Metalsource Mining Inc. (CSE: MSM) has announced the next phase of drilling at its Silver Hill Project in North Carolina, focusing on strike and down-plunge extensions of the highest-grade polymetallic mineralization identified to date. The program is anchored by results from Hole SH26-07, which returned 12.62 metres grading 3,786 g/t silver equivalent, including a best interval of 2.74 metres at 16,604 g/t silver equivalent. The company states the program simultaneously targets resource expansion and new district-scale discoveries, with an inaugural mineral resource estimate targeted for early 2027.

Key Points

  • Metalsource Mining Inc. (CSE: MSM / OTCQB: MSMMF / FSE: E9Z)
  • Expansion drilling launched at Silver Hill Project in Davidson County, North Carolina, targeting extensions of high-grade polymetallic mineralization
  • Hole SH26-07 best interval: 2.74 metres at 16,604 g/t silver equivalent, including 209.1 g/t gold; inaugural mineral resource estimate targeted for early 2027
  • Investors may watch for drill results evaluating strike and down-plunge continuity near SH26-07 and newly identified IP survey targets

Silver Hill Expansion Drilling Focuses on SH26-07 High-Grade Zone

The current drilling phase will concentrate on the area surrounding Hole SH26-07, which the company describes as one of its most significant intercepts to date. That hole returned 12.62 metres grading 3,786 g/t silver equivalent, with a highlighted interval of 2.74 metres at 16,604 g/t silver equivalent and 209.1 g/t gold, alongside silver, lead, and zinc. New drill platforms are being constructed west of the current drilling area to test deep extensions of the polymetallic system, while drilling temporarily transitions east to evaluate interpreted up-dip extensions and improve geological continuity between holes SH26-07, SH26-05, and SH25-02.

Dual-Rig Strategy Pursues Resource Continuity and District-Scale Targets

Metalsource is running a dual-track exploration strategy at Silver Hill. The primary drill rig is focused on expanding and strengthening known mineralization to support the planned inaugural resource estimate. Concurrently, a second drill rig is being prepared to evaluate newly identified high-priority targets generated through a recently completed property-scale induced polarisation survey. The company states this marks the first time it will simultaneously pursue deposit expansion and new discoveries beyond the historic mine footprint, which the release describes as an important evolution in the project's development.

Silver Hill Project Background and Technical Oversight

Silver Hill is a 1,225-acre property in Davidson County, North Carolina, situated within the Carolina Terrane and recognised as America's first silver-producing mine, with documented production history dating to 1839. Known mineralization extends to 550 metres from surface across a steeply trending series of lenses open in multiple directions. All scientific and technical content in the announcement has been reviewed and approved by Darcy Vis, B.Sc., P.Geo., President of Tripoint Geological Services Ltd., acting as Qualified Person under National Instrument 43-101. The company notes that analytical results remain pending at the time of the release.