Nevada Organic Phosphate Inc. (CSE: NOP) (OTCQB: NOPFF) has announced assay results from drill hole MM26-10 at its Murdock Mountain project in northeast Nevada, reporting a weighted average grade of 10.89% P2O5 over 3.60 metres of true thickness. The hole was drilled as a 1.5-kilometre step-out along strike, successfully intersecting the target Upper Phosphate Zone and extending confirmed phosphate mineralisation strike length to over 3 kilometres. The result adds to the company's ongoing effort to de-risk its geological model across a sedimentary system it describes as the only known large-scale organic certifiable sedimentary phosphate project in North America.

Key Points

  • Nevada Organic Phosphate Inc. (CSE: NOP) (OTCQB: NOPFF)
  • Hole MM26-10 returned 10.89% P2O5 over 3.60 metres (weighted average, true thickness) from the Upper Phosphate Zone at Murdock Mountain
  • The result extends confirmed strike length of phosphate mineralisation to over 3 kilometres; hole drilled at a 1.5-kilometre step-out
  • Investors may be watching for pending heavy metal and contaminant assay results, which the company states will be released when processed and reviewed

MM26-10 Assay Highlights and Upper Phosphate Zone Intersection

The assay table disclosed by Nevada Organic Phosphate shows individual one-metre samples within hole MM26-10 ranging from 2.37% P2O5 to a peak of 16.20% P2O5, with the highest-grade intervals concentrated between 195 and 197 metres downhole. The reported weighted average of 10.89% P2O5 over 3.60 metres of true thickness represents the Upper Phosphatic Zone composite. All sample preparation and analytical work was conducted by ALS Laboratories, an independent laboratory accredited to ISO/IEC 17025:2017, using ME-XRF24 whole-rock XRF fusion methodology for phosphorus oxide determinations.

Strike Extension Significance for the Murdock Mountain Geological Model

NOP's geological model interprets the Upper Phosphate Zone as a laterally extensive, nearly flat-lying sedimentary horizon within the Meade Peak Member of the Phosphoria Formation. The successful step-out at MM26-10 pushes the confirmed strike of phosphate mineralisation beyond 3 kilometres, a milestone the company characterises as foundational for future evaluation work. Director and P.Geo. Garry Smith stated in the release that each assay-confirmed step-out increases confidence in the scale potential of the sedimentary system. The company's broader project area covers a phosphate bed described as 6.6 kilometres long, with additional applications suggesting potential strike of over 30 kilometres.

QA/QC Standards and Qualified Person Oversight

The company implemented a QA/QC protocol consistent with NI 43-101 standards, including the insertion of blanks approximately every 11 samples and certified reference materials approximately every 22 samples. Analytical accuracy was verified against BAM 826-1, a certified reference material for phosphate slags issued by Germany's Federal Institute for Materials Research and Testing. The technical content of the release was reviewed and approved by Independent Qualified Person Kenneth N. Tullar, AIPG Certified Professional Geologist (CPG-11142). The company states it is satisfied that QA/QC results support the integrity of the reported phosphate grades.