Waraba Gold Limited (CSE: WBGD) has released historical exploration results from its Sirasso gold project in northern Côte d'Ivoire, outlining an 11.5 km gold-anomalous corridor identified by previous operators between 2012 and 2019. The company also corrected prior disclosures on permit sizes for both Sirasso and Tengrela, and provided an update on its ongoing Tengrela auger program. Investors are watching progress on the Sirasso permit application, which has not yet been granted, and on financing for the company's planned 2026–2027 exploration program.
Key Points
- Waraba Gold Limited (CSE: WBGD | FSE: ZE00 | OTC Pink: WARAF) is a Canadian junior gold explorer active in Côte d'Ivoire
- Historical work by previous operators outlined an 11.5 km gold-anomalous corridor at Sirasso, including a 7.7 km Ouolobo segment; Waraba has not yet conducted its own sampling or drilling there
- Sirasso permit application PR 0999 covers approximately 337.69 km² and has not been granted; Tengrela permit PR 0998 covers approximately 395 km² and expires September 16, 2029
- Investors may be watching for the grant of the Sirasso permit and confirmation of financing for the planned exploration program
Sirasso Historical Drilling Outlines 11.5 km Gold Corridor at Ouolobo Target
Work completed by New Mining CI and Randgold Resources between 2012 and 2019 included 141 air core holes for 5,936 m, 16 RC holes for 800 m, five trenches for 330 m and 325 pits within the current application area. Selected results include 15.0 m at 0.76 g/t Au from 27.0 m in air core hole OUOAC016, 3.0 m at 3.21 g/t Au from 45.0 m in OUOAC072, and 13.0 m at 0.72 g/t Au in trench OUOTR001. The company cautions that these are historical results that have not been verified to current standards and should not be relied upon as an indication of mineralization on the property.
Sirasso Permit Application Status and Earn-In Structure
The Sirasso property is an exploration permit application, PR 0999, covering approximately 337.69 km² in the Poro Region. The amended application was declared admissible by the Mining Administration according to a legal opinion dated August 10, 2026, but the permit has not been granted and no work can be carried out until it is. Waraba holds an option to earn up to an 80% interest in SOMACO Global Resources SARL, which holds the application, by paying US$2 million for an initial 20% stake and funding at least US$5 million of exploration in tranches. The US$2 million initial payment has not yet been made.
Tengrela Auger Program Returns Mixed Results Across Three Prospects
As at October 3, 2026, Waraba had completed 844 auger holes for 9,609 m across the Fetiko, Meiko and Iribasso prospects at its Tengrela gold project. Fetiko returned the previously reported 1.9 km auger gold anomaly. Meiko results were described as only weakly anomalous, while Iribasso returned a maximum of 37 ppb Au, which the company does not consider sufficient to warrant follow-up at this time. The Tengrela permit covers approximately 395 km², correcting a previously disclosed figure of approximately 399 km².
Planned 2026–2027 Program Subject to Financing and Permit Grant
Waraba's planned exploration program includes approximately 6,830 m of RC and diamond drilling at the Podio and Tiogo targets, expected to begin in December 2026, approximately 14,700 line-km of UAV magnetic surveying, RC drilling at Fetiko, and drilling at Sirasso in 2027 subject to the permit being granted. A two-phase Sirasso program, estimated at a combined US$2,774,000, is also outlined. The company notes the full program is subject to financing, permitting, contractor availability, and results, and replaces previously announced programs.