Southern Silver Exploration Corp. (TSXV: SSV) has reported additional assay results from underground channel sampling at the Puro Corazon Mine on its Cerro Las Minitas property in Mexico, returning multiple intercepts of strongly anomalous polymetallic mineralization. Highlight results include 2.8 metres averaging 665 g/t silver-equivalent (AgEq) and 1.2 metres averaging 2,042 g/t AgEq. The results form part of a broader program integrating underground sampling with recent drilling, as the company advances toward updated resource and economic assessments for the larger Cerro Las Minitas project.

Key Points

  • Southern Silver Exploration Corp. (TSXV: SSV)
  • Underground channel sampling at Puro Corazon Mine returned highlight intercepts including 1.2 metres of 2,042 g/t AgEq and 2.8 metres of 665 g/t AgEq
  • A total of 230 channels comprising 1,380 individual samples were collected from sub-levels 5 to 14; Phase I definition drilling commenced June 2026 with six holes totalling 2,194 metres completed
  • Investors may be watching for pending drill assays and a planned Mineral Resource Estimate update followed by a Preliminary Economic Assessment update

Puro Corazon Channel Sampling Results and Mineralisation Style

The channel sampling program targeted areas of skarn alteration and mineralisation adjacent to the Central Intrusion and in zones located outboard of the main contact, covering sub-levels 5 to 14 of the Puro Corazon Mine. Southern Silver notes that many samples were collected adjacent to wider mined-out stopes now inaccessible to sampling, meaning current results may not fully reflect the thickness or grades of historically mined material. Additional highlight intercepts include 2.3 metres averaging 554 g/t AgEq and 4.0 metres averaging 367 g/t AgEq, demonstrating broad polymetallic mineralisation including silver, lead, zinc, and copper.

Sampling Methodology and Quality Controls at Cerro Las Minitas

Southern Silver collected 230 channel samples comprising 1,380 individual samples, with intervals ranging from 0.15 metres to 2.0 metres. Channels were spaced every 3.0 metres and oriented perpendicular to the trend of the mineralised zone. Geological criteria guided sample length selection to ensure mineralised skarn was sampled separately from footwall and hangingwall horizons. Analysis was conducted by ALS Laboratories in North Vancouver. Robert Macdonald, MSc., P.Geo., served as the Qualified Person under National Instrument 43-101 and supervised data collection and approved the technical disclosure.

Phase I Drilling and Advancement of the Cerro Las Minitas Project

With final assay results now received, Southern Silver is incorporating the Puro Corazon underground sampling and drilling data into the broader Cerro Las Minitas project, which the company states is expected to significantly enhance project economics and mine planning. The Phase I definition drill program of up to 14,000 metres commenced in June 2026, with six core holes totalling 2,194 metres completed and assays pending. The company intends to subsequently update the Mineral Resource Estimate and then the Preliminary Economic Assessment in accordance with National Instrument 43-101 requirements.