Sirios Resources Inc. (TSXV: SOI | OTCQB: SIREF) has released assay results from the first five drill holes of its 2026 Phase 1 drilling programme at the Cheechoo gold project in Eeyou Istchee Baie-James, Québec. Headline results include 2.40 g/t gold over 48.5 metres and 1.49 g/t gold over 37.6 metres, with intersections confirmed both inside and outside the conceptual pit used in the 2025 resource estimate. The company states these preliminary results support the thesis that Cheechoo's resource could grow more significantly than the 2025 estimate indicates, making the update to that estimate a key milestone for investors to monitor.
Key Points
- Sirios Resources Inc. (TSXV: SOI | OTCQB: SIREF) is a Québec-based gold exploration company focused on the Cheechoo gold deposit.
- First five drill holes of the 2026 summer programme returned gold intersections inside and outside the 2025 resource pit shell, including a high-grade interval of 77.65 g/t gold over 1.1 metres.
- 33 holes completed totalling 13,555 metres drilled to date; visible gold observed in 8 drill holes; four rigs remain active at the project site.
- Investors should watch for remaining Phase 1 assay results and the subsequent update to the mineral resource estimate, which management indicates will follow Phase 1 completion.
Cheechoo 2026 Drill Results Confirm Mineralisation Beyond Existing Resource Boundaries
Sirios reported assay results from 1,753 metres across five holes — CH26-326, CH26-327, CH26-328, CH26-329, and CH26-300E — in its Phase 1 summer campaign. Hole CH26-326 delivered the strongest interval at 2.40 g/t gold over 48.5 metres outside the conceptual pit, including a high-grade subinterval of 77.65 g/t gold over 1.1 metres. Hole CH26-327 returned 1.16 g/t gold over 32.2 metres and 2.28 g/t gold over 10.3 metres, both within the resource pit shell. The company notes that true widths are not yet known at this stage of the programme.
Visible Gold in Eight Holes Signals Broad Mineralisation Across Cheechoo
Visible gold was observed at multiple points in eight separate drill holes, including CH26-326, with seven additional holes carrying visible gold still awaiting laboratory assay results. The company used the Photon Assay™ method at MSALABS in Val-d'Or for gold analysis, applying full-sample assaying to intervals containing visible gold. An on-site scanning campaign using Élémission's ECORE LIBS instrument has covered 24,299 metres of core to date, with field analysis continuing through to mid-September. These observations point to widespread gold distribution across the deposit's footprint.
Cheechoo Resource Base and Exploration Upside at a Glance
The Cheechoo project hosts an existing 2025 mineral resource of 35 Mt indicated at 1.12 g/t gold (1,262 koz) and 42.7 Mt inferred at 1.23 g/t gold (1,688 koz), situated approximately 15 kilometres from the Éléonore mine with access to road and hydroelectric infrastructure. An additional conceptual exploration target of 31 to 40 million tonnes grading between 1.27 and 1.45 g/t gold has also been estimated. Results reported represent less than 10% of planned drilling, and management states Phase 1 is expected to conclude in September.


Please wait processing your request...