VANCOUVER, BC, May 29, 2024 /PRNewswire/ - NexGen Energy Ltd. ("NexGen" or the "Company") (TSX: NXE) (NYSE: NXE) (ASX: NXG) is pleased to announce drilling at Patterson Corridor East ("PCE") has intersected mineralization in RK-24-193 over 67.5 metres (m) (383.5 to 451 m) across various intervals including up to 7,500 cps over 1.5 m (Figures 1 to 4, Table 1). RK-24-193 is located 275 m southwest along strike of RK-24-183 (discovery hole) and at approximately the same depth below surface.
In addition, assays from RK-24-183 confirm high grade uranium veins across a 20 m interval with several intersections totalling 13.5 m at 0.78% U3O8 including 0.5 m (348.0 to 348.5 m) at 10% U3O8 and another 0.5 m (356.5 to 357 m) at 6.23% U3O8 (Table 2). For reference, the Arrow discovery hole RK-14-21 assayed 5.75 m at 0.37% U3O8, including 0.25 m at 5.77% U3O8.
Collectively, these results of multiple narrow intersections of mineralization in two holes represent a current strike length of 275 m at PCE, suggesting a potential upper edge to mineralization highly analogous to the early holes at Arrow (Figure 1). Consequently, the summer drilling program has been expanded to 4 drill rigs and targeting 22,000 m at PCE (Figure 2). Figure 1: Schematic cross-section showing early holes at Arrow and PCE with relative depths of mineralization; follow up will primarily focus on blue shaded area down dip and along strike (CNW Group/NexGen Energy Ltd.) Figure 2: PCE showing with area of interest for further exploration outlined; 2024 drillholes shown as green dots, interpreted primary structures are represented by dashed lines (CNW Group/NexGen Energy Ltd.)
Leigh Curyer, Chief Executive Officer, commented: "Our team has assessed the geological similarities between RK-24-183 and RK-24-193 and the upper areas of Arrow, which indicates the high prospectivity of an additional mineralized system 3.5 km east of Arrow. Consequently, the growing potential of this latest discovery will drive the focus of the summer exploration program to determine the potential size and extent of mineralization. Efficient and bold testing of the overall system is the first priority.
It is an exciting time at NexGen with the Company recently advancing the Federal Environmental Assessment process for the Rook I Project through the submission of responses to the remaining Information Requests, as well as advancing detailed engineering and exploring a new discovery in parallel."
RK-24-193
This new hole intersected elevated radioactivity over 67.5 m (Table 1) with mineralization style and alteration intensity strongly resembling up dip projections that were seen during the early discovery holes at Arrow.
In addition, drill results further south in RK-24-180, RK-24-192, and RK-24-194 indicate a possible repetition of prospective structure that correlates well with the local gravity low, a typical indicator of potential hydrothermal alteration. Numerous brittle reactivated structures and associated intense alteration within these three drillholes highlight a potential supplementary uranium-bearing trend within the same system. This hasdoubled the size of the systemto be tested this summer with an approximate extent of 1.5 km long by 1.2 km wide (Figure 2). Potential remains in most directions within this highly prospective area.
Figure 3: Elevated radioactivity from RK-24-193 with maximum values shown for mineralized veins outlined in yellow. Replacement style mineralization is similar to the discovery hole, RK-24-183, with a notable upgrade of alteration intensity that included m-scale dravitic breccia. (CNW Group/NexGen Energy Ltd.) Figure 4: Hydrothermal hematite, argillization, and uraninite blebs at 419.7 m with a maximum of 7,500 cps (CNW Group/NexGen Energy Ltd.)
Summer Drilling
Focus of the expanded summer program is on assessing the broad hydrothermal system at PCE (Figure 2) and expanding the mineralized footprint. Robust analysis and interpretation processes will be utilized to actively assess potential while efficiently testing priority targets.
Over 22,000 m of diamond drilling is planned for the PCE system utilizing four drill rigs. This represents a near tripling of drilling from the winter to summer program. Optionality exists with planning underway to increase the total based on drill results. Targets will primarily be tested between 400 and 700 m below surface to test potential depth extensions, as is present at Arrow. Summer drilling will significantly advance the investigation of PCE while highlighting geological relationships that can be applied elsewhere within NexGen's exploration portfolio (Figure 5). Figure 5: PCE and analogs, based on geological and geophysical similarities, shown as green shapes (CNW Group/NexGen Energy Ltd.)
