Participants

Andrew Plenge; Investor Relations; Exelon Corporation

Calvin Butler; President and Chief Executive Officer; Elexon Corporation

Nicholas Campanella; Analyst; Barclays

James Kennedy; Analyst; Guggenheim Partners

Julien Dumoulin-Smith; Analyst; Jefferies

David Keller; Analyst; Morgan Stanley

Bill Appicelli; Analyst; UBS

Presentation

In.
 Okay.
 So yes, yes, hello, and welcome to Exelon.
 So the first quarter earnings call, my name is Latif, and I will be your event specialist today.
 All lines have been placed on mute to prevent any background noise.
 Please note that today's webcast is being recorded.
 During the presentation, we'll have a question and answer session.
 You can ask questions by pressing star one one on your telephone keypad.
 If you would like to view the presentation and a full screen view, click the full screen button by hovering your computer mouse cursor over the PowerPoint screen, press the Escape key on your keyboard to return to your original view.
 And finally, should you need technical assistance as the best practice we suggest you first for us refresh your browser that does not resolve the issue, just click on the health option in the upper right corner of your screen for online troubleshooting.
 It is now my pleasure to turn today's program over to Andrew plans, Vice President of Investor Relations.
 The floor is yours.

Andrew Plenge

Thank you, Latif, and good morning, everyone.
 Thank you for joining us for our 2025 the first quarter earnings call.
 Leading the call today are Calvin Butler, Elexon's President and Chief Executive Officer; Jeane Jones, Chief Financial Officer; and other members of Exelon's senior management team are also with us today, and it will be available to answer your questions following our prepared remarks.
 Today's presentation, along with our earnings release and other financial information, can be found in the Investor Relations section of Exelon's website.
 We would also like to remind you that today's presentation and the associated earnings release materials contain forward looking statements, which are subject to risks and uncertainties.
 You can find the cautionary statements on these risks on Slide 2 of today's presentation are in our SEC filings.
 In addition, today's presentation includes references to adjusted operating earnings and other non-GAAP measures.
 Reconciliations between these measures in the nearest equivalent GAAP measures can be found in the appendix of our presentation and in our earnings release.
 It is now my pleasure to turn the call over to Calvin Aixtron's, President and CTO.

