Highlights
- Drillhole S-051 extends copper-gold footprint down-dip and along strike from previous hole
- Multiple zones report chalcopyrite mineralization, including intervals up to 2% at depth
- Current campaign targets 4,000m of drilling across Star Main, Star North, and Star East
Star Copper Corp. (CSE: STCU | OTC: STCUF | FWB: SOP) is a mineral exploration and development company focused on advancing copper projects in mining-friendly jurisdictions. Its flagship Star Project in British Columbia’s Golden Triangle spans 6,829 hectares and hosts multiple copper-gold targets. The company’s strategy includes geological mapping, geophysical surveys, targeted drilling, and baseline environmental studies to support future resource modeling and potential development.
The company has now completed the second drillhole (S-051) in its 2025 campaign, confirming the extension of copper-gold mineralization both down-dip and along strike. The 539-meter hole collared 60 meters west of S-050 and tested the vertical continuity of copper mineralization near surface and at depth. It encountered a supergene cap to 90 meters, highlighted by malachite and azurite coatings and peak chalcopyrite grades of 1.25% between 57–62 meters.
Beneath the oxide zone, two deeper mineralized intervals were identified: 203–213 meters (up to 1.5% chalcopyrite) and 379–400 meters (up to 2% chalcopyrite), with associated potassic alteration intensifying between 410–473 meters. Fault zones at various depths were noted but did not materially offset the mineralized envelope.
S-051 is among the deepest holes drilled on the property and confirms both near-surface and deeper vein-hosted and disseminated copper mineralization, further supporting the presence of a porphyry copper system at Star Main.
The next drillhole, S-052, steps out 50 meters north to evaluate the extent of the supergene enrichment zone and follow up on historical intercepts from hole S-0371, which reported 142 meters grading 0.43% Cu and a deeper zone of 12 meters at 2.33 g/t Au.
Up to 4,000 meters of drilling are planned in this campaign, targeting near-surface oxide zones, deeper porphyry-style mineralization, and key structures such as the Star and Dick Creek faults. All technical content has been reviewed by a Qualified Person under NI 43-101.






Please wait processing your request...