Standard Uranium Ltd. (TSXV: STND) has released geochemical assay results from its winter 2026 drill program at the Rocas Uranium Project in Saskatchewan, marking the first drilling ever completed on the property. The program confirmed weakly anomalous uranium in two of four drill holes and anomalous rare earth element concentrations in three of four holes, with TREO results reaching up to 0.990 wt.% in pegmatitic rocks. The results support the project's prospectivity for basement-hosted uranium mineralisation, a finding investors in junior uranium explorers may be watching closely given ongoing demand for uranium supply.
Key Points
- Standard Uranium Ltd. (TSXV: STND | OTCQB: STTDF | FSE: 9SU0)
- Inaugural drill program at Rocas completed 962 metres across four reconnaissance holes, confirming uranium and rare earth element enrichment
- Highest TREO result reached 0.990 wt.% in drill hole ROC-26-001; uranium partial digestion peaked at 36.0 ppm in ROC-26-003
- Investors may be watching the planned phase two drill program and expanded geophysical coverage at Rocas
Rocas Inaugural Drill Program Validates Basement-Hosted Uranium System
The winter 2026 program tested four target areas — Upper Prawn Lake, Frog Lake, Southside, and Crab Lake — across 962 metres of diamond core drilling. The release states that key geological characteristics of a uranium-bearing mineralised system were intersected across the project, including graphitic structural systems and hydrothermal alteration within altered paragneiss and garnetiferous orthogneiss units. Secondary hematite, clay replacement, chlorite, and carbonate alteration styles were identified, which the company describes as indicative of a hydrothermal uranium-fertile system open along strike and at depth.
Rare Earth Element Results Add a Secondary Discovery Layer at Rocas
Three of the four drill holes returned anomalous rare earth element concentrations, with the highest calculated Total Rare Earth Element Oxides plus Yttrium (TREO) result of 0.990 wt.% recorded over 0.5 metres in ROC-26-001 at the Upper Prawn Lake target. Additional elevated TREO intersections of 0.559 wt.% and 0.409 wt.% were returned from the Southside and Frog Lake targets respectively. The company notes that REE enrichment was identified in pegmatitic rocks and within mafic dykes intruding pelitic gneiss, adding a secondary exploration focus to the project alongside uranium.
Collective Metals Option Agreement Funded the Winter Program
The Rocas Project is currently under a three-year earn-in option agreement with Collective Metals Inc. (CSE: COMT), which funded the winter 2026 drill program. Standard Uranium operated the program. The release also notes the project is located 75 kilometres southwest of the Key Lake Mine and Mill facilities along Highway 914, placing it within a structurally significant corridor south of and along strike from the Key Lake Operation. The company considers the project prospective for shallow, high-grade basement-hosted uranium mineralisation in an area with minimal glacial till cover.
Phase Two Exploration Planning Under Way at Rocas
Following integration of drilling and geophysical datasets, Standard Uranium states that additional surface exploration and a second-phase drill program is being planned to follow up along strike of mineralised holes and test priority regional targets across more than 5 kilometres of untested conductor strike-length. The company also intends to expand geophysical coverage to refine targets. The immediate share price impact was not clear from available public information. The scientific and technical content in the release was reviewed and approved by Sean Hillacre, P.Geo., a qualified person as defined under NI 43-101.



Please wait processing your request...