Story Continues

Calvin Butler

Thank you, Andrew, and good morning, everyone.
 We appreciate you joining us for our for first quarter earnings call.
 2025 is off to a good start.
 We are reporting operating earnings of $0.92 per share, representing strong growth over the first quarter of 2024 and ahead of expectations, which keeps us on track to deliver on our 2025 operating earnings guidance range.
 Reliability and safety performance continues to be very strong as well.
 Despite a number of high wind events throughout the winter months that challenged our operators who remain the best in the business commented, Pepco Holdings are projecting top decile auto frequency and duration performance.
 While VGE. and PCOR. and top quartile, we have a relatively lower level of base rate case activity this year and our to open rate cases remain on track at Atlantic City Electric and Delmarva Power, which Jim will cover in her remarks.
 We have also been actively engaging in a variety of legislative and regulatory reforms to ensure energy policy and keeps pace with the industry and broader economic towards ensuring reliable and affordable energy for all customers is critical to our jurisdictions and the nation as a whole as they work to realize there.
 Economic and energy policy ambitions for the first quarter of 2020 provide has already seen great progress on that front.
 In mirror, the legislature passed several energy bills that take important steps around energy security, including prescribing a competitive process, so procure new dispatchable resources and capacity while providing a path for alternative approaches should they be ambitious around developing battery storage at both distribution and transmission, low offering us and developers further opportunity to shore up the stage energy supply and the state also outline for the first time in while the recognition of multiyear plan to construct prompting a robust discussion that highlighted its merits of increased transparency, planning and alignment while giving stake was a greater stake and how much and where there should be invested.
 Now look to the commission to conclude its multiyear plan.
 Lessons learned from process so we can move the state for with confidence in meeting its energy and economic goals.
 Other states are also considering legislation to address elements of energy policy, including a focus on the energy security and cost.
 Alex patient implications of large loan growth.
 We expect to have more to share on those sessions as the year advances.
 There's been significant activity at the regional and federal level as well.
 First, PJM has made considerable progress to address the optimal outcomes in its capacity market cap structure.
 We have been pleased to see that product approved for approved a number of solutions put forward IPJMP. it to oh five filings, including its temporary price collar and refinements to it's the activation process.
 We are also encouraged to see the response to its reliability Response Initiative, which has generated applications were up almost 27 gigawatts worth of nameplate capacity since February first initiated a tool six proceeding requesting that PJM and its transmission owners investigate whether the tariff remains just and reasonable in rates, terms and conditions of service that apply to co-located arrangements.
 We are pleased with the leadership shown by four and working to resolve off this issue in a timely manner, along with PJM's efforts to meet the aggressive time line to address a very complicated topic.
 We're also encouraged by the consensus that PJM transmission owners were able to reach on a complex top in such a short period.
 And we look forward to assisting the industry aligning on a policy that absolutely supports the national crisis, critical issues of energy, security and economic development.
 More details on the progress we're making across these forms can be found in our appendix.
 Maintaining momentum across these policy arena is key to me the task ahead of us, and we see no abatement and our opportunity for new large loads in our territories.
 The 17 gigawatt pipeline of opportunity that we communicated at our Q4 earnings call remains fully intact.
 We are also conducting advanced studies on an additional 16 gigawatts of high density low, which we anticipate will result in significant incremental commitments from customers upon aligning our investment needs and timing.
 We continue to focus on ways to enhance our process to ensure we are offering unparalleled service to our two new customers in our territories.
 Continuing to ensure existing customers are protected and benefit from the new low and the pace of new business seeking to connect to the grid makes it even more critical for us, stakeholders to collaborate actively and with urgency on policy that balances the common goals of reliability, affordability and progress towards a cleaner energy future.
 We look forward to providing further updates on our new business prospects in future quarters.
 As a reminder, this is just one of the elements that contributes to our visibility into 10 to $15 billion of transmission opportunity beyond our plan.
 As we laid out in our fourth quarter call, the need for investment in our high voltage network is real and growing.
 We are proud to have a wrinkle zombie now leading those efforts with his extensive background in commercial, regulatory and operational roles, ideally suited to industry tailwinds and our unique transmission assets and capabilities.
 I also want to congratulate can let Olivier for her promotion to BGE. PRESIDENT AND CEO for effective.
 This leading increasingly large organizations doing or 15-year career here will continue to ensure VGE. 2 million electric and gas customers receive high value service.
 Congratulations to you both.
 Lastly, I'll remind you of our expectations for our for your outlook.
 We reaffirm our plan to invest $38 billion over the next four years for the benefit of our customers that will drive 7.4% rate base growth be financed with a balanced mix of debt and equity.
