LAURION Mineral Exploration Inc. (TSX-V: LME | OTC: LMEFF | FSE: 5YD) has released assay results from two drill holes completed during its 2026 Phase 1 diamond drilling program at the 100%-owned Ishkōday Gold and Polymetallic Project in Northwestern Ontario. Hole LBX26-112 returned a headline intersection of 1.20 m grading 6.58 g/t gold, alongside a 6.00 m interval grading 0.206 g/t gold, 19.8 g/t silver, 0.28% copper, and 0.83% zinc. The results extend the Company's geological understanding of the A-Zone–McLeod system as it works toward a potential maiden Mineral Resource Estimate.

Key Points

  • LAURION Mineral Exploration Inc. (TSX-V: LME | OTC: LMEFF | FSE: 5YD)
  • Assay results from drill holes LBX26-111 and LBX26-112 at the Ishkōday Project, approximately 220 km northeast of Thunder Bay, Ontario
  • Top intersections include 1.20 m at 6.58 g/t Au and a 0.50 m sub-interval at 1.795 g/t Au, 223 g/t Ag, 3.31% Cu, and 8.47% Zn; Phase 1 drilling expanded from 3,865 m to 5,605 m across 22 holes
  • Investors may be watching progress toward a potential maiden Mineral Resource Estimate and further assay results from the expanded program

Drill Hole LBX26-112 Delivers Standout Gold and Base Metal Intersections at McLeod Zone

Hole LBX26-112 targeted a gap in the McLeod mineralized horizon between drill holes completed in 2022. The best intersection returned 1.20 m grading 6.58 g/t gold from 78.80 m depth. A separate 6.00 m interval from 96.00 m graded 0.206 g/t gold, 19.8 g/t silver, 0.28% copper, and 0.83% zinc, including a high-grade 0.50 m sub-interval at 1.795 g/t gold, 223 g/t silver, 3.31% copper, and 8.47% zinc. A further 2.10 m interval from 231.00 m returned 175 g/t silver. All core lengths reported are drilled thicknesses; true widths have not yet been determined.

LBX26-111 Targets A-Zone Depth Continuation with Multiple Mineralised Intervals

Hole LBX26-111 was designed to probe the projected continuation of A-Zone mineralisation at depth, following geological and grade trends from earlier drilling. The hole returned multiple intervals, including 3.35 m grading 0.523 g/t gold from 92.30 m, with a 0.60 m sub-interval at 2.480 g/t gold. Additional intersections of 0.50 m at 1.255 g/t gold and 1.55 m at 0.494 g/t gold, 6.87 g/t silver, 0.14% copper, and 0.24% zinc were also recorded. The release states all QA/QC results were verified by the independent laboratory with no contamination or bias observed.

Phase 1 Program Expanded as SRK Structural Analysis Identifies Five Priority Targets

LAURION increased its planned Phase 1 drilling from 3,865 metres to 5,605 metres across 22 drill holes. The expansion is informed by an independent structural gap analysis conducted by SRK Consulting, which identified five priority target areas intended to address gaps in the existing drill database. The Company states the expanded program is designed to systematically advance the A-Zone toward a potential maiden Mineral Resource Estimate. The release notes that additional targets, sequencing, and timing remain subject to ongoing results and available financing.