Radisson Mining Resources Inc. (TSXV: RDS) (OTCQX: RMRDF) has closed a previously announced strategic private placement with Agnico Eagle Mines Limited, raising gross proceeds of approximately $57.16 million CAD. The transaction sees Agnico Eagle acquire 53,420,000 units at $1.07 CAD per unit, establishing a roughly 10.45% undiluted equity stake in Radisson. Proceeds will fund advanced underground exploration and infrastructure development at the 100%-owned O'Brien Gold Project in Abitibi, Québec, a development investors have been closely monitoring.

Key Points

  • Radisson Mining Resources Inc. (TSXV: RDS) (OTCQX: RMRDF)
  • Agnico Eagle acquired 53,420,000 units at $1.07 CAD per unit for gross proceeds of $57,159,400 CAD
  • Agnico Eagle now holds approximately 10.45% undiluted and approximately 14.90% partially diluted; securities subject to a hold period expiring January 2, 2027; placement remains subject to final TSX Venture Exchange acceptance
  • Investors may be watching how quickly underground ramp development and surface infrastructure construction advance at O'Brien using these funds

Agnico Eagle's Stake and Unit Structure in the Radisson Placement

Each of the 53,420,000 units issued to Agnico Eagle comprises one Class A common share and one-half of a common share purchase warrant. The release states that each whole warrant is exercisable at $1.39 CAD per share for a period of 60 months. The placement was conducted on a broker-free basis, with no commissions or finder's fees paid. Securities issued are subject to a statutory hold period expiring January 2, 2027, and the transaction remains subject to final TSX Venture Exchange acceptance, as disclosed in the announcement.

How O'Brien Gold Project Underground Development Will Be Funded

Radisson has confirmed that proceeds from the private placement will finance the launch of an advanced underground exploration programme at the O'Brien Gold Project, including development of an access ramp and associated underground and surface mining infrastructure. The company separately confirmed that its ongoing 140,000-metre extension drilling programme continues as planned and is funded from existing cash resources, meaning the Agnico Eagle capital is directed specifically toward underground infrastructure, not the current drill campaign.

O'Brien Project Resource Base and Preliminary Economic Assessment

According to the release, a Preliminary Economic Assessment dated July 2025 outlines O'Brien as a low-cost, high-value project with an 11-year mine life and significant growth potential based on existing regional infrastructure. Indicated mineral resources are estimated at 0.63 Moz (3.49 Mt at 5.59 g/t Au), with additional inferred mineral resources estimated at 1.69 Moz (10.37 Mt at 5.08 g/t Au). The project is located along the globally recognised Larder Lake-Cadillac Fault in the Bousquet-Cadillac mining camp of Abitibi, Québec. The immediate share price impact was not clear from available public information.