Red Canyon Resources Ltd. (CSE: REDC | OTCQB: REDRF) announced on August 6, 2026, that it has acquired 18 new mineral claims totalling 11,722 hectares adjoining its existing Osiris Project in central British Columbia, expanding its total land position by 129%. The British Columbia Mineral Titles Branch has confirmed the acquisition, bringing Red Canyon's total controlled area within the Quesnellia Island Arc to 27,114 hectares. The expansion positions the company to pursue additional copper and copper-gold porphyry targets across a significantly enlarged footprint, a development investors in junior exploration companies may be watching closely.

Key Points

  • Red Canyon Resources Ltd. (CSE: REDC | OTCQB: REDRF)
  • 18 new mineral claims totalling 11,722 hectares confirmed, expanding the Osiris Project land position by 129%
  • Total controlled area now 27,114 hectares; eight diamond drill holes totalling 2,079 m recently completed at the Camp target; up to 40 auger drill holes planned for mid-August 2026
  • Investors may watch for results from the planned auger drilling program and initial diamond drilling at Nautilus and EV targets in September 2026

New Claims North of Osiris Target Highly Prospective Hogem Batholith Margin

The newly staked claims extend Osiris northward along the southwestern margin of the Hogem Batholith, described in the release as one of the largest and most prospective intrusive complexes in central British Columbia. The batholith is a composite, multiphase, calc-alkalic to alkalic intrusive complex of Late Triassic to Middle Jurassic age. The central portion of the expanded claim area has previously hosted significant historical programs — including airborne magnetics, IP and ZTEM geophysics, and soil and till geochemistry carried out largely by Serengeti Resources from 2005 to 2011 — which identified potential copper porphyry targets. Limited drilling has been conducted in the area.

Camp Target Drilling Reveals Alkalic Copper-Gold System Similarities

Red Canyon recently completed eight diamond drill holes totalling 2,079 metres at the Camp target within the Osiris Project. Based on this initial drilling, the company interprets the Camp target to host an alkalic copper-gold mineral system with geological similarities to the Mount Polley and Mount Milligan mines in British Columbia. The company's release notes that cross-arc structures in the area are interpreted as important structural pathways for the localisation of porphyry deposits. The Qualified Person has noted that these comparisons do not imply that future exploration will necessarily result in the discovery of similar economic mineral deposits.

Auger Drilling and Multi-Target Fieldwork Planned Across Expanded Osiris Area

Red Canyon has outlined an active 2026 field program across the expanded Osiris claim area. A first-pass truck-mounted auger drilling program of up to 40 holes is planned to commence in mid-August, designed to collect basal till samples and bedrock cuttings to provide more definitive geochemical data at priority targets. Several high-priority targets, including Nautilus and EV, have been upgraded, and initial diamond drilling at these targets is planned for September 2026. The Inzana project area is located approximately 60 km northwest of Fort St. James and 35 km west-southwest of the Mount Milligan mine, benefiting from access via primary and secondary forestry roads.