CopperCorp Resources Inc. (TSXV: CPER | OTCQB: CPCPF) has announced a fully permitted, two-phase diamond drilling program totalling approximately 1,750 metres at its 100%-owned Jasper Hills Project in western Tasmania, Australia. Phase 1 mobilisation is scheduled for January 2027, with drilling to commence in the first quarter of 2027. The program is supported by a A$100,000 co-funding grant awarded through the Tasmanian Government's Exploration Drilling Grant Initiative. Investors may be watching the results closely given the high-grade copper-gold grades previously recorded at surface at the project.

Key Points

  • CopperCorp Resources Inc. (TSXV: CPER | OTCQB: CPCPF) announced a fully permitted drill program at Jasper Hills, Tasmania
  • A two-phase, four-hole diamond drilling campaign totalling approximately 1,750 metres has been designed to test high-priority electromagnetic targets beneath historical copper-gold workings
  • Phase 1 comprises 800 metres across two holes; Phase 2 comprises 950 metres across two follow-up holes, subject to Phase 1 results
  • Investors should watch Phase 1 drill results, expected following a January 2027 mobilisation, for confirmation of the modelled electromagnetic conductor beneath Old Jasper

Phase 1 and Phase 2 Drill Targets at Old Jasper, Jasper Hills

The Phase 1 program consists of two diamond drill holes totalling 800 metres. The first hole, planned to 450 metres, will test beneath the historical Old Jasper copper-gold mine workings and a modelled southwest-dipping VTEM conductor plate. The second hole, planned to 350 metres and collared approximately 320 metres west, will target a downhole electromagnetic conductor plate and the down-dip extension of the VTEM conductor. Phase 2, totalling 950 metres across two follow-up holes, will test interpreted down-dip and along-strike extensions and is contingent on Phase 1 outcomes. Historical shallow drilling at the site dates to 1988 and 2013 and is considered inconclusive due to drilling difficulties and incomplete sampling.

High-Grade Surface Geochemistry Supporting the Jasper Hills Drill Case

CopperCorp's 2023 rock-chip sampling at Jasper Hills returned grades of up to 16.45% copper and 10.10 g/t gold from grab samples collected at the Old Jasper prospect. The company notes that rock-chip grab samples are selective in nature and may not represent average mineralisation grades across the prospect. A greater-than-155 parts-per-million copper-in-soil anomaly delineates the trend between Old Jasper and New Jasper across a surface area of approximately 1 kilometre by 500 metres. Mineralisation is interpreted as potentially related to a volcanogenic massive sulphide-style primary system of Cambrian age, with possible later remobilisation during Devonian granite intrusion events.

Tasmanian Government Grant and Refined Corporate Focus

The A$100,000 co-funding grant from the Tasmanian Government's Exploration Drilling Grant Initiative provides partial financial support for the Jasper Hills drill program. The announcement also reflects a narrowed corporate strategy following the previously disclosed binding agreement to divest the Skyline tenements to Bubalus Resources Limited (ASX: BUS), announced October 26, 2026. CopperCorp states it is now concentrating exploration activity on its two core Tasmanian assets: the AMC Project covering 556 square kilometres and the Jasper Hills Project covering 70 square kilometres. The company describes its approach as "drill or kill" — drilling quickly and deciding rapidly whether to continue based on results.