Sankamap Metals Inc. (CSE: SCU) announced on November 17, 2026 the successful completion of diamond drill hole KU26-002 at its 100%-owned Kuma Copper-Gold Project in the Solomon Islands. The hole reached its planned depth and intersected the targeted geophysical anomaly within the property's hydrothermal alteration system. With assay results pending for both completed drill holes, the company has simultaneously launched an expanded regional exploration program involving approximately 2,900 soil samples, additional geological mapping, and prospecting across high-priority target areas.
Key Points
- Sankamap Metals Inc. (CSE: SCU) is a Canadian mineral exploration company focused on copper-gold discovery in the Solomon Islands.
- Diamond drill hole KU26-002 has been completed, intersecting the targeted geophysical anomaly at the Kuma Copper-Gold Project.
- Approximately 2,900 soil samples are planned across the Kuma lithocap as part of an expanded regional exploration program; assay results from both drill holes are pending.
- Investors may be watching for assay results from KU26-001 and KU26-002 and updates from the Fauro Project, where 1,098 rock sample results are also outstanding.
KU26-002 Drill Hole Intersects Target Anomaly at Kuma Lithocap
Drill hole KU26-002 was designed to refine Sankamap's understanding of the geometry, continuity, and potential mineralisation controls within the Kuma hydrothermal system. The release states that geological logging and systematic core sampling have been completed, with samples submitted to an accredited laboratory. Assay results remain pending and will be reported as they become available. The company did not disclose drill hole depth or preliminary intercept details in the announcement. Data from KU26-002 will be incorporated into the company's three-dimensional geological model to refine future drill targeting.
Expanded 2,900-Sample Geochemical Program Underway Across the Kuma Property
Following completion of the drill hole, Sankamap has commenced a broader regional exploration program across the Kuma lithocap, which extends approximately eight kilometres and is characterised by argillic, silicic, and advanced argillic alteration. The program encompasses approximately 2,900 soil samples to expand geochemical coverage, alongside additional geological mapping, structural interpretation, rock-chip sampling, and ground verification of historical geochemical and geophysical anomalies. The company states this systematic approach is intended to identify and refine targets while building a pipeline for future drilling phases.
Fauro Project Advances in Parallel With 1,098 Rock Sample Results Pending
Sankamap is concurrently advancing its Fauro Project, also located in the Solomon Islands. Recently completed field programs collected 1,260 rock and silt samples, with analytical results from 1,098 rock samples still pending. Ongoing work at Fauro includes detailed geological mapping, additional rock sampling, hyperspectral alteration studies, IP/resistivity surveys, and three-dimensional geological modelling. The release states that initial diamond drilling to test priority targets at Fauro is planned for Q2 2027, subject to logistics, representing a disclosed milestone investors may be tracking.




Please wait processing your request...