Canadian Copper Inc. (CSE: CCI) has released initial assay results from eleven drill holes along the western margin of its 100%-owned Murray Brook project in the Bathurst Mining Camp of New Brunswick, reporting broad copper-bearing intervals up to 54.55 metres in length. The results represent a 50-metre step-out beyond the previously reported deposit boundary, suggesting potential for extensions to the known mineralised system. The 2026 exploration drilling program completed 4,351 metres across 21 holes in total. Investors may be watching to see how the results feed into the company's ongoing feasibility study.
Key Points
- Canadian Copper Inc. (CSE: CCI) released initial drill assay results from the Murray Brook project in New Brunswick
- Hole MB26-06 returned 54.55 m at 0.80% copper, including 33.15 m at 1.14% copper; MB26-14 returned 15.25 m at 1.46% copper, including 3.00 m at 3.62% copper
- The 2026 program totalled 4,351 metres in 21 holes; complete hole assays are expected in February 2027, subject to lab availability
- Investors should watch for pending assay results and updates from the company's ongoing feasibility study
Standout Drill Results from the Murray Brook Western Margin
Five of the eleven reported holes returned copper-bearing intervals exceeding 30 metres downhole. Hole MB26-06 on section 0W intersected 54.55 m at 0.80% copper, with a higher-grade sub-interval of 33.15 m at 1.14% copper. On section 25W, MB26-14 returned 32.15 m at 0.78% copper, including 15.25 m at 1.46% copper and, within that interval, 3.00 m at 3.62% copper. MB26-15 intersected 32.40 m at 0.83% copper including 14.00 m at 1.54% copper, while MB26-16 returned 40.15 m at 0.86% copper. The company noted all reported intervals are downhole lengths and true widths have not yet been determined.
Exploration Context and Step-Out Significance at Murray Brook
The drill holes reported — MB26-06 through MB26-16 — are located on sections 0W and 25W, constituting a 50-metre step-out beyond the previously defined deposit boundary. Sulphides occur as disseminations, bands, and stringers, with massive to semi-massive zones observed in core. The geological model remains preliminary, and the company states that any contribution to mineral resources, the mine plan, or project economics will require further geological modelling and technical evaluation. Results from holes MB26-17 to MB26-19 on section 50W are not included in this release.
CEO Comments and Feasibility Study Integration
CEO Simon Quick stated in the release that the results demonstrate the potential to expand copper mineralisation immediately west of the existing Murray Brook deposit. He noted the combination of broad mineralised intervals, copper grades, and proximity to planned mining operations as a potential opportunity to improve project economics. The company disclosed it is evaluating these results alongside its ongoing feasibility study to assess how the additional mineralisation could contribute to the development of Murray Brook and the Caribou Complex. Qualified person Dominique Gagné, P.Geo. of Geominex Inc., reviewed and approved the geological information.
Pending Assays and Timeline for Complete Results
Due to extended laboratory turnaround times, the company fast-tracked assays for mineralised intervals only. Complete hole assays are expected in February 2027, subject to laboratory availability. The release states that additional assays remain outstanding and that initial results should not be used to infer outcomes for the remaining pending intervals. The company said it is evaluating results and may undertake additional drilling, though no program has been formally confirmed.



Please wait processing your request...