Image source: Shutterstock

Highlights:

  • Drillhole PVD02 intersected 46m, averaging 1.08 g/t gold, including 4m at 6.27 g/t from near surface.
  • First-ever drill results confirm presence of gold at the historical copper-cobalt-nickel mine at Providencia.
  • Step-out drilling and geophysical interpretation are underway to identify additional mineralized zones across the Cármenes Project.

Pan Global Resources (TSXV: PGZ) (OTCQB: PGZFF) (FRA: 2EU) has reported promising assay results from its maiden drilling campaign at the Cármenes Project in northern Spain. The company’s first completed drillhole intersected near-surface gold mineralization, marking the first recorded gold occurrence at the historical Providencia mine site.

The Cármenes Project, which is 100% owned by Pan Global, includes the Providencia target area an old copper-cobalt-nickel mine with no previous gold exploration history. The current six-hole drill program is designed to expand on mineralized breccia zones identified through earlier trenching and soil sampling.

Drillhole PVD02 intersected 46 meters averaging 1.08 grams per tonne (g/t) gold from a depth of 24 meters, including a higher-grade section of 6.27 g/t over 4 meters. The mineralization was hosted in hydrothermal breccia zones within altered limestones, with low concentrations of deleterious elements such as arsenic and antimony.

The company confirmed that this is the first drill program to test the Providencia target, where historical underground mining activity focused on copper, cobalt, and nickel. No records indicate previous gold extraction. According to Pan Global, the newly discovered gold zone may represent a broader mineralized halo surrounding the historical high-grade copper ore body.

Two additional holes (PVD03 and PVD04) have been completed, with assay results expected within three weeks. PVD04 reportedly intersected breccia zones over more than 120 meters from near surface. A first drillhole (PVD01) was abandoned due to collapse before reaching its target depth.

The area around Providencia is also being assessed through step-out drilling up to 120 meters east of the historical workings. This includes follow-up on previously reported trench and channel samples, including intervals of 3.11 g/t gold over 37 meters and 1.74 g/t over 20 meters. The broader surface target zone extends across an area of approximately 250 by 150 meters, marked by dolomite alteration, breccia, and elevated geochemical anomalies in gold, copper, nickel, cobalt, and lead.

Pan Global is also conducting channel sampling within the historical underground workings to better understand the extent and continuity of the mineralization. In parallel, a helicopter-based geophysical survey using electromagnetic, magnetic, and radiometric methods has been completed. Interpretation of that data is ongoing and aims to assist in prioritizing further drill targets across the broader Cármenes Project area.