 In fact, we have been able to derisk a large portion of our financing needs for the year with all of our planned corporate debt issuances completed and 60% of our $700 million annualized equity need price by earning a fair return on that investment plan, we expect to deliver analyzed and the last earnings growth of 5% to 7% through 2028, generating consistent growth and long-term value.
 I'll now turn to Jane to discuss our financial performance and provide further details on our rate case activity.
 Thank you, Alan, and good morning, everyone.
 Today, I will cover our first quarter and five and so updates and progress on our 2025 regulatory activity.
 Starting on Slide 5, we present our quarter over quarter adjusted operating earnings stock.
 Exxon earned $0.92 per share in the first quarter of 2025 compared to $0.58 per share in the same period in 2020 are reflecting higher results at $0.24 per share over the same period.
 Earnings are higher in the first quarter relative to the same period last year, primarily driven by $0.14 of new distribution and transmission rates, and in fact, across our jurisdictions, $0.03 of favorable weather at Kimco and $0.02 of tax repairs timing, partially offset by $0.03 of higher interest expense due to higher levels of debt at an interest rate.
 As anticipated.
 Results are also impacted by timing outcome at which totaled nine times for the for the quarter and includes $0.02 due to the lower revenue ramping mission in 2024 million weighted updated rate from the rehearing order and eventual approval of our redevelopment plan, the remaining seven than a year over year revenue shaping and on obtaining, including higher storm and 90 project related spend in the first quarter of 24, we expect that revenue shaping and O&M timing turbines and the balance of the year.
 These results are slightly ahead of our indications on the Q4 call, primarily due to the timing of our front end as our timing impacts repairs.
 As we look ahead, our second quarter earnings are expected to be approximately 14% at the midpoint of our projected full-year earnings guidance range contemplates partial reversal of the comment timing, along with normal weather and storm activity in combination with Q1 results.
 This would result in recognizing 48% of projected full-year earnings in the first half of the year.
 System and seasonal shaping in prior years, allowing us to remain on track for full year operating earnings of two 64 to 74 per share, but the goal to be at the midpoint or better.
 Finally, we are reaffirming our annual earnings growth rate of 5% to 7% or 2020, but the expectation to be at the midpoint or better at that range.
 Turning to Slide 6.
 We currently have to base rate case of keep it open at Pepco Holdings.
 The Delmarva Power gas distribution rate case filed last September remains on track with interim rates, which went into effect on April 20th, subject to refund the rate case six to recover continued reliability investments such as aging, keeping up with customers and supply price volatility during peak periods.
 It will be open for intervener testimony in July and September of oh four.
 Evidentiary hearings are convened in November and orders expected in the first quarter of 2020.
 Set our second open base rate cases that Atlantic City Electric, where we are seeking recovery of great improvement and modernization efforts in line with New Jersey's Energy Master Plan and Clean Energy Act that per bed per stage of that was approved by the judge in March with settlement, especially that late April, early May.
 Evidentiary hearings are scheduled to begin in late July and continue into early August with an order expected by the end of the year.
 It is also anticipated to implement interim rates on August 21st, subject to refund in May, and we continue to work conclude that our final reconciliation from the first PGE. and Pepco Maryland multiyear plans and remain engaged in lessens our process as they approach our next rate case filing.
 We are encouraged that the legislature recognize the multi-year contract and the recently passed next-generation Act.
 That conversation from Thanks greater direction and alignment between all stakeholders on the future investments needed to support our customers.
 Now that we are in a second MIPFBGE. and our fourth one in Maryland.
 We feel better prepared to support a multiyear investment plan without a reconciliation, and we look forward to working with the commission and our stakeholders to continue to demonstrate customer benefits and feature multiyear plan filing.
 We said that we believe that forward-looking plans Adamas play simple and cost-effective way to ensure the reliability and resiliency of the system while meeting the faith, energy and economic goals.
 We laid the commission's comments on the lessons learned to fully into our next phone lines at the PSCs recommendations that accommodate the new legislation and the lessons learned proceeding.
 Finally, in Illinois, comments out its annual performance evaluation and request for annual adjustment under 2020.
 Our base distribution rates on April 29th therapists and adjustment of 258 million is primarily driven by operating operating under a lower revenue requirements throughout 2024, relevant to the final approved order, and it includes the revenue impact of achieving a performance metric at or above five basis points from is actual revenue amount in 2024 closely aligns with the final revenue requirement approved in December 2020.
 Our direct and rebuttal testimony is expected to occur throughout the summer at a hearing and an ALJ competitor in the US.
 While a final order on comments reconciliation is effected in December.
 Turning to slide 7, I will conclude with a review of our balance sheet activity.
 From a financing perspective, we took advantage of the favorable market conditions in the first quarter and made substantial progress on our 2025 capital needs.
