Cosa Resources Corp. (TSXV: COSA) has released results from its summer drilling program at the Darby uranium project in northern Saskatchewan, announcing the intersection of anomalous radioactivity and significant structural geology across two prospective trends. The Darby project is a joint venture in which Cosa holds a 70% operating interest alongside Denison Mines Corp., located 10 kilometres west of Cameco's Cigar Lake Mine. The results support a fully funded follow-up drill campaign scheduled to commence in January 2027, with simultaneous drilling planned at both Darby and the Murphy Lake North joint venture.
Key Points
- Cosa Resources Corp. (TSXV: COSA | OTCQB: COSAF | FSE: SSKU) released summer drill results for the Darby joint venture with Denison Mines Corp.
- Drill hole DB26-43 intersected anomalous radioactivity of 950 CPS over 0.5 metres at the Gamma trend, associated with hydrothermal alteration
- Four holes totalling 2,741 metres were drilled; geochemical assays remain pending and are expected to guide follow-up targeting
- Investors may be watching for the company's 2027 drilling plan update and pending geochemical assay results from summer drilling
Gamma Trend Drilling Extends Structural Zone and Flags Parallel Corridor
Two holes were drilled at the Gamma trend, building on winter 2026 results that had already identified a broad zone of structure, alteration, and anomalous uranium geochemistry. Hole DB26-43 intersected the unconformity 22 metres lower than the previous winter hole, increasing total unconformity relief on section to 57 metres. Anomalous radioactivity of 950 CPS was recorded over 0.5 metres, associated with hematite, limonite, and argillization. A second hole, DB26-45, drilled 1,600 metres south along strike, intersected a 37-metre interval of faulting in the upper sandstone, which the company interprets as potentially reflecting an additional and untested structural corridor.
Bravo Trend Outlines Kilometre-Scale Hydrothermal System
Two holes at the Bravo trend tested 2.2 kilometres of previously untested strike length, targeting graphitic faulting and zones associated with historical weak uranium mineralisation. Hole DB26-44 intersected lower sandstone faulting and alteration, with the unconformity 41 metres lower than in historical hole DB-12. Hole DB26-46, drilled 800 metres east along strike, intersected variably graphitic gneiss with weak to moderate hydrothermal alteration. The company states that the combined results suggest drilling at both holes narrowly bracketed the target graphitic horizon, indicating Bravo hosts a significant, kilometre-scale hydrothermal system warranting follow-up work guided by pending geochemical assays.
Fully Funded 2027 Campaign Targets Both Darby Trends Simultaneously
The company states that follow-up drilling at Darby is fully funded and tentatively scheduled to commence in January 2027, running simultaneously with drilling at the Murphy Lake North joint venture. Gamma is identified as the priority target, with planned geophysical surveys to refine drill targets within a 1,600-metre corridor of structure, alteration, and anomalous uranium that remains open along a four-kilometre trend. At Bravo, follow-up will be guided by pending geochemical assay results. Cosa's disclosure states that the technical information was reviewed and approved by Andy Carmichael, P.Geo., Vice President Exploration, as Qualified Person under National Instrument 43-101.



Please wait processing your request...