NordX Metals Corp. (CSE: NRDX) has announced initial assay results from field reconnaissance and chip rock sampling programs across three 100%-owned Swedish uranium projects. The company identified high-grade uranium mineralisation at Norr Döttern, with values up to 0.27% U₃O₈, alongside gold and zinc mineralisation at Märrviken and anomalous uranium at Flistjärn. The results corroborate historical exploration work conducted by Swedish government agencies in the 1970s and 1980s, positioning the projects as exploration targets for systematic follow-up.

Key Points

  • NordX Metals Corp. (CSE: NRDX) confirmed uranium mineralisation across three Swedish exploration properties
  • Norr Döttern project returned the highest-grade uranium assays, with values reaching 2,735.7 ppm U₃O₈ and an average grade of 687 ppm U₃O₈ across thirteen analysed samples
  • Märrviken property demonstrated polymetallic potential with assay results including 2.87 g/t Au, 37.7% Zn, and 682 ppm U₃O₈; Flistjärn property showed anomalous uranium values up to 442 ppm U₃O₈
  • The company plans Q3 2026 mapping and scintillometer-guided chip sampling at Norr Döttern, followed by a Q4 2026–Q1 2027 winter drilling program

Norr Döttern Project Delivers High-Grade Uranium Results

The Norr Döttern property, located in Norrbotten County, Sweden, has yielded the most significant uranium assay results from NordX's initial sampling campaign. A total of 22 samples were collected and sent to ALS Global laboratories for analysis, with nine results still pending at the time of the announcement. Of the thirteen analysed samples, the average grade recorded 687 ppm U₃O₈, ranging from a low of 6.5 ppm U₃O₈ to a high of 2,735.7 ppm U₃O₈.

The three highest-assaying samples from Norr Döttern returned grades of 2,735.7 ppm U₃O₈, 2,128.5 ppm U₃O₈, and 1,928.0 ppm U₃O₈ respectively. One additional sample (M318456) returned anomalous silver and zinc values alongside uranium, recording 603.8 ppm U₃O₈, 64 ppm Ag, and 1,500 ppm Zn. The mineralisation was identified across various lithologies including episyenite, feldspar porphyry, felsic volcanic rocks, and granite, with samples classified as either boulder or outcrop occurrences.

Historical Drilling Intercepts and Unexplored Boulder Trains at Norr Döttern

The Norr Döttern licence encompasses an 8 km northeast-southwest structural corridor that was previously explored by Swedish state-owned companies SGU and SGAB between 1971 and 1985. During that period, 35 diamond drill holes were completed across three of five historically identified prospect areas. Historical drilling intercepted significant uranium-bearing intervals, including 11.9 metres grading 0.1% U₃O₈ from 18.6 metres downhole at Långträsk, which remains open in all directions, and 4 metres at 0.19% U₃O₈ from 66 metres downhole at Norr Döttern 1.

The company's technical team notes that the central prospects and the source of nearby boulder trains—which returned higher grades than the historical drilling results—have never been drilled. The Norr Döttern 2–Liessetjåkke prospect hosts the licence area's largest boulder trains, including an unverified historical trench report citing 3% U over 3 metres. This undrilled area is planned as the focus of a third-quarter 2026 mapping and scintillometer-guided chip sampling campaign, with the objective of defining drill targets for a Q4 2026–Q1 2027 winter drilling program.

Märrviken Property Demonstrates Polymetallic Mineralisation Signature

The Märrviken project, located in Västernorrlands and Jämtlands Counties, returned highly anomalous assay results indicating a polymetallic mineralisation system combining uranium with gold, zinc, and copper. A total of fifteen samples were collected from the property and submitted to ALS Global. Of eight uranium samples analysed, results varied from 1.9 ppm U₃O₈ to 681 ppm U₃O₈, with an average grade of 398 ppm U₃O₈.

The most significant multi-element results from Märrviken included 2.87 g/t Au with 0.21% Cu and 0.06% Zn in one outcrop sample, while separate massive sulphide outcrops returned zinc grades as high as 37.7% and 33.5%, coupled with anomalous gold and copper. Three samples delivered the highest uranium results: 681.6 ppm U₃O₈, 544.8 ppm U₃O₈, and 443.4 ppm U₃O₈. The licence overlies the Storsjön-Edsbyn Deformation Zone and hosts both structurally controlled uranium mineralisation and sulphide-hosted Au-Ag-Cu-Zn-Pb mineralisation associated with the Storkullen Prospect.

Historical Boulder Train Discovery and Unexplored Source at Märrviken

Historical exploration by the Swedish Geological Survey (SGU) in the 1970s identified a 2,000 by 400 metre train of 766 mineralised boulders at Märrviken, with some carrying percent-grade uranium. Subsequent drilling by SGU between 1979 and 1980 consisted of 11 holes that intersected low-to-medium-grade uranium mineralisation. The historical drilling of the massive sulphide occurrence also intersected high-grade zinc-lead-silver mineralisation and anomalous gold.