 First, we have completed nearly 50% of our planned long term debt financing transaction, having successfully raised 650 million for the Pepco Holdings utilities and all of our 2 billion of debt financing needs at corporate, including EUR1 billion of hybrid debt.
 This John invested in and an attractive pricing for our debt securities continue to be a test.
 I meant to the strength of our balance sheet and to our value proposition positioning as well as we seek to finance the energy transformation and the most cost-effective way for our customers and our investors.
 We also continue to execute on our patients hedging strategy implemented in 2022 to further protect us from interest rate volatility as it pertains to equity.
 As a reminder, in our last guidance update, we estimated we would finance 40% of our incremental capital investment with equity, resulting in total equity needs at 2.8 billion over the four-year plan and implying approximately 700 million of equity on an annual basis.
 For 2025, we've successfully de-risks nearly 60% of our annualized needs, BRHPM., issuing approximately 175 million worth of shares and pricing, an additional $250 million under forward agreements for issuance later in the year.
 Sure.
 As you heard in our last earnings call, we project to continue to have 100 to 200 basis points of financial flexibility on average over the plan for our consolidated corporate metrics above the Moody's downgrade threshold of 12% approaching 14% at the end of our guidance period.
 We continue to advocate for language that incorporates repairs for Canada in the corporate alternative minimum tax.
 And we are encouraged by the recent bipartisan legislation introduced in the U.S. House to advocate for this change, which will lower energy costs for our customers.
 However, we were manages.
 Our plan assumes that the final regulations will not allow for a pairs favor really addressing repairs and the minimum tax calculation would result in an increase of approximately 70 basis points to our consolidated metrics on average of the plan.
 Thank you.
 I'll now turn the call back to Kevin for his closing remarks.
 Thank you, Jim and closing on Slide 8.
 I'll reconfirm our focus as we look to add another year of execution to our track record as a premier utility, our talented and dedicated employees will continue to deliver operational excellence, investing $9.1 billion in the system to deliver high reliability service to our customers.
 We are also constantly working to find the right rate-making mechanisms that allow us to fulfill our responsibility and privilege to serve the 10.7 million customers that come on us for their energy needs.
 Those mechanisms need to provide adequate compensation for our investors, while allowing for the critical feedback and collaboration necessary to ensure we are only investing where our jurisdictions want us to invest.
 We recognize some of our customers are broadly struggling with economic uncertainty as well as we all navigate updated care policies.
 So budget reprioritization and increased energy supply cost leverage streams like our first cold winter in years only exasperate those pressures, we do feel that we are relatively well positioned to protect our customers as it pertains to the proposed tariff policy with approximately 90% of our supply source domestically, we have estimated the impact to be around 1.5% of our where your capital and O&M investment plan for any mitigating it offers with the majority of impacting capital.
 The impacts will also be delayed as a result of our inventory levels of long lead time requirements.
 With our size, scale and be concentrated investment plan and the culture of cost discipline, we expect to be able to manage any tariff related impacts highlighting the value of Epsilon's platform.
 And while we are advocating for the continuance of the tax credits under the IRA, while we are not directly exposed to any reductions in those not to any transferability of restrictions, as Gene mentioned, we remain committed that we will be able to improve our position with respect to the corporate alternative minimum tax associated with that law, we will continue to leverage a variety of tools to assist customers, including deferred payment plans as well as suspended disconnections and associated fees.
 And we are advertising budget billing options through our community forums, customer and community engagement.
 In addition, we our policy advocacy has focused on solutions that enable continuum and our states to acquire new power supply as cost-effectively as possible while serving large new logos equitably.
 As I noted earlier, we have made good progress thus far and legislative and regulatory reforms.
 Finally, we also stress the degree to which we tried and maximize the value that we need to invest in the grid to serve our customers.
 We focus on forward looking recovery mechanisms because that allows us to collaborate.
 We determined were better to invest their dollars and do it efficiently.
 In fact, over the last five years, over 98 are you lose all of which are established and review through rigorous regulatory proceedings?
 We have we have been reinvested have been reinvested back into the business for our customers and for every 1 million of capital investment we make at our utilities supports a jobs or $1.6 million in economic output.
 So customer affordability continues to be a big part of our focus this year, which complements our efforts to drive economic development to further benefit our jurisdictions.
 And of course, as always, you can count on our continued discipline in executing our financial plan, earning a consolidated ROE 9% to 10%, maintaining a strong balance sheet and reporting earnings within our guidance range of $2.64 to $2.74 per share.
 We look forward to making 2025 our 25th anniversary of Exelon another year where you can count on us to delay, however, consistent growth and long-term value beauty, we can now open it up for any questions.

