Lion One Metals Limited (TSXV: LIO) has announced the purchase of a new Boart Longyear LM90 underground core drill for its 100% owned Tuvatu alkaline gold mine in Fiji. The acquisition is part of a renewed strategy to significantly expand production at the mine and will enable the company to drill Zone 500 and the West Zone from depth underground for the first time. The drill is expected to arrive by mid-October 2026 and will enhance Lion One's underground drilling capabilities with advanced technical specifications designed for deep and inclined drilling operations.

Key Points

  • Lion One Metals Limited (TSXV: LIO) (OTCQX: LOMLF) has acquired a new Boart Longyear LM90 underground core drill for its Tuvatu mine in Fiji
  • The LM90 drill features a maximum drill depth of 990 metres and can drill all dip angles from vertically up (+90) to vertically down (-90), enabling inclined and deep drillholes from underground for the first time
  • Delivery is anticipated by mid-October 2026, and a dedicated drill station off Level 1051 is currently under development
  • The new drill will expand Lion One's underground drill fleet to four underground drills and two active surface drills, supporting the company's goal to expand and upgrade resources in high-grade mineralization zones

LM90 Drill Specifications and Technical Capabilities

The Boart Longyear LM90 is a purpose-built underground core drill rig engineered specifically for mining operations in deep underground environments. According to the company announcement, the LM90 is capable of drilling to a maximum depth of 990 metres and can accommodate a full range of rod sizes from AQ to NQ specifications. The drill's operational envelope includes a full dip range from vertically up at +90 degrees to vertically down at -90 degrees, providing significant flexibility in drilling angles and directions.

The announcement states that the LM90's design enables the company to drill both inclined drillholes and deep drillholes from underground locations for the first time. This represents a substantial upgrade to Lion One's existing drill fleet, which the company notes will now consist of three Zinex U5 electric underground drills, one Zinex U5 diesel surface drill, one EDR450 track mounted surface drill, and the new LM90 underground drill. The company also owns two Hanjin D&B 30D surface drills which are not currently in service. The LM90 is smaller than Lion One's current underground drill fleet, allowing it to be transported through smaller development drifts that require less development time and capital investment.

Strategic Location and Underground Drill Station Development

A dedicated underground drill station for the LM90 is currently under development at the Tuvatu mine. The facility will be located at the end of an 80-metre drive off Level 1051 of the mine, positioned to the south of Zone 2. From this location, the drill will be positioned to effectively target high-grade mineralization in Zone 500, in the West Zone, and at an incline into Zone 5, as well as along strike of these zones.

The placement of this underground drill station represents a significant operational advancement for Lion One. The company's announcement emphasizes that Zone 500 and the West Zone have historically been targeted from drill positions at or near surface level. By enabling drilling from depth underground for the first time, the company expects to achieve shorter, quicker, and more cost-effective drillholes into these zones. The announcement notes that drilling from the underground station will provide better angles of intercept into the high-grade steeply dipping veins characteristic of these target areas, potentially improving exploration efficiency and resource definition.

Production Expansion Strategy and Resource Development

Lion One's announcement states that the primary intent of the LM90 drill purchase is to target both Zone 500 and the West Zone at depth to expand and upgrade the resource in these areas and ultimately increase production at depth at Tuvatu. The acquisition is positioned as part of a broader renewed strategy designed to significantly expand production at the Tuvatu alkaline gold mine.

The company's approach reflects a focus on leveraging underground drilling capabilities to access mineralization at greater depths. The announcement indicates that the ability to drill Zone 500 and the West Zone laterally from depth underground for the first time will be a key benefit of the LM90 installation. This capability is expected to support Lion One's objectives to expand the mineral resource base and support increased production rates at the mine. The company's existing underground mine and pilot plant operations, which were established in late 2023 according to the release, provide the infrastructure foundation for these expanded drilling programs.

