Bighorn Metals Corp. (CSE: HRNY) has announced it is advancing preparations for a Phase I exploration program at its Marietta Project in Nevada's Silver Star Mining District. The company highlighted extensive historical mine workings and reported multi-metal occurrences — including gold, silver, copper, and base metals — as the basis for systematic follow-up exploration. The disclosure also notes the company intends to assess whether the project warrants exploration for rare earth elements, adding a layer of commodity optionality that investors may be watching closely.
Key Points
- Bighorn Metals Corp. (CSE: HRNY) is an exploration-stage company with mineral property interests in Nevada and British Columbia.
- The company is advancing a Phase I exploration program at the Marietta Project, focused on compiling historical records, mapping workings, and targeted sampling.
- Historical records report values of up to 66.1 g/t gold, 169 g/t silver, and 4.3% copper, though these results have not been independently verified by the company.
- Investors should watch for permitting progress, financing availability, and results from the independent NI 43-101 technical report being prepared by Qualified Person Gregory C. Ferdock.
Historical Workings at Marietta Project Underpin Bighorn's Exploration Rationale
The Marietta Project consists of 12 patented lode mining claims and an adjoining townsite parcel located in Mineral County, Nevada. Historical records describe a network of mine workings — including shafts, adits, declines, and prospect pits — across several named areas such as Black Hawk, Silver Gulch, Endowment, Birdsong, and Badger. The company states these workings are expected to serve as starting points for geological mapping, sampling, and evaluation of mineralisation controls. A 2008 unpublished report referenced by the company describes a sample from the Black Hawk area assaying 186.59 ounces per ton silver, though Bighorn has not independently verified this result.
Unverified Sampling Results Flag Multi-Metal Opportunity Requiring Confirmation
Historical sampling conducted in April 2005 reportedly returned values of up to 66.1 g/t gold, 169 g/t silver, and 4.3% copper, with additional anomalous readings for antimony, bismuth, and tellurium. The company and its Qualified Person have not yet independently verified the sampling procedures, locations, or quality assurance protocols associated with these results. Bighorn explicitly cautions that the historical data should not be relied upon as representative of mineralisation on the project. The Phase I program is specifically designed to generate modern geological and analytical data to evaluate these figures systematically.
Rare Earth Element Assessment Added to Bighorn's Geological Review Scope
Beyond precious and base metals, Bighorn states it intends to assess available geological information to determine whether rare earth element exploration at Marietta is warranted. The company is clear that no mineral resource containing rare earth elements has been established on the project, and that additional fieldwork and analytical testing would be required before any such determination could be made. An independent technical report is being prepared by Gregory C. Ferdock, M.Sc., C.P.G., in accordance with National Instrument 43-101. Mr. Ferdock has not yet completed a site visit or independently verified historical sampling results.
Phase I Program Scope Subject to Permitting, Financing, and Field Conditions
The proposed Phase I program encompasses historical record compilation, geological reconnaissance, targeted rock and soil sampling, and the relocation and mapping of historical workings, subject to access and safety conditions. The company notes the program's scope, timing, and completion remain subject to permitting, financing availability, personnel, and seasonal conditions. No assurance is provided that the activities will be completed as contemplated. The immediate share price impact was not clear from available public information.




Please wait processing your request...