NordX's exploration team believes the true bedrock source of the high-grade boulders has not yet been identified, suggesting significant exploration potential beneath the surface samples. This interpretation aligns with the company's strategy of converting surface sampling results into drill-ready targets, particularly given the elevated grades observed in the float samples relative to historical subsurface work.

Flistjärn Property Testing Parallel Structural Zones

The Flistjärn project, an approved exploration licence located in Jämtland County, returned anomalous uranium values from eight outcrop samples submitted to ALS Global. One mineralised sample yielded 442.2 ppm U₃O₈, representing the highest individual assay result from the program. Five additional samples showed anomalous U₃O₈ content ranging between 10 and 84 ppm, with uranium results across all eight samples averaging 90.9 ppm U₃O₈ and ranging from 5.0 to 442.2 ppm.

The sampling program was designed to test the prospectivity of a northeast-striking fault running parallel to the historically interpreted zone of mineralisation previously defined by Mawson Resources in the mid-2000s. Mawson also undertook a radon cup survey at Flistjärn during the same period, obtaining positive results, though the company's eventual plans to drill never materialised. The Flistjärn property sits within a 20 kilometre-long corridor in the Olden tectonic window that is anomalous in uranium, with mineralisation considered to be granite-related and structurally controlled.

Historical Exploration Context and Government Recognition in Sweden

NordX's three Swedish projects benefit from a strong foundation of historical exploration work conducted by Swedish government agencies and predecessor explorers. Historical exploration by SGU spanning 1976 to 1985 and Mawson Resources' campaigns from 2005 to 2011 mapped uranium-anomalous corridors and documented multiple uranium occurrences across the company's licence areas. The company's announcement emphasises that the historically documented uranium occurrences and anomalies have never been drilled, indicating substantial unexplored potential.

The corroboration of NordX's current results with historical work by Swedish government agencies in the 1970s and 1980s suggests a consistent mineralisation signature across multiple time periods and exploration methodologies. This alignment strengthens the technical case for continued systematic exploration and enhances the credibility of the identified targets for the planned drilling campaigns.

Sampling Methodology and Quality Assurance Protocols

Boulder and outcrop samples were collected through manual rock chip sampling methods typical of early-stage prospecting programmes. All samples were logged, photographed, sealed, and shipped under chain-of-custody protocols to ALS Laboratories, an internationally recognised ISO/IEC 17025-accredited facility. At ALS, samples were dried, crushed, and pulverised to industry-standard specifications before multielement analysis.

The company disclosed that because boulder sampling was conducted non-systematically and intended only for early-stage geochemical indications, no quality assurance and quality control (QA/QC) measures such as blanks, standards, or field duplicates were inserted into the sample stream. The release notes that boulder sample values do not establish in-situ mineralisation, as they are transported glacial till indicating a potential bedrock source in the up-ice direction. The analytical methods employed—ME-MS89L, ME-MS61, ME-ICPORE, and Au-AA25—were selected based on mineralisation type, host-rock matrix, and target commodities.

Planned Exploration Activities and Drill-Target Development Timeline

NordX has outlined a phased exploration approach to advance its Swedish properties from surface sampling toward drilling programmes. At Norr Döttern, the company plans Q3 2026 mapping and scintillometer-guided chip rock sampling focused on the ND2–Liessetjåkke prospect, which hosts the licence area's largest boulder trains. This work is intended to define drill targets for a subsequent winter drilling programme scheduled for Q4 2026 to Q1 2027.

The company stated that work continues on Norr Döttern and other NordX properties with fieldwork progressing according to plan. President and Director Jonathon Franklin commented that the priority following the surface results is converting these findings into drill-ready targets, positioning the company to advance toward systematic drilling campaigns. The timeline reflects a methodical progression from early-stage reconnaissance toward more intensive exploration programmes as target definition improves.

Investment Considerations and Material Uncertainty Notes

Investors should note that boulder and float samples present inherent limitations as exploration indicators. Glacial transport of boulder samples means that higher grades observed in float material may originate from bedrock sources located at some distance up-glacier, and drilling may not successfully locate the in-situ mineralisation source. The company's forward-looking statements explicitly identify this as a risk: that boulder (float) samples may not be sourced from or proximal to a bedrock source and that drilling may not locate in-situ mineralisation.

Additional material uncertainties disclosed by NordX include permit title, transfer, validity, and renewal risks; the requirement for a separate Finnish Government licence under the Nuclear Energy Act before any uranium recovery; survey and drilling timing and results; risks associated with mineral exploration and development generally; metal and mineral prices; availability of capital and financing; regulatory approvals; environmental and permitting risks; and operational and technical difficulties. The immediate share price impact was not clear from available public information.