Highlights

  • Recent drilling extends the multi-lens system at Zone 126 over more than one kilometre in strike.
  • Zone 126 remains open at depth, with multiple lenses providing growth potential.
  • Drilling strategy and logistics enhancements aim to accelerate delivery of results to market.

Benz Mining Corp. (TSXV:BZ) reported on October 13, 2025, a significant high-grade drill result from the Zone 126 prospect at its Glenburgh Gold Project in Western Australia. The company intersected 79 metres averaging 4.4 grams per tonne (g/t) gold from 534 metres, marking the thickest high-grade intercept recorded at the project to date. This latest intercept lies roughly 70 metres down dip from the nearest prior drill results, underlining the continuity of mineralization at depth.

The Zone 126 area has evolved into a multi-lens gold system extending over one kilometre in strike, with all discovered lenses remaining open at depth. Recent drilling also confirmed additional high-grade results, including 44 metres at 4.6 g/t gold from 475 metres and 20 metres at 2.6 g/t gold from 507 metres. The intercepts support the broader structural model, which guides the company’s systematic approach to identifying thickened high-grade zones within the Glenburgh corridor.

Benz follows a structured drilling program to delineate, expand, and convert high-grade zones into resource ounces cost-effectively. Initial drilling focuses on defining lateral and near-surface lens limits using reverse circulation (RC) methods. Extensional drilling then tests depth potential, followed by infill and resource definition drilling. Benz has emphasized the use of RC drilling wherever possible, coupled with downhole televiewer scans, to optimize both structural understanding and resource definition at relatively low discovery costs.

To accelerate assay turnaround and delivery of results, Benz has introduced dedicated logistics for transporting samples to Perth laboratories and has shifted two of its four drill rigs to double-shift operations, effectively increasing the operational drilling capacity to six rigs. Outside Zone 126, two rigs are also targeting bulk-tonnage potential at the Apollo Icon trend, with a fourth rig expected to scout additional targets along the 18-kilometre Glenburgh corridor.

The Glenburgh Gold Project continues to demonstrate significant growth potential, with multiple lenses at Zone 126 and additional targets along the corridor remaining open at depth. The recent high-grade intercepts, combined with ongoing drilling and logistical enhancements, support Benz Mining’s efforts to expand the resource base and advance project development efficiently.