Highlights
- Eloro extends potential starter pit zone with new high-grade silver and tin intercepts
- Step-out hole DSB-92 returns 90m of 61.05 g/t Ag and 0.20% Sn, including a 15m interval at 173.30 g/t Ag
- Infill hole DSB-91 confirms zinc-rich and silver-bearing mineralization near surface
- Drilling indicates the deposit remains open laterally and downdip to the east
- Results set up a material upgrade to the Mineral Resource Estimate for the planned PEA
Eloro Resources Ltd (TSX:ELO) has released newassay resultsfrom drill holes DSB-91 and DSB-92, further enlarging the potential starter pit zone at the Santa Barbara area within the Iska Iska silver-tin-polymetallic project in southern Bolivia. Both holes lie within the Silver-Zinc-Polymetallic domain and confirm extensions of mineralization beyond previously interpreted boundaries.
Step-out hole DSB-92, drilled 50m southeast of earlier discovery hole DSB-88, delivered standout intervals, including 90m grading 61.05 g/t Ag and 0.20% Sn, with richer sections of 15m at 173.30 g/t Ag and 49.50m at 50.14 g/t Ag and 0.26% Sn. The hole also revealed extensive zinc-lead mineralization, returning 238.50m grading 1.77% Zn and 0.57% Pb from the surface. These results suggest that the mineralized envelope extends at least 50–100m beyond the current starter pit outline.
Infill Drilling Confirms Consistency and Grade Continuity
Infill hole DSB-91, collared 100m northwest of DSB-89, showcased several high-grade and continuous mineralized sections. Near surface, the hole cut 64.50m averaging 37.33 g/t Ag, followed by 151.50m grading 1.41% Zn, 0.63% Pb and 13.35 g/t Ag. Deeper intervals included tin-rich zones such as 16.50m at 1.02% Sn and 3.17% Pb, supporting the presence of a consistent tin-silver-lead system at depth.
The combination of surface-proximal zinc-lead intervals and deeper tin-silver pockets illustrates the vertically stacked nature of the polymetallic system, characteristic of the porphyry-epithermal environment at Iska Iska.
Implications for Resource Growth and 2026 Drilling Plans
Eloro executives say these results reinforce the potential for both lateral and vertical expansion of high-grade domains. With the definition drilling phase now complete—totaling over 8,280m drilled in this phase alone—the company is preparing for an expanded drill program in 2026 to upgrade and enlarge the mineral resource model ahead of the Preliminary Economic Assessment.
The company notes that silver, tin, zinc, and lead mineralization remains open in multiple directions. This suggests that the resource footprint could extend significantly beyond current modeling, potentially improving both the size and grade of the upcoming MRE update.
Conclusion
The latest drilling at Iska Iska continues to outline a large, evolving polymetallic system with expanding high-grade zones. The consistency of long intervals in both infill and step-out holes strengthens confidence in future resource upgrades and the development potential of the Santa Barbara starter pit. As Eloro prepares for the next drill phase in 2026, the project is increasingly positioned as a meaningful contributor to global silver and tin supply chains.
Eloro Resources’ shares closed at CAD 1.45 on November 19, marking a 5.07% increase from the prior session.
Also read - Teck Resources (TSX:TECK.A): Recognized Again as One of Canada’s Top 100 Employers






Please wait processing your request...