Provenance Gold Corp. (CSE: PAU | OTCQB: PVGDF) has announced that core drilling is underway at its Eldorado West Project in Malheur County, Oregon, marking the start of its 2026 exploration season. The program, contracted to Titan Drilling Ltd., has commenced in the Herman Area and is expected to continue through the fall, weather permitting. The 2026 campaign builds on a 7,562-metre two-rig drilling season completed in 2025, which confirmed broad gold mineralisation across multiple zones. Investors may be watching for assay results and progress toward a maiden mineral resource estimate.
Key Points
- Provenance Gold Corp. (CSE: PAU | OTCQB: PVGDF) is a precious metals exploration company focused on its flagship Eldorado West Project in Eastern Oregon
- Core drilling has commenced at the Herman Area within the Eldorado West Project in Malheur County, Oregon
- The 2025 program totalled 7,562 metres across the Tyee and Herman Areas, with top intercepts including 1.82 g/t Au over 116.74 metres and 1.56 g/t Au over 254.51 metres from surface
- Investors should watch for 2026 assay results and updates on progress toward a maiden mineral resource estimate
2026 Drilling Scope and Geological Consulting at Eldorado West
Titan Drilling Ltd. is conducting the 2026 core drill program, returning after its involvement in the 2025 campaign. Independently, APEX Geoscience Ltd. has been engaged to review and model all present and historical geological data to identify priority drill holes. This phase targets a defined portion of the northern area of Eldorado West, where existing data density is intended to support work toward a maiden mineral resource estimate. APEX will also complete a comprehensive geological assessment of the overall project, incorporating geophysical data, multi-element drill hole assays, and geological mapping to guide potential resource expansion.
What the 2025 Program Revealed Across the Tyee and Herman Areas
The 2025 two-rig campaign at Eldorado West totalled 7,562 metres, combining reverse circulation drilling of 5,538 metres across Zones 1 through 4 of the Tyee Area and stepping out approximately 730 metres south into the newly identified Herman Area. Diamond core drilling added a further 2,024 metres, focused on Herman and a previously untested corridor connecting Zones 2 and 3. Results confirmed broad, shallow-dipping mineralisation extending over 800 metres of strike length, with the system remaining open in all directions. Hole ED-29 returned 1.56 g/t Au over 254.51 metres from surface, while EC-09 returned 1.82 g/t Au over 116.74 metres.
Core Facility Infrastructure and QA/QC Procedures Supporting the Program
Provenance has secured a 1,600-square-foot facility in Vale, Oregon, approximately 40 minutes from the property, for core cutting, logging, and storage. Samples are submitted to ALS Global in Reno, Nevada, which is independent of the company and holds ISO/IEC 17025:2017 and ISO 9001:2015 accreditation. Gold determination is performed by PhotonAssay™ and 34-element ICP. The company's QA/QC program incorporates certified standards, blanks, and field duplicates inserted approximately every 30 metres. The release states no discrepancies were reported in reference samples for the 2025 program.


Please wait processing your request...