Highlights
- SPA intersected 100.49m at 0.49 g/t gold, with visible gold observed.
- The company identified a new mineralized argillite unit beyond the 2021 resource boundaries.
- SPA expanded mineralization potential across 3 km strike length at multiple target zones.
Spanish Mountain Gold Ltd. (TSX-V: SPA, OTC: SPAZF) is a Canadian exploration-stage company focused on the advancement of its Spanish Mountain gold project in British Columbia. The project features multi-phase gold mineralization and has been the subject of ongoing exploration, drilling, and economic assessments. The company continues to explore both near-surface and deeper targets to expand the scale and continuity of the deposit.
The company has reported the results from its recently concluded 10,000-meter winter diamond drilling campaign at its flagship Spanish Mountain Gold project in British Columbia. The campaign focused on evaluating multiple target areas outside the boundaries of its 2021 prefeasibility study (PFS) mineral resource estimate, revealing additional mineralized zones and structural insights.
The most notable result came from a step-out drill hole located about 300 meters northwest of a previous high-grade intercept at the K-Zone. This hole returned 100.49 meters grading 0.49 grams per tonne (g/t) gold, beginning at a depth of 300 meters. Within that broader interval, the hole intersected a 15-meter section grading 1.29 g/t gold, which included a 1-meter interval assaying 12.13 g/t gold and containing visible gold.
This drill hole also revealed a newly encountered geological unit—a cataclastic argillite—at a vertical depth of 240 meters. The unit returned consistent gold values, suggesting a potential southwest extension of the mineralization beyond the currently defined open-pit constrained resources. This discovery may have implications for future updates to the project’s mineral resource estimates.
Two additional holes were drilled approximately 35 meters northeast of the earlier K-Zone intercept. One returned 46 meters grading 0.22 g/t gold from 162 meters depth, with narrower intervals of higher grades, including 8 meters at 0.39 g/t and 2 meters at 1.06 g/t. The second hole in the same area encountered a 5.33-meter interval grading 0.34 g/t gold.
The company noted that these recent results are part of a broader trend of expanding mineralization along a 3-kilometre strike length, now covering targets such as the Phoenix, Outcropping Tuff, and K-Zone areas. These targets were defined through a combination of previous exploration work and recent reinterpretations of geological structures and lithological units.
Recent drilling also identified new potential within a mafic tuff unit, where evolving geological and structural interpretations have opened prospective target areas. In particular, intense hydrothermal alteration near a major fault on the southern part of the property indicates the presence of geological features that may have facilitated mineralizing fluid flow. This area may contain intrusive characteristics relevant to further exploration.
Geochemical soil sampling and geological mapping have highlighted additional targets, including gold-in-soil anomalies at the intersection of key fault structures. These anomalies, along with drill results, are being used to refine the company’s geological model and exploration approach across the broader project area.
The Spanish Mountain Gold project is in central British Columbia and is wholly owned by Spanish Mountain Gold Ltd. The project has undergone multiple drilling and engineering programs over the past decade, with a prefeasibility study completed in 2021 outlining an open-pit constrained mineral resource. Recent work aims to identify mineralization that extends beyond the existing resource footprint and to inform future updates to resource estimates and project planning.






Please wait processing your request...