Getchell Gold Corp. (CSE: GTCH) has announced results from a preliminary economic assessment on its 100%-owned Fondaway Canyon gold project in Nevada, reporting a pre-tax net present value of US$1 billion at an 8% discount rate and a 58.8% pre-tax internal rate of return. The assessment outlines an open pit mining operation producing approximately 150,000 ounces of gold annually over a planned 10-year mine life, representing a 28% increase in contained ounces and a greater than 60% increase in NPV compared to the company's previous 2025 assessment. The project would require initial capital costs estimated at US$265 million and could rank among Nevada's top 10 gold mining operations by annual production.
Key Points
- Getchell Gold Corp. (CSE: GTCH, OTCQB: GGLDF) announced a preliminary economic assessment for its Fondaway Canyon gold project in Nevada.
- The PEA reports a US$1 billion pre-tax NPV8% with a 58.8% pre-tax IRR at a US$3,200 per ounce gold price assumption.
- The project contemplates recovery of 1.52 million ounces of gold over 10 years with average annual production of 150,000 ounces; initial capital costs are estimated at US$265 million with a 1.5-year pre-tax payback period.
- The assessment represents a 28% increase in gold ounces and over 60% increase in NPV compared to the company's 2025 PEA, supported by an updated mineral resource estimate and refined metallurgical testing.
Fondaway Canyon Economics Show Strong Project Margins and Rapid Capital Recovery
The preliminary economic assessment demonstrates robust financial metrics under base case assumptions of a US$3,200 per ounce gold price. The project is modelled to generate a pre-tax NPV of US$1,004 million at an 8% discount rate and an after-tax NPV of US$905 million at the same discount rate. These valuations reflect strong project economics with a pre-tax internal rate of return of 58.8% and an after-tax IRR of 53.1%.
The capital expenditure estimate of US$265.3 million, including a 20% construction contingency, supports a pre-tax payback period of 1.5 years and an after-tax payback of 2.0 years. Over the life of mine, the project is expected to generate US$1,889 million in pre-tax cash flow and US$1,589 million in after-tax cash flow. The sensitivity analysis included in the assessment indicates that at a higher gold price of US$4,000 per ounce (the High Case), the after-tax NPV8% could reach approximately US$1.524 billion with an IRR of approximately 85%, while a lower gold price of US$2,400 per ounce would result in an after-tax NPV8% of US$251 million with a 20.0% IRR.
Operational Parameters Support 10-Year Mine Life at 12,000 Tonnes Per Day
The assessment contemplates an open pit mining operation utilizing contract mining, with a processing throughput of approximately 12,000 tonnes per day or 4.2 million tonnes per annum. The mine plan is designed to process 42.8 million tonnes of ore over the 10-year life of mine, generating 1.52 million ounces of recovered gold at an average mill feed grade of 1.38 grams per tonne gold. The operational model achieves an estimated 80% gold recovery to sales following post-processing activities.
The project incorporates a life-of-mine stripping ratio of 6.9 to 1 waste material to processed ore, with 296.3 million tonnes of waste material to be extracted alongside the orebody. Life-of-mine average operating costs are estimated at US$1,373 per ounce produced, while cash costs including transportation, refining charges, and royalties are estimated at US$1,740 per ounce produced. The operation will produce a high-grade gold concentrate, estimated at approximately 20 grams per tonne gold, which will be sold to a third-party processing facility in Nevada for final pressure oxidation or roasting followed by cyanidation to produce doré.
Mineral Resource Base Expands Significantly with April 2026 Updated Estimate
The preliminary economic assessment is supported by an updated mineral resource estimate completed in April 2026 by APEX Geoscience Ltd., with an effective date of April 13, 2026. The updated estimate reports a 54% increase in indicated mineral resources and an 8% increase in inferred mineral resources relative to the previous 2024 mineral resource estimate, based on the inclusion of 10 additional drill holes. The global mineral resource estimate now totals 22.1 million tonnes of indicated mineral resources grading 1.40 grams per tonne gold, containing 999,000 ounces of gold, and 45.6 million tonnes of inferred mineral resources grading 1.24 grams per tonne gold, containing 1.812 million ounces of gold.
The PEA's economic model is based solely on open pit mineral resources in the Central Area of the project, which represent approximately 68% of the globally defined mineral resource. The assessment does not include the Main Pit's underground mineral resource or the open pit mineral resources outside the Central Area along the gold corridor. The company notes that the mineral resource remains open along strike and at depth, with significant potential for expansion across a largely underexplored 7-kilometre east-west gold corridor covering a 10 square-kilometre prospective area.
Metallurgical Testing Confirms Amenability to Conventional Flotation Processing
Development work completed in 2026 has refined understanding of the mineralized material's amenability to conventional flotation and generation of a low mass pull, high-grade concentrate. A conceptual flotation plant has been designed to process both oxide and sulfide mineralization, with the PEA utilizing estimated gold recoveries of 84% to concentrate and 80% to sold metal. The process flowsheet consists of three stages of crushing followed by ball mill grinding, rougher flotation, and three stages of cleaner flotation in open circuit to produce high-value concentrate.
