Puma Exploration Inc. (TSXV: PUMA | OTCQB: PUMXF) has announced that mechanical trenching is underway at its McKenzie Gold Project in Northern New Brunswick, targeting two advanced gold zones ahead of a planned fall and winter drilling campaign. The fully funded program follows a 2026 summer campaign of prospecting, geological mapping, and high-resolution drone magnetic surveying. The announcement builds on results from the company's inaugural 2026 drilling program, which confirmed gold mineralisation at depth at the RIM Gold Zone, and investors may be watching for assay results from the current trenching phase.
Key Points
- Puma Exploration Inc. (TSXV: PUMA | OTCQB: PUMXF) is advancing exploration at its 42,053-hectare McKenzie Gold Project in Northern New Brunswick.
- Mechanical trenching is underway at the RIM and Grog Gold Zones to extend mineralised corridors and define priority drill targets.
- The 2026 inaugural drilling program at RIM returned grades including 1.64 g/t Au over 7.75 m and 1.01 g/t Au over 10.40 m, per the July 21, 2026 release.
- Investors will be watching for trenching results and the company's subsequent fall and winter drill program targeting RIM, Grog, and at least one additional advanced target.
RIM Gold Zone Trenching Expands on 2026 Inaugural Drill Success
At the RIM Gold Zone, Puma is expanding surface exposures around a mineralised vein system following its inaugural 2026 drilling program, which confirmed gold mineralisation at depth and along strike. Results from that program, disclosed July 21, 2026, included 1.64 g/t Au over 7.75 m, 1.01 g/t Au over 10.40 m, and 0.35 g/t Au over 17.20 m. Structural work indicates gold-bearing quartz veins occur within a bedding-parallel shear system, with higher-grade shoots potentially plunging shallowly towards the WSW. Current trenching is focused on extending the mineralised corridor over a 200-metre extension on both sides of the existing zone.
Grog Gold Zone Targeted Using New Magnetic and LiDAR Data
Trenching has also begun at the Grog Gold Zone, approximately 30 kilometres from RIM, where previous operators reported drill intersections of 0.45 g/t Au over 31.05 m, 0.32 g/t Au over 42.25 m, and 0.37 g/t Au over 13.00 m. The release states that gold mineralisation at Grog is associated with NW-oriented late brittle faults and quartz veining. Puma is applying new magnetic data, LiDAR interpretation, and 2026 field observations to identify additional structures and prioritise trench locations. Current pits will be extended to better evaluate the strike potential of the mineralised system before drilling commences.
District-Scale McKenzie Project Context and Structural Analysis
McKenzie spans 42,053 hectares in Northern New Brunswick, lying just 7 kilometres west of the company's Williams Brook Project, which is optioned to Kinross Gold Corp. The project straddles the McKenzie Fault, a regional structure associated with high-grade gold quartz veins, stockworks, and breccias. Puma states it has identified more than 75 surface targets across the land package. Consulting structural geologist Scott Anderson, Ph.D., P.Geo., has contributed to the structural model, and results from sampling will be integrated with geological, geochemical, and magnetic datasets to inform the second round of drilling at McKenzie.




Please wait processing your request...