Image source: Shutterstock

Highlights

  • Pulsar Helium signs term sheet for US$4 million Project Finance Facility.
  • Facility to fund operational activities at the Topaz helium project.
  • Second tranche of brokered private placement closed, raising US$427,498.

Pulsar Helium Inc. (TSXV:PLSR), a prominent helium project development company, has announced that University Bancorp, Inc. has signed a term sheet to extend a US$4 million Project Finance Facility to Pulsar’s wholly owned subsidiary, Keewaydin Resources, Inc. ("Keewaydin"). This line of credit will be secured by a pledge of all shares of Keewaydin and a first lien on its assets. The loan facility, which will mature on March 31, 2026, will bear an interest rate of 12% per annum on any amount drawn, with a 2% utilization fee on the balance. The funds will be utilized for operational activities on Pulsar's Topaz helium project, with draws expected as needed in the near term.

The facility is subject to the execution of definitive documentation and regulatory approvals, including approval from the TSX Venture Exchange if required. Pulsar has also indicated that positive drilling results at Topaz and upcoming flow testing of the Jetstream #1 and #2 wells are encouraging. The contractors are confirmed to mobilize and begin flow testing around March 29, 2025, with each well expected to be flowed for two weeks. Uncontaminated gas samples from the wells will be analyzed in a laboratory to further assess the helium potential of the project.

Additionally, Pulsar closed the second and final tranche of its brokered private placement on March 21, 2025, raising US$427,498 by issuing 1,124,994 common shares at US$0.38 per share. Combined with the first tranche, the Company raised a total of US$2,427,498 through the issuance of 6,388,154 new shares. In connection with the final tranche, Pulsar paid a cash fee of US$25,650 to University Bank, its Co-Placing Agent. The shares issued are subject to a four-month hold period.