North Atlantic Titanium Corp. (CSE: NATO) announced on September 22, 2026, that it has received drilling permits from Québec's Ministère des Ressources naturelles et des Forêts for its Everett Titanium-Vanadium-Phosphate project near Havre-Saint-Pierre, Québec. The permits — a forestry activities permit (PAF) and a work-with-impact permit (ATI) — clear the way for a diamond drilling campaign targeting a mineral resource estimate. The project's multi-commodity profile, including potential vanadium and phosphate coproducts, positions it as a critical-minerals opportunity investors may be watching closely.
Key Points
- North Atlantic Titanium Corp. (CSE: NATO, OTCQB: NATQ.F, FSE: Y33)
- Québec regulators approved both PAF and ATI permits for diamond drilling at the 2,406-hectare Everett property
- Drilling plan targets approximately 25,000 m across 20 drill pads over 3 years, with depths mostly under 350 m; Corem composite sample graded 37.0% Fe₂O₃, 17.4% TiO₂, 0.18% V₂O₅, and 2.27% P₂O₅
- Investors will be watching progress toward a mineral resource estimate as Stage 1 drilling advances
Everett Drilling Permits Approved by Québec Regulators
The Québec MRNF has confirmed approval of both the PAF forestry permit and the ATI work-with-impact permit for drilling at the Everett property, held by North Atlantic Titanium under option from Romaine River Titanium Inc. The company's plan focuses on confirming historical 1951 and 1968 diamond drilling results in the northern area of the exposed Everett Oxide Body. The drilling program encompasses approximately 25,000 m across 20 drill pads, to be completed within 3 years, with most holes planned at depths of less than 350 m. Forest impact is described as minimal, with the company largely brushing out historical drill trails for site access.
Corem Metallurgical Results Highlight Multi-Commodity Potential
Independent Québec mineral-processing laboratory Corem analyzed a composite metallurgical sample from 17 sites across the Everett oxide body and reported that approximately 99% of oxide minerals consist of high-quality hemo-ilmenite, characterised by very low magnesium, manganese, and aluminium impurities and undetectable chromium. The weighted-average head grade measured by Corem came in at 37.0% Fe₂O₃, 17.4% TiO₂, 0.18% V₂O₅, and 2.27% P₂O₅. Together, hemo-ilmenite and apatite comprise over 50% of the sample, supporting the company's view that Everett represents a broader Fe–Ti–V–P critical-minerals opportunity rather than a conventional titanium project.
Everett's Distinction From the Nearby Lac Tio Deposit
The Everett Oxide Body sits approximately 3 km from Rio Tinto's Lac Tio Mine — the world's largest hard-rock ilmenite deposit — but the release states that Everett is not a direct analogue. Everett is hosted by a layered oxide-apatite-gabbronorite intrusion exhibiting semi-massive hemo-ilmenite with significantly lower Mg, Mn, Cr, and Al than Lac Tio, alongside notable apatite and vanadium content. The company's drilling strategy is designed to test this distinctive multi-commodity assemblage and, in success-contingent stages, advance toward a mineral resource estimate covering the northern portion of the oxide body between drilling sections 9N and 19N.
Elements08 Programme and Critical-Minerals Supply Chain Context
North Atlantic Titanium joined the Government of Québec–funded Elements08 Strategic Metals Excellence Centre programme on March 31, 2026, partnering with Romaine River, CTRI, Impact Global Solutions, and Corem to support metallurgical testing. CEO Dwayne Yaretz stated that the company's strategy aims to advance a domestic critical-minerals processing supply chain in Canada, supporting defence readiness and Western titanium metal production. The technical information in the announcement was approved by independent Qualified Person Julien Davy, P.Geo., M.Sc., MBA, under National Instrument 43-101 standards.




Please wait processing your request...