Quimbaya Gold Inc. (CSE: QIM) has mobilised an additional diamond drill rig to its Tahami South silver and gold project in the Segovia district of Antioquia, Colombia, and has commenced Phase 2 drilling on the S and V vein systems. The company is now drilling two targets on the Tahami property concurrently, pairing this program with its ongoing work at the Tahami Center copper-molybdenum porphyry system. Phase 2 follows Phase 1 intercepts that included 2.57 g/t gold and 378.1 g/t silver over 0.9 metres, results that investors in junior gold explorers may find noteworthy.

Key Points

  • Quimbaya Gold Inc. (CSE: QIM, OTCQX: QIMGF, FSE: K05) announced the Phase 2 drilling commencement at Tahami South on September 22, 2026.
  • A second diamond drill rig has been mobilised, enabling simultaneous drilling at Tahami South and Tahami Center.
  • Phase 1 returned 13 intercepts above a 0.3 g/t gold equivalent cut-off across 5,320 metres in 12 drill holes; nine of those intercepts are disclosed for the first time in this release.
  • Drilling is expected to be completed in Q4 2026, with assay results anticipated in Q1 2027.

Phase 1 Results Underpin the Phase 2 Drill Layout at Tahami South

Phase 1 comprised 5,320 metres across 12 diamond drill holes from seven platforms and successfully intersected both the S and V vein systems. Among the previously disclosed highlights, hole TSDH_003 returned 2.57 g/t gold and 378.1 g/t silver over 0.9 metres, and TSDH_007 returned 0.77 g/t gold and 528 g/t silver over 1.0 metre. This release also discloses nine additional intercepts for the first time, all above a 0.3 g/t gold equivalent cut-off. The company states that reported lengths are downhole core lengths and true widths are not known.

Ground Geophysics Confirms S and V Vein Continuity Beneath Cover

Ground induced polarization, resistivity, and magnetic surveys, reported previously on June 16, 2026, traced both the S and V vein structures beneath shallow cover across two lithological domains: the northwestern granodiorite porphyry sector and the southern Jurassic Segovia Batholith sector. The geophysical data identified two principal structural corridors, with higher-grade Phase 1 intercepts from TSDH_003 and TSDH_007 occurring along the margins of a resistive feature interpreted as quartz-rich vein development. This geophysical framework forms the basis for Phase 2 drill hole positioning.

Phase 2 Program Focuses on Vein Geometry and Mineralization Continuity

Phase 2 consists of six diamond drill holes from two platforms — three targeting the S vein system and three targeting the V vein system. The program's objective is to define the geometry and continuity of mineralization already encountered in Phase 1, rather than confirm the presence of structures, which Phase 1 established. Drilling is expected to be completed in Q4 2026, with assay results anticipated in Q1 2027 once received, verified, and reviewed by the Qualified Person. The immediate share price impact was not clear from available public information.