relevant exploration datasets. Historical work on the ground was carried out by operators including Noranda Exploration, Canadian Nickel, Barrier Reef Resources, Granges Exploration, Rio Algom Exploration, Wasabi Resources and Vanity Capital between 1975 and 2017. This represents a comprehensive review spanning over four decades of exploration activity.
High-Grade Historical Drill Intercepts Compiled
The compilation identified and documented numerous historical drill intercepts of gold mineralization at the Martin Kenty Project. The most significant compiled intercept returned 96.56 g/t Au over 0.38 metres from 28.56 metres downhole in historical hole 70449 at the Penn Showing. This intercept is hosted within a quartz-carbonate vein enclosed by a mineralized wall-rock envelope containing pyrite, arsenopyrite and chalcopyrite, with 12 specks of visible gold noted in the historical log.
A second notable intercept returned 31.00 g/t Au over 0.49 metres from 37.26 metres downhole in historical hole 70471-0 in the Heronry area, from a smoky grey, pyrite-rich, chloritic quartz-carbonate vein parallel to foliation, surrounded by a gradational light green to white fuchsite alteration halo. The Penn Showing historical intercepts also include four additional holes with grades of 24.90 g/t Au over 0.26 metres, 5.45 g/t Au over 1.46 metres, 5.30 g/t Au over 0.49 metres, and 5.12 g/t Au over 0.61 metres.
Complete Table of Historical Drill Intercept Data
The announcement includes a comprehensive table documenting 27 historical drill intercepts spanning a range of gold grades. The intercepts vary from 96.56 g/t Au down to 1.02 g/t Au, with core lengths ranging from 0.22 metres to 1.52 metres. Notably, the announcement specifies that these are core lengths as recorded in historical assessment filings and that true widths are unknown. The company has emphasized that these intercepts pre-date National Instrument 43-101 and the Company's involvement with the property.
According to the disclosure, Big Gold has not independently sampled, twinned or otherwise verified the historical drill holes, and the original sample preparation, analytical and quality-assurance/quality-control procedures cannot be confirmed. The Qualified Person has not done sufficient work to verify the historical results, and the Company is not treating them as current, verified exploration results. The announcement notes that verification would require confirmatory work such as core review or twinned drilling, which the Company may undertake as part of future programs.
Integration of Multi-Disciplinary Datasets for Target Ranking
The compilation integrated geological, geochemical and geophysical datasets to identify areas of coincident significance, allowing exploration targets to be ranked from high to lower priority based on overall prospectivity. The ranked target set, together with the compiled historical drill intercepts, is illustrated in a project map dated July 12, 2026. According to Morgan Verge, P.Geo., the methodology identified areas where multiple data types suggested mineralization potential, providing a systematic basis for prioritizing future exploration work.
The announcement states that the integrated datasets were incorporated into the project's exploration target ranking to guide future exploration and drill planning. This systematic approach to data compilation and target generation reflects standard industry practice for consolidating legacy exploration information and preparing it for field-based follow-up programs. The objective is to use the compiled information to focus on the most prospective areas before committing resources to drilling.
Summer 2026 Field Program Status and Expected Scope
Big Gold has announced that an agreement with a field exploration contractor for the planned summer 2026 field program at Martin Kenty is at an advanced stage, with execution expected in the coming weeks. As of the date of the announcement, no agreement has been executed, and the program remains subject to final terms, permitting and financing. The company stated that it will provide program details by separate news release once the agreement is executed.
The planned field program is designed to follow up the ranked targets generated by the compilation on the ground, with the objective of refining target priorities and helping to determine locations for potential future drilling. This field-based validation step is typical in exploration programs and is intended to narrow the focus from desktop analysis to on-site investigation before advancing to drilling. The timing of the program during the 2026 summer season aligns with optimal field conditions in Ontario.
Regional Context and Adjacent Exploration Activity
The Martin Kenty Project lies within the same regional tenure area as SEVA Mining Corp.'s Cameron Deposit, located along trend to the northeast of Big Gold's project area. The announcement notes that SEVA has publicly reported a Mineral Resource Estimate at Cameron of 0.515 million ounces of gold Measured and Indicated at 2.44 g/t Au and 0.740 million ounces of gold Inferred at 2.18 g/t Au. The Cameron Deposit is a third-party asset owned by SEVA Mining and is referenced solely as regional district context.
Big Gold has explicitly stated that it does not own any interest in the Cameron Deposit and has cautioned that proximity to projects containing gold resources offers no assurance that the rock types, mineralization or gold resources reported by SEVA Mining and others extend onto the Company's project. The company notes that such proximity is not necessarily indicative of the mineralization reported by third parties with projects in the district. This disclosure reflects standard practice in exploration announcements and emphasizes that investors should not assume that adjacent discoveries indicate similar mineralization on the Company's own tenements.
Martin Kenty Project Overview and Exploration Stage
The Martin Kenty Project is one of Big Gold's two flagship Ontario exploration properties, alongside the Tabor Project. The announcement emphasizes that the Project is at an early stage of exploration. Historical exploration at the Martin Kenty Project has identified multiple occurrences of gold mineralization through surface sampling and prospecting programs completed by previous operators and the Company.
During Big Gold's 2022 exploration program, grab samples returned values of up to 8.37 g/t Au and 8.04 g/t Au, helping define priority exploration areas associated with favourable intrusive and structural settings prospective for gold mineralization. These surface results from the Company's own work have been incorporated into the current target-ranking framework generated by the historical data compilation.
Qualified Person Review and Verification Status
Morgan Verge, P.Geo., is identified as the Qualified Person as defined by National Instrument 43-101 and has reviewed and approved the scientific and technical information contained in the announcement. The Qualified Person's role is to ensure that exploration information disclosed to investors meets professional standards and regulatory requirements. However, the announcement clarifies that references to mineral resources, historical estimates, and exploration results on adjacent or regional properties are provided for contextual purposes only and are not necessarily indicative of the mineralization potential of Big Gold's projects.
The announcement further notes that third-party information, including historical drill results from previous operators and the mineral resource estimate on SEVA Mining's adjacent property, has not been independently verified by Big Gold or the Qualified Person. This distinction is important for investors to understand: while the Qualified Person has reviewed Big Gold's own work and the company's analysis of historical data, the historical intercepts themselves pre-date NI 43-101 and have not been subjected to modern verification protocols.
About Big Gold Inc. and Forward-Looking Information
Big Gold Inc. is a junior mining exploration company with initial focus on conducting exploration programs on the Martin Kenty and Tabor projects located in Ontario. The Company's stated objective is to acquire and explore early-stage base and precious metal projects, with a focus on Ontario-based assets. The announcement includes standard forward-looking information disclaimers, noting that the company's ability to execute its planned programs is subject to various assumptions including access to the property, weather and field conditions, availability of qualified personnel and contractors, availability of financing, receipt of required permits and regulatory approvals, and the absence of material adverse changes in commodity prices.
The announcement cautions that although management believes the expectations and assumptions underlying forward-looking statements are reasonable, undue reliance should not be placed on forward-looking information. Forward-looking statements contained in the announcement are made as of July 21, 2026, and the Company disclaims any intent or obligation to update publicly any forward-looking information, whether as a result of new information, future events or results.



Please wait processing your request...