Fleet Expansion and Operational Capacity

With the purchase of the LM90 drill rig, Lion One's total operating drill fleet will expand to six drills. The company currently operates three Zinex U5 electric underground drills and one Zinex U5 diesel surface drill. In addition to these, Lion One operates one EDR450 track mounted surface drill, which is leased rather than owned. The new LM90 will be owned and operated by Lion One Metals, consistent with the company's approach to key operational assets.

The announcement notes that the company also possesses two Hanjin D&B 30D surface drills that are not currently in active service. The expanded fleet represents a material increase in Lion One's drilling capacity and flexibility. The diversity of drill types and capabilities in the fleet enables the company to conduct a range of drilling programs, from exploration drilling to resource definition and mine development activities. The expected arrival of the LM90 by mid-October 2026 will complete this fleet expansion.

Management Perspective on the LM90 Investment

Lion One President and Chief Executive Officer Ian Berzins commented on the strategic importance of the LM90 acquisition. The announcement quotes Berzins as stating: "The LM90 is an important purchase for Lion One Metals as it significantly increases the versatility and capability of our underground drill fleet. We will be able to drill Zone 500 and the West Zone effectively from a dedicated drill station underground for the first time. We're excited to get the drill on site and start targeting those areas as soon as possible."

This statement reflects management's view that the drill acquisition directly supports the company's operational objectives at Tuvatu. The emphasis on versatility and capability suggests that the LM90's technical features address specific drilling challenges and opportunities that Lion One has identified at the mine. The timeline reference to mid-October 2026 delivery provides investors with a specific milestone for when the drill is expected to begin contributing to the company's exploration and development programs.

Tuvatu Project Overview and Mineralization Zones

Lion One Metals is an emerging Canadian gold producer headquartered in North Vancouver, British Columbia. The company's primary asset is its 100% owned Tuvatu Alkaline Gold Project in Fiji. According to the announcement, the Tuvatu project comprises the high-grade Tuvatu Alkaline Gold Deposit, an underground gold mine, a pilot plant, and an assay laboratory. Operations at Tuvatu were established in late 2023.

The company also holds an extensive exploration license covering the entire Navilawa Caldera, which is described in the announcement as being host to multiple mineralized zones and highly prospective exploration targets. The focus of the LM90 drilling program on Zone 500 and the West Zone reflects Lion One's current resource definition priorities. These zones have been identified as containing high-grade steeply dipping veins that the company seeks to extend at depth. The underground mine infrastructure at Tuvatu provides the operational foundation for the LM90 drilling program outlined in this announcement.

Timeline for Delivery and Deployment

The announcement specifies that delivery of the new Boart Longyear LM90 drill is anticipated in mid-October 2026. This timeline provides Lion One with a defined period for completing the development of the dedicated drill station off Level 1051 and preparing the mine site for the drill's arrival and installation.

The concurrent development of the underground drill station and the manufacture of the drill represents a coordinated approach to ensure operational readiness when the equipment arrives. The company's announcement does not disclose the financial value of the LM90 acquisition or provide specific details regarding the budget allocation for the dedicated drill station development. Investors may be watching for future updates regarding the drill's operational commencement and the results of the initial drilling programs targeting Zone 500 and the West Zone.

Qualified Person Review and Technical Validation

The announcement includes a qualified person statement in accordance with National Instrument 43-101 (Standards of Disclosure for Mineral Projects). Melvyn Levrel, MAIG, Senior Geologist for Lion One Metals, is identified as the qualified person who has reviewed and approved the technical and scientific content of the news release. This provides investors with assurance that the technical claims regarding the drill specifications and their application at Tuvatu have been validated by a qualified professional with relevant expertise.

The inclusion of the qualified person statement is a standard requirement for technical disclosures by Canadian mineral exploration and development companies. It indicates that Lion One has followed regulatory protocols in presenting the technical aspects of the LM90 acquisition and its intended use at the Tuvatu mine.