Highlights  

  • DPM Metals reports a major high-grade discovery at the Chelopech Mine’s Wedge Zone Deep target. 
  • New drill intercepts include 68.3 metres at 7.42 g/t AuEq and 40 metres at 12.40 g/t AuEq. 
  • The discovery sits 300 metres below existing reserves, opening a new area for expansion. 
  • Mineralization remains open in multiple directions, indicating further potential. 
  • DPM plans USD 2M to USD 3M in additional drilling through early 2026. 

DPM Metals Inc. (TSX:DPM) has announced a significant new high-grade mineralized zone at the Wedge Zone Deep target within the Chelopech mine concession in Bulgaria. The newly drilled intercepts lie roughly 300 metres beneath current Mineral Reserves and underground infrastructure, revealing meaningful depth potential in an area historically considered a low exploration priority. 

Key intercepts include 68.3 metres at 7.42 g/t AuEq in hole EX_WZD_210_01, with a 28-metre section grading 13.41 g/t AuEq. Additional strong results were returned from EX_WZD_210_01A and EX_WZD_165_01, highlighting continuity and grade consistency. The mineralization occurs as massive sulphides transitioning into hydrothermal breccia and sulphide stockworks, hosted within diorite and phreato-magmatic breccias adjacent to the Petrovden Fault.

Geological Context and Expansion Potential

The WZD target lies on the northern flank of the Chelopech concession, below -100 m elevation, within a broad corridor controlled by both northwest-southeast and east-west structures. Early drilling has outlined high-sulphidation mineralization across approximately 110 metres of strike, and the zone remains open laterally, down dip, and up dip. 

This discovery emerged from deeper scout drilling designed to test underexplored blocks of the concession. The size and grade of the mineralized intervals indicate a new opportunity to expand the Chelopech resource base. With only 3,120 metres drilled so far and sparse historical drilling in the region, the company believes that the WZD target may unlock meaningful long-term value and support its goal of extending Chelopech’s mine life beyond 10 years.

Next Steps: Drilling and Infrastructure Planning

Recognizing the significance of these results, DPM will allocate USD 2M–USD 3M toward an additional 10,000 metres of infill and delineation drilling, scheduled for completion by the end of Q1 2026. This next phase aims to refine the geometry and continuity of the zone for future resource classification. 

The company is also evaluating underground infrastructure options to enhance drilling access and support ongoing exploration. All sample preparation and assay analysis follow rigorous QAQC protocols overseen by independent qualified personnel, ensuring accuracy and confidence in the reported results. 

Conclusion 

The discovery of a new high-grade zone at the Wedge Zone Deep target marks a pivotal advancement for DPM Metals and its flagship Chelopech Mine. With extensive mineralization remaining open and substantial drilling planned, the company is positioned to unlock additional underground potential that could extend mine life and strengthen its long-term development strategy. The results reinforce the exploration upside of Chelopech and support DPM’s objective of building a sustainable mid-tier precious metals platform. 

DPM Metals’ shares closed at CAD 34.31 on November 19, marking a 0.85% increase from the prior session. 

Also read - Ivanhoe Mines (TSX:IVN) Advances Growth Strategy with Official Launch of Platreef Mine