Engineer Gold Mines Ltd. (TSX-V: EAU | OTC: EGMLF) has announced the completion of its 2026 infill diamond drill core sampling program at the TAG Property, part of its 100%-owned Engineer Gold Project in northwestern British Columbia. A total of 538 drill core samples spanning 685 metres from 20 holes have been selected and are being shipped to MSA Labs in Prince George for gold-silver and multi-element analysis. The results will inform drill targeting and support a future resource estimate at TAG, making this a potentially meaningful milestone for investors tracking the project's advancement.

Key Points

  • Engineer Gold Mines Ltd. (TSX-V: EAU | OTC: EGMLF | WKN: A3EEVJ)
  • 538 infill diamond drill core samples totalling 685 metres from 20 holes completed at the TAG Property, 30 kilometres southwest of Atlin, BC
  • Samples sent to MSA Labs in Prince George for gold-silver photon assaying and multi-element ICP analysis; continued 2027 sampling is contingent on these results
  • Investors will be watching assay results, which are expected to guide diamond drill targeting and facilitate a future resource estimate at TAG

TAG Property Sampling Targets Gaps in Historical Drill Coverage

The 2026 infill sampling program focused on addressing gaps within and adjacent to previously sampled intervals along the TAG Property's 025FZ structure — a 6-kilometre gold-silver bearing corridor. The company noted that unsampled zones share the same rock types, quartz veining, and stringers as intervals that were previously assayed. The historical drilling program conducted by CZM Capital Corp. between 2006 and 2008 consisted of 69 holes totalling 11,524 metres. Engineer Gold Mines' independent Qualified Person, Linda Dandy, P.Geo., reviewed available drill logs, sample intervals, and core on site, deeming the historical data reliable for guiding future exploration.

Significant Historical Intersections Underpin TAG Exploration Rationale

Historical diamond drilling at TAG returned several notable gold-silver intervals that support the property's continued exploration. These include hole TAG06-23, which assayed 1.7 g/t Au and 5.1 g/t Ag over 26.7 metres; hole TAG07-29, which returned 1.3 g/t Au and 5.9 g/t Ag over 35.0 metres; TAG08-51, grading 1.8 g/t Au and 7.4 g/t Ag over 24.3 metres; and TAG08-59, assaying 1.5 g/t Au and 8.05 g/t Ag over 42.1 metres. These results, drawn from published assessment reports, form the basis for the company's view that infill sampling and further drilling could support resource definition work.

Compiled Data to Drive Resource Estimate Planning at Engineer Gold Project

Once assay results are received, the company states it will compile and model the drilling data to generate diamond drill targets designed to facilitate the completion of a resource estimate at TAG. The Engineer Gold Project encompasses approximately 18,319 hectares and includes three principal target areas: the TAG Property, the historic Engineer Gold Mine, and the Wann River prospect. Continued sampling in 2027 will depend on outcomes from the current phase. The immediate share price impact was not clear from available public information.