Question and Answer Session

Andrew Plenge

If you would like to ask a question, simply press star, one on your telephone keypad.
 Our first question comes from the line of Nick camping, Adler of Barclays.
 Please go ahead.
 Nick.

Nicholas Campanella

Good morning, Mick.
 Taking a pay Good morning, everyone.
 one as well.
 So I guess just you have this new Maryland legislation that's out there.
 It does prohibit reconciliations after Gen one, 25.
 And I'm just wondering if you can make kind of talk about how you think that could impact the outcomes in the BGE. or the Pepco reconciliations and on it in order words, kind of go against you there?
 Or is that the guidance resilient to that and done?
 Maybe you can kind of give some more color on that.
 Yes.

Calvin Butler

Let me let me just say this first.
 Thank you for the question and sort of directly.
 And I think you hit it well is that we do expect the reconciliation that come forward in short order and our plan is solidified and ready to operate as we consider all alternatives.
 There's nothing on here that we believe that will prevent us from meeting our objectives.
 That's what but let me turn it all to make to where we see Marilyn going.
 As you know, better than most that made this year had legislate legislation passed.
 And I think there's it's important to focus on five key areas.
 I'll point out one, the first time in provides language that MYP. can be approved and as you talked about, investment have reconciliations.
 But we've kind of gone through this process a couple of times.
 And I think you said within our fourth one, Merrell.
 And so we know how to build this up and know how to work collaboratively with the state goes to a pure risk been on the right base.
 And I'm very comfortable that we will meet the budget for future red and white piece.
 Second specific language and legislation this year stated on the large low co-location issue, which was very important.
 It has provisions in there that requires that any low that for infrastructure upgrades and other recent cost behind the meter, it's balanced and it does that shift the cost to other customers on the system.
 That's very important that would apply to any loan over 100 megawatts with greater with 80% or greater capacity factor.
 So this is very important and it's important to note that we continue to drive this.
 On affordability front, we've been our jurisdictions and Merrill Lynch has codified at the next piece is that battery storage was a big item.
 And within the Merrell and legislation, it directed that the Public Service Commission established you solicit 150 megawatts of distribution battery storage for each electric utility with a target of 70% owned by the utility and 30% owned by third parties.
 It also requires that the PSC started procurement solicitation of 1.6 gigawatts of transmission battery storage by January 26th.
 Again, all indications that they recognize the issues and they're driving the state of Merrill Lynch board.
 And I just want to also give kudos then just bigger knowledge, the two new commissioners that has been appointed, they are they have a strong track record of regulatory experience, and I think they will continue to be vital voices in Maryland as we move for so long answer.
 But to your direct question, we are not concerned about the reconciliation pull out of the legislation and we feel very confident that we will work with the state to meet the needs going forward.
 Hey, thanks for all that color.
 I appreciate that.
 And then on maybe on the four to oh six, obviously, there's been some are quite settled by the power companies, and that was put forward a week or two ago.
 And I'm just curious what your response to be as T and D do you think or are you open for resolving this co-location issue via settlement perhaps and for does this kind of need to go the full disinfect for any common therapy?
 Hi, thanks.
 Basically make I would say we're always open to discussions and have been from the very beginning and that hasn't changed.
 We continue to move forward as the T and D to meet our customers' expectations.
 We talk about the 17 gigawatts and another 16 that were considered.
 So our processes continue.
 I think the track this mission orders coming together, putting forth that statement, EI., putting a transmission owner unified statement to avert goes a long way.
 So our principles have not changed one bit, Nick, and we are right there and into having discussions with the IPPs were open and we're open to make sure that we get this done quickly and equitably for all of our customers.
 And that has not changed.
 Thank you.
 So welcome.
 Thank you.
 Thank you.

Andrew Plenge

Our next question comes from the line of James Kennedy of Guggenheim Partners.
 Your line is open.
 Janus beleaguered.

James Kennedy

Good morning.
 So one of your peers has been talking recently about the introduction of legislation in Pennsylvania to support potentially regulated generation.
 I guess what's your degree of involvement in that process and any views on revenue generation versus potential long-term PPAs or other mechanisms?

Calvin Butler

I would tell you that anything that is good for our customers to address the issue of resource adequacy and affordability.
 We will support of our peers.
 You can appreciate, James, our teams are actively involved in those discussions at the legislative front and even having the discussions of the regulatory side.
 So so we just needed to be balanced and we needed to ensure that the recovery of us getting into that I will put my CFO, is that we need to have a very straightforward approach and that is recover.
 Recoverability is very clear and outlined and legislation.
 So are we know we're getting into and we're partnering with the state to meet those needs.
 But it's all about the customers in terms of affordability in energy, security and adequacy.
 Okay.
 Perfect.

James Kennedy

And then just on the data center side, thanks for the incremental color and the appendix slides on the phases.
 Is there like a rule of thumb that we should be thinking about for how you convert between the phases that ultimately system to the capital plans?
 Just any kind of timeline considerations?
 Thanks.
 Yes.