The assessment notes that additional metallurgical test work is recommended for the Fondaway Canyon project to optimize grind size, refine the open circuit flotation process, and define the dry stack tailings process and associated costs. The processing design incorporates xanthate, AP 404, and AF 65 as flotation reagents. Gravity concentration will be applied to cleaner flotation tailings, with the gravity concentrate combined with the flotation concentrate and gravity tailings combined with rougher tailings, filtered, and dry stacked.
Capital Cost Breakdown Reflects US$265 Million Total Construction Investment
The capital cost estimate for constructing the Fondaway Canyon project totals US$265.3 million, including a 20% construction contingency. The initial process capital cost is estimated at US$100.0 million, with preproduction and facilities estimated at US$57.0 million, bringing initial capital expenditure to US$188.4 million. Capitalized stripping costs over the first four years of operation are estimated at US$76.9 million, reaching the total life-of-mine capital expenditure of US$265.3 million.
Capital costs are based on published industry averages in the United States and reflect the use of contract mining services. The assessment does not incorporate sustaining capital requirements, as the 10-year life of the plant is expected to encompass the economically viable ore. Maintenance costs are included in the project's operating expense estimates rather than treated as capital expenditure.
Comparison to 2025 PEA Demonstrates Significant Study Advancement
The 2026 preliminary economic assessment represents a substantial advancement from the company's previously published 2025 PEA released on February 7, 2025. The updated assessment reports a 28% increase in both contained ounces of gold and average annual gold production compared to the prior study. More significantly, the base case NPV has increased by greater than 60% despite being based on the same mine plan and operating assumptions as the previous assessment.
The improvements are attributed to a simplified process flowsheet, increased annual throughput capacity, and the incorporation of the higher base case gold price assumption of US$3,200 per ounce in the 2026 study. The refined metallurgical understanding and the updated mineral resource estimate incorporating the results of 10 additional drill holes have enabled the company to model a more efficient and economically attractive operation.
Fondaway Canyon Positioned as Potential Top 10 Nevada Gold Producer
According to management commentary in the announcement, the projected annual gold production of 150,000 ounces would likely position Fondaway Canyon among the top 10 gold mining operations in Nevada by annual output. This production level represents a substantial milestone for the project and for the company's development strategy. The assessment demonstrates that the project economics support the development of a robust open pit mining operation at this scale.
Company President Mike Sieb stated that the PEA "readily demonstrates the potential for a robust economic open pit mining operation producing 150,000 ounces of gold per year" and noted that "the mineralization remains open for expansion with continued drilling success aiming to further enhance the mine model and extend the operation's longevity." Chairman Bob Bass commented that "the strong economics outlined in this PEA support my high expectation for the Fondaway Canyon gold project and underscore the significant valuation upside potential for Getchell Gold Corp."
Technical Study Prepared by Independent Consultants with NI 43-101 Compliance
The preliminary economic assessment was prepared by SLR Consulting of Fort Collins, Colorado, as the lead consultant in accordance with National Instrument 43-101 standards for disclosure of mineral projects. SLR served as the lead study manager for mine planning, design parameters, and operating and capital cost estimates. The assessment was supported by DM Consulting LLC, which conducted metallurgical studies, process design, and plant site infrastructure work, and APEX Geoscience Ltd., which completed the mineral resource estimate. The effective date of the PEA is June 1, 2026.
Qualified persons overseeing key components of the assessment include Jonathan R. Heiner, SME-RM, from SLR Consulting for the minable resource estimate; Deepak Malhotra, SME-RM, from DM Consulting for metallurgical testing and mineral processing; and Donald E. Hulse, SME-RM, from SLR Consulting for the overall PEA report and economic analysis. Kevin Hon, B.Sc., P.Geo., Senior Resource Geologist from APEX Geoscience, is the independent qualified person for the mineral resource estimate, with a peer review completed by Michael Dufresne, M.Sc., P.Geo., President and CEO of APEX. Patrick McLaughlin, P.Geo., VP Exploration at Getchell Gold Corp., reviewed and approved the scientific and technical information in the news release.
Mineral Resources Not Yet Converted to Reserves; Further Work Required
The company emphasizes that mineral resources reported in the assessment are not mineral reserves and have not demonstrated economic viability. The PEA is preliminary in nature and includes inferred and indicated mineral resources that are considered too speculative geologically to be categorized as mineral reserves. The disclosure states that there is no certainty that the PEA results will be realized. The company notes that there has been insufficient exploration to date to define the inferred resources as indicated or measured mineral resources, though it is reasonably expected that most inferred mineral resources could be upgraded to indicated resources with continued exploration.
The company cautions that there is no guarantee that any part of the mineral resources will be converted into a mineral reserve in the future. The mineral resource estimate may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues. The announcement notes that a technical report for the project including the PEA will be filed on the System for Electronic Document Analysis and Retrieval (SEDAR) within 45 days of the news release date.
Getchell Gold Maintains Focus on Nevada Gold and Copper Exploration
Getchell Gold Corp. is a Nevada-focused gold and copper exploration company trading on the Canadian Securities Exchange under the ticker GTCH, on the OTCQB under the ticker GGLDF, and on the Frankfurt Bourse under the ticker GGA1. The company is primarily directing its efforts toward its most advanced stage asset, Fondaway Canyon, described as a past gold producer with a large mineral resource estimate. The company's strategic focus remains on advancing the Fondaway Canyon project toward potential development and production.




Please wait processing your request...