Silver Pony Resources Corp. (CSE: PONY, FSE: BJ4, OTC: CCCFD) released an exploration update on August 5, 2026, confirming its maiden diamond drill program at the Silver Pony Project in southeastern British Columbia has exceeded 1,000 metres across three completed holes, with a fourth hole underway. The program is targeting high-grade silver mineralisation along the Badshot trend using a carbonate replacement deposit (CRD) model. All three completed holes intersected geological indicators consistent with that model, and first core shipments have been submitted to Actlabs for assay. Investors are likely watching for formal laboratory results, which the company states are expected over coming months.

Key Points

  • Silver Pony Resources Corp. (CSE: PONY)
  • Maiden diamond drill program has surpassed 1,013 m across three completed holes at the Silver Pony Project, with a fourth hole commenced
  • Historic surface samples at targets include a chip sample of 3,549 g/t Ag at Black Warrior and a grab sample of 12,147 g/t Ag and 10.7% Cu at Old Gold (historic, selective; not verified by Qualified Person)
  • Initial assay results from Actlabs are expected over coming months; pXRF readings are preliminary and for geological guidance only

Three Holes Completed Along the Badshot Trend as Drilling Passes 1,000 Metres

Diamond drilling commenced July 3rd, 2026, following a property-wide mapping and prospecting program that began in early June. Hole SP26-001 reached 298.4 m at the Black Warrior target, establishing the stratigraphic architecture of the trend. SP26-002, the first drill test of the Badshot Formation contact on the property, was completed at 352.77 m. SP26-003, targeting the Old Gold area for the first time, reached 361.7 m, with core logging complete and sampling underway. Together the three holes total approximately 1,013 m, and a fourth hole has commenced.

CRD Mineralisation Indicators Identified Across All Three Drill Holes

Each completed hole intersected geological features consistent with a carbonate replacement deposit system, including dolomitization of marble units, manganese enrichment on key stratigraphic contacts, and dissolution-related porosity. These indicators were identified through field observation and portable X-ray fluorescence analysis of drill core. The company notes that pXRF results are preliminary and are used for geological guidance only, and are not a substitute for formal laboratory assay results. Qualified Person Jeremy Hanson, P.Geo., has reviewed and approved the scientific and technical disclosure underpinning the release.

Historic High-Grade Surface Samples Frame the Black Warrior and Old Gold Targets

The drill targets are supported by historic high-grade surface results, including a chip sample of 3,549 g/t Ag at the Black Warrior target (B.C. Assessment Report 22917) and a grab sample returning 12,147 g/t Ag and 10.7% Cu at the Old Gold target (B.C. Assessment Report 30719). The company cautions these are historic, selective samples that have not been verified by the Qualified Person and are not necessarily indicative of mineralisation across the broader project. The Silver Pony Project comprises 37 contiguous mineral tenures totalling 37,022.88 hectares in the Slocan and Revelstoke Mining Districts.