Calvin Butler

Hey, Adam.
 Yes, we don't really have a rule of thumb because every project is different and we always start with how do we how do we most cost efficient for all of our customers.
 And so and as you can imagine that the third point that we have in the plan, $5 billion of that is supporting business.
 And whenever factor last four-year plan, that was an increase of 900 million.
 So we can expect to continue to see more incremental capital necessary to accommodate the new load.
 And as we outlined in our Q4 call, that 10 to 15 billion being on the planning period, at least $1 billion is related to the new business.
 So what as we as we know, the investment is needed to be done to date, the plan.
 But as we've often, we don't we don't put anything in medicine.
 And so on the $38.5 billion related to new business, and that's at least $900 million increase from our last four year period.
 I mean, it may take that to continue.
 Thanks, guys.
 Thank you.
 Thank you.

Andrew Plenge

Our next question comes from the line of Julien Dumoulin-Smith of Jefferies.
 Please go ahead.

Julien Dumoulin-Smith

Julie, Sarah, and good morning.
 Again.
 Nicely done, guys.
 Hey, thank you.
 Again, being tighter have mics that absolutely.
 Just following up on some of the last questions, if I can press a little bit further, if you don't mind, I'll first on the data center front.
 I mean, you all are framing.
 These is 80% and 50% of probably they're fairly high number as in isolation.
 How do you think about the timing here and how that impacts or perhaps as juxtaposed against the backdrop of this work ongoing process?
 Again, I think we all take it for granted that maybe one for precludes the other.
 But how do you think about an 80% probability is nontrivial, particularly given the metric that you define them as being of having already achieved?

Calvin Butler

Yes, I would say let's start with saying that none of this, as a reminder, is dependent on that co-located at 32 effects as a millimeter.
 And you know, for T and D a typical sort of customers that we have in our cemetery sales and none of that is dependent on that process.
 And and in fact, we're not seeing any slowdown as we work through that process.
 So we got here we announced the 16 gig than Q4 of 24.
 Those 16 gig, we remain very solid, high probability, and we've been giving more color in terms of phase one, phase two and phase three for those 16 gig.
 What we did a little bit different this time is also give you insight into what's around the corner.
 And we have another 16 gig Sorry to confuse instead of both the same number, but it's another 16 gig.
 12 of that is a cluster study in the second cluster study we're doing and comments service territory and then for that is on just spread across the East Coast utility.
 So continued momentum on the meter, not dependent on this process.
 And as you heard from carbon, we continue to work that processing parallel because we want to meet all and any any and all types of customers.
 And as we think about the buckets, you can see again Phase one, Phase two, Phase three, I would say 70% is probably the one, another 20 Phase 2% and 10% in Phase three.
 We we feel very confident in the other 16 gig.
 And I think in kind of think of them roughly in the Phase one time period tail.
 But we wanted to be clear about how we're thinking about those and the fact that we're moving more because of the demand, we're seeing more of a cluster approach of looking at customers together so that we can get them better insights into training and cost and things like that.
 So continuing to evolve our customer service there.
 But as that customer set, he has completed as we work together, forget you can expect us to kind of move move that 16 gates into the other phases as we continue to update you on a quarterly basis.
 Our excellent, thank you for clarifying that.
 It remains distinct and separate and appreciate that eliminated.
 Just not to nitpick too much on the prepared comments.
 Just curious when you talk about assisting the industry with respect to the backdrop here on leadership at first, how do you think about that time it looks like and what that some of process could be.
 I know that there's several different forums where you could have another PGM stakeholder process.
 There could be more of a perk oriented process here.
 How do you think about potentially finding a joint arrangement or settlement here amongst a litany of different parties pattern in Chile?
 In his comments on our about heavy demand.
 Great.
 Thank you to read into any.
 Okay.
 Let me get to your question one.
 Let's take a look at them basket at South.
 We really see quite a bit of consensus in the docket.
 Housing referenced the filing that yes, which represents a majority of the industry at the generic filing filing from the independent market monitor and then the You name it, transmission owner group really demonstrate the fact that there was a record and a consensus about how to treat this like we have.
 When Kevin said, we appreciated that commissions FX here.
 It is to move quickly so that we can all have the clarity that we need.
 That's where we started in this manner.
 And so we're not to pass it off the how the docket is progressing.
 As Kathleen mentioned, we will be open to having the discussions that any thought.
 But what we really weren't infrastructure to issue a decision quickly so that we can have the clarity so that we can support us large load that Gene described as well as go going back to Kevin's point, ensuring affordability and energy as security for our customers.
 Got it.
 So looking for for us to take action principally before anything else with a firm decision, we think they're a record performed to date.
 So as Kevin mentioned, should that should the Commission determined that settlement discussions are appropriate.
 We will be more than willing to participate in that exercise as we have been very constructive partner in the past.
 If you look back at our record here, even the ones that really started in the forefront of this issue that we've demonstrated that we will be constructive and collaborative partners that we're ready at to continue supporting that phenomenon.
 Excellent.
 Thank you all very much.
 Susan Carey, who face?
 Thank you.

