Image source: Shutterstock

Highlights

  • Record Silver Production: 3.7 million ounces of silver, an 88% increase from Q1 2024
  • Strong Silver Equivalent Production: 7.7 million AgEq ounces, up 49% year-over-year
  • Active Exploration: 61,219 meters of drilling completed with up to 28 drill rigs in operation

First Majestic Silver Corp. (TSX: AG) (FSE: FMV) has reported total production of 7.7 million silver equivalent (AgEq) ounces for the first quarter of 2025. This total was derived from the Company’s four producing underground mines in Mexico: Cerro Los Gatos, Santa Elena, San Dimas, and La Encantada. The silver production included 3.7 million ounces of silver, alongside 36,469 ounces of gold, 12.5 million pounds of zinc, and 7.5 million pounds of lead.

Keith Neumeyer, President & CEO of First Majestic, highlighted the company’s impressive performance, noting a record for silver production and a significant improvement in safety during the quarter. Neumeyer emphasized that the operations at Cerro Los Gatos were a standout, contributing substantially to the overall results and now accounting for nearly 30% of First Majestic's total production.

The company’s focus on safety and operational efficiency has paved the way for a strong start to 2025. First Majestic remains committed to growing its portfolio and continuing its aggressive exploration program across its Mexican operations.

First Majestic’s growth trajectory is further supported by its ongoing exploration activities, including drilling at Cerro Los Gatos, Santa Elena, San Dimas, and La Encantada. Additionally, the company is making strides in its environmental and operational efforts, with a move to replace diesel generators at San Dimas with liquefied natural gas (LNG) units expected to yield cost savings and reduce carbon emissions by up to 25% when back-up power is required.