Image source: Shutterstock
Highlights
- Miroir target drill hole returned 2.77 g/t Au over 11.1 m, including 4.36 g/t over 6.5 m
- Valentre zone intersected 3.96 g/t Au over 9.3 m at 335 m depth
- 2025 program targets 18,000 m of drilling across underexplored areas at Duparquet
First Mining Gold Corp. has released initial assay results from its 2025 drilling campaign at the Duparquet Gold Project in Quebec, Canada. The program, initiated in March with a second rig added in April, aims to complete 18,000 meters of drilling to evaluate expansion potential at the Miroir and Valentre zones.
At the Miroir target, results from drill hole DUP25-052 revealed 2.77 grams per tonne (g/t) of gold (Au) over 11.1 meters, including a higher-grade section of 4.36 g/t Au over 6.5 meters. Similarly, drill hole DUP25-054 intersected 1.41 g/t Au over 11.9 meters, including 2.52 g/t Au over 5.25 meters. These results were returned from shallow depths, suggesting the possibility of expanding near-surface resources.
Further drilling tested a secondary target in the Valentre zone, situated 225 meters south of Miroir. Drill hole DUP25-054 intersected mineralization at 335 meters depth, returning 3.96 g/t Au over 9.3 meters, including 5.71 g/t Au over 5.8 meters. This intercept highlights the potential for depth extensions and continuity of gold mineralization along a key geological plunge.
The current campaign focuses on expanding the known footprint of gold mineralization within underexplored areas and validating extensions at depth. According to the company, results from both zones support further evaluation of resource growth across the project.






Please wait processing your request...