Andrew Plenge

Our next question comes from the line of David Carl, Morgan Stanley.
 Please go ahead.
 David morning, Jamie.

David Keller

Thanks.
 Good morning.
 Morning.
 Maybe a quick follow-up on the data center side of things.
 And could you just give a sense as to the timing of when that load that looks to be ramping up within your forecast period?
 And I guess from your and I'm also thinking in the context of your infrastructure and any limitations there.
 When can you connect in new large loads at this point given it's such a big pipeline?
 Yes.
 So I think about the cadence that we have on this slide, we think about 10% of the loans that will be on May 2028, another, a third of that by 20, their medical records with a 20 vertical and then the remainder beyond that.
 So that kind of give you an insight into the year thinking about coming on.
 And then your second question again, it depends on the customer.
 I mean, I think there's a time where every six months and said, you know, always trying to push to be faster for our customers.
 Other times, it can be a little bit longer.
 But in all of our discussions, the most important thing we hear from our customer assistance, understanding the time line on ending upfront with that and why these studies are so important.
 So I think add Libya have been adding.
 David, also, I think it was last year, we talked about how we've restructured our customer strategy organization.
 And we created a centralized group to talk with the data center developers add really to understand what their needs were seen by strategically working with them ahead of its heavy lead and understanding how much they need to ramp up in a timely fashion and also determine the appropriate sites where they can connect quick or onto the system where the infrastructure was already there for a large part there.
 So required less.
 And that's the partnership give you an example.
 Just about a month ago, we had a yes hosted and we hosted with them a large key account meeting in Chicago.
 We had side bars with all the large data center developers to talk about their needs and where they were going.
 And we looked at all of our six jurisdictions to say this is what you need here, sites that we've identified and that's that partnership.
 So to Jim's point, all very different what is a very collaborative approach in how we're targeting it.
 Okay, excellent.
 Thanks for that.
 And I wanted to touch on affordability.
 We've seen some some states may be lower than others, but dancing with the impact of PJM capacity, pricing increases and increased focus on affordability.
 Wondering how you're kind of a approaching that getting ahead of that and managing affordability challenges and concerns that broadly across your portfolio?
 I know you and you nailed it has become the primary topic of discussion of this past winter.
 As I've talked about in my prepared remarks, this was the first cold winter we've had in several years.
 And as an example, BGE. bills were up approximately 50%, with 80% of that increase due to weather commodities and just some legislative changes that were made our adult diaper PowerLight DPL had no real changes in gas distribution rates, but equally high end increases.
 We continue to see whether volatility and supply costs, which are the primary challenges we are working to address and mitigate for customers.
 And as I've talked about what we're doing proactively, we're helping our customers manage the costs.
 We're talking about energy efficiency.
 We're going out to customers' homes and small business really driving what they can take action on to mitigate some of those were deploying our tools to assist customers.
 We've already suspended disconnections.
 We've done we've delayed or extended payment plans, removed any additional charges.
 And I think the biggest piece for us is that were out in our communities at a robust level, holding community forums and connecting with them and ensuring that the assistance that may be available at the state and local level, we're connecting them with that.
 So that is the key to our we've done absolutely not do.
 We've recognized the hardship that many of our customers are facing.
 Yes, as I always say to my team here at dollar increase for some of our customers is $1.2 much.
 So we're not taking it lightly.
 And so we're having conversations at the state and local level about how to partner.
 And I think a good scenario that you can think about the Maryland legislation that I was talking about earlier.
 They allocated $200 million from a fund that they had established.
 I think the fund was called a Strategic Energy Infrastructure Fund directed at the Company's new had about 300 million a day to 200 million of those dollars to help people with pain.
 There builds now how can we partner with them to let those dollars go further?
 And we're having those discussions.
 So you're right, key issue, the key issue, and we're meeting those challenges.
 Okay, great.
 I appreciate the color.
 Thanks so much.
 Look.
 Thank you, sir.

