Questcorp Mining Inc. (CSE: QQQ) (OTCQB: QQCMF) (FSE: D910) has announced the commencement of its Phase 2B exploration program at the La Union Project in Sonora, Mexico, in joint venture with operator Riverside Resources Inc. The program marks a strategic shift from diamond drilling to reverse circulation (RC) drilling, targeting two key areas: Luis Hill and the Union Mine. Investors may be watching closely as Phase 2B builds directly on mineralisation results reported from earlier program phases.
Key Points
- Questcorp Mining Inc. (CSE: QQQ) announced the start of Phase 2B drilling at La Union with joint venture operator Riverside Resources
- Riverside has secured an RC drilling rig and commenced road work and drill pad construction following the conclusion of the rainy season
- Phase 2B targets Luis Hill, with an IP chargeability anomaly extending over 1 km along strike, and the Union Mine, where chip-channel sampling previously returned 20.2 g/t Au and 226 g/t Ag over 30 metres
- Investors should watch for drill results from the planned 350 m deep hole at Luis Hill and the 80 m step-out test at the Union Mine target
Shift to RC Drilling Targets Greater Efficiency at La Union
Questcorp and Riverside have transitioned from diamond core drilling to RC drilling for Phase 2B, a decision the companies state is intended to increase penetration rates, drill efficiency, and achievable hole depths. The release notes that the absence of water in core holes completed to date suggests cutting recovery should not be a concern at planned depths. Riverside completed road work and drill pad construction following the end of the rainy season before mobilising the RC rig to site.
Luis Hill Target: IP Anomaly and Sediment-Hosted Gold Mineralisation
At Luis Hill, Phase 2B drilling is planned to test a geophysical chargeability anomaly delineated during Phase 2A that extends over 1 km along strike. This anomaly coincides with the sediment-hosted gold mineralisation identified in Phase 1, which included a discovery hole of 0.3 g/t gold over 42 metres reported January 12, 2026. The zone remains open along strike and at depth. The planned drill hole is described as near-vertical and targeting approximately 350 metres depth, with cross-cutting feeder structures also identified as targets by Riverside's geology team.
Union Mine Target: Following Up on High-Grade Surface Sampling
At the Union Mine, Phase 2B will test continuity of a structure at an 80 m step-out along strike, supported by ground magnetic geophysics. Phase 2A hole UND26-013 previously intersected continuity of the historic Sproul manto mine with anomalous lead and zinc values. Rock chip-channel sampling along the Union Mine access wall returned 30 metres grading 20.2 g/t Au and 226 g/t Ag with 2.7% Zn. The structure is hosted in the Clemente Formation, a carbonate replacement deposit host unit, with potential for sediment-hosted gold in adjacent reactive shales.



Please wait processing your request...