Andrew Plenge

Next question comes from the line of Bill appetite of UBS.
 Please go ahead.
 Bill, please go wrong.

Bill Appicelli

Hey, good morning.
 I just want to go back to Maryland for a second.
 Maybe I missed the lessons learned docket.
 Can you just remind us on the time line and maybe what's the range of outcomes there are some given the legislative developments.
 Is there any concern rent?

Calvin Butler

No, not continuing the MIP.s beyond the current plan for what sort of securities maybe a range of scenarios that we could.
 We could look to bear.
 I would tell you that the fact that debate issues around dumb in white piece, the state legislature did a wonderful job at understanding the value of FYPs, but we do have the discretion to your point on whether we do.
 We do believe that that multiyear collaborative process, the engagement with stakeholders forward looking is the most productive.
 So I don't see anything to date that would take us away from that.
 And I am pleased that the commission did embark on the lessons learned process.
 So it extended into this year likely delaying the timing.
 But we believe that this legislative session that we just set will spark a ruling very soon.
 As you recall, we went through an extensive process to determine that it was the best option.
 And so I think we will have a I'm looking at Karim example year we will have a decision in the short order.
 We anticipated by the end of the second quarter that we will have a decision on the lessons learned.
 And we continue to involvements trade, everyone that's submitted their comments.
 Every one has engaged in the process from the Office of General Counsel to the large industrials to residential customers.
 So everyone's voices are heard, which is what we wanted and that's what we were driving to.
 Okay, great.
 And then just going back a little bit to the resource adequacy debate, you're indicating an ever-increasing amount of labor that's interested in coming on.
 Yes.
 The Q, I think for new capacity additions remains pretty small, frankly, because only about six gigawatts of gas in the queue for PJM.
 I guess there's very good having this technical conference here in June.
 But I guess where do you got to stand in terms of addressing the resource adequacy concerns as you look out to the that the amount of load that once they come on over the next call it five to seven years?
 We do believe it's a portfolio approach, meaning that there's an approach that PJM and all of our states can take that.
 We kept limit how we get the generation resources to the tape.
 We should be looking at everything that's a delay of closings of certain plants is it's allowing guests to come in and build.
 And we talked about this utilities owning generation.
 All of that needs to be on the table because we've, as you've just said, we see we had a critical time in this industry where we have to meet the need.
 Having said that, it has to be a very balanced approach and you have to balance it with the affordability issue.
 And I think that's why it's all coming to the table right now.
 So our discussions is portfolio approach.
 Let's be open to it and get it done sooner rather than later and also put the right policies around it where you don't ship the cost from one customer group to another because we're running too fast.
 And I think that that portfolio shift at a focus on energy efficiency, distributed resources, demand response and engaging with our State Fair to say how can they happened as programs, whether we have them today and we expanded on that or can implement new programs continue to add to that portfolio approach.
 And you know, parts out of that.
 We've been saying this for a while now is some jurisdictions are using more, let's call it, outdated rules, outdated rules to address modern.
 You'll see updated to address the needs of tomorrow.
 And that's what we're working on.
 And I'll just yes, it is very it takes some time to move regulatory bodies forward in a timely manner to meet the needs up to Mark.
 And that's what we've really been putting our attention towards.
 And I think one of the type of And to Kevin's point about the portfolio are attractive for active effort after that, PJNCE. began putting forth proposals on the capacity actions are already improving some of them.
 But then also to Kevin's point, working with our state now and have already made progress here in the first legislative session with the ads for outlining a competitive procurement process for three gigawatt, but instead generation.
 So I think we're pleased to see all of our stakeholders working with a sense of urgency.
 And we're right there at the table to help drive solutions.
 Great.
 Thank you for that.
 Thank you, Kenzie.

Andrew Plenge

I would now like to turn the conference back to Calvin Butler for closing remarks.
 Sir.
 Thank you.
 Thank you achieved.

Calvin Butler

But let me just say it's everyone, and thank you for your interest and support of Exelon.
 I hope as we continue to move these things forward, we're providing you with valuable information, and we appreciate you all taking the time to join us today and for your support with cheap.
 That concludes our call.
 Thanks to all our participants for joining us today.
 This concludes our presentation.
 You may now disconnect.