Table 1: 2024 Spectrometer results to date
Drillhole Unconformity
Depth (m) Handheld Spectrometer Results (RS-125) Hole ID Azimuth Dip Total
Depth
(m) From
(m) To (m) Width
(m) CPS Range RK-24-179 310 -70 462 138 141 141.5 0.5 <500 - 1,100 150 151 1 <500 154 155 1 <500 - 560 156.5 157 0.5 <500 RK-24-180 310 -70 366 102.3 No Significant Intersections RK-24-181 310 -70 573 115.7 191.5 192 0.5 <500 RK-24-182 310 -70 411 N/A No Significant Intersections RK-24-183 310 -70 501 125.3 347.5 350 2.5 500 - 52,000 350 351 1 <500 - 1,200 351 354 3 700 - 16,200 354 355 1 <500 - 570 355 358 3 1,300 - >61,000 358 358.5 0.5 790 - 2,100 358.5 362.5 4 <500 - 680 362.5 363 0.5 <500 - 1,070 363 365 2 <500 365 365.5 0.5 800 - 7,700 365.5 367 1.5 <500 367 367.5 0.5 <500 - 28,000 RK-24-184 280 -70 534 137.7 No Significant Intersections RK-24-185 310 -70 396 N/A 312.5 313.5 1 <500 335 335.5 0.5 <500 RK-24-186 310 -70 440 128.2 181.5 182 0.5 <500 - 700 211 212 1 <500 - 600 RK-24-187 310 -70 501 116.8 163 164.5 1.5 <500 191 191.5 0.5 <500 - 830 RK-24-188 310 -70 510 120.5 338 340 2 <500 410.5 412.5 2 <500 418.5 421.5 3 <500 RK-24-189 310 -70 537 130 No Significant Intersections RK-24-190 310 -70 547 123.8 No Significant Intersections RK-24-191 310 -70 402 N/A 266 267 1 <500 - 700 RK-24-192 310 -70 444 108.5 No Significant Intersections RK-24-193 310 -70 621 N/A 383.5 384.5 1 <500 - 820 389.5 390 0.5 <500 - 1,330 393.5 394 0.5 <500 401.5 402.5 1 580 - 640 413 413.5 0.5 <500 417.5 418.5 1 <500 419 420.5 1.5 <500 - 7,500 423 425 2 <500 - 700 426.5 428 1.5 <500 - 1,100 428.5 429 0.5 <500 430 430.5 0.5 <500 - 3,100 432 434 2 <500 - 2,850 435 437 2 <500 442 443 1 <500 - 510 449 451 2 <500 - 2,700 RK-24-194 310 -70 420 98.8 190.5 191 0.5 <500
All depths and intervals are meters downhole, true thicknesses are yet to be determined. "Off-scale" refers to >61,000 cps total readings by gamma spectrometer type RS-125. Unconformity of 'N/A' denotes a lack of visible contact between Athabasca sandstone and basement rock. Maximum internal dilution 2.0 m downhole. Minimum thickness of 0.5 m downhole. All depths and intervals are metres downhole, true thicknesses are yet to be determined. Resource modelling in conjunction with an updated mineral resource estimate is required before true thicknesses can be determined.
Table 2: 2024 Assay results to date
Drillhole Unconformity
Depth (m) SRC Geoanalytical Results
(Cutoff 0.01%) Hole ID Azimuth Dip Total
Depth
(m) From
(m) To (m) Width
(m) U3O8
(wt%) RK-24-179 310 -70 462 138 No Significant Intersections RK-24-180 310 -70 366 102.3 No Significant Intersections RK-24-181 310 -70 573 115.7 No Significant Intersections RK-24-182 310 -70 411 N/A No Significant Intersections RK-24-183 310 -70 501 125.3 347.5 361 13.5 0.78 including 348 348.5 0.5 10.0 including 356.5 357 0.5 6.23 362.5 363 0.5 0.07 365 365.5 0.5 0.55 367 367.5 0.5 1.42 369.5 370 0.5 0.01 RK-24-184 280 -70 534 137.7 No Significant Intersections RK-24-185 310 -70 396 N/A 312.5 313.5 1 0.01 335 335.5 0.5 0.05 RK-24-186 310 -70 440 128.2 No Significant Intersections RK-24-187 310 -70 501 116.8 No Significant Intersections RK-24-188 310 -70 510 120.5 412 412.5 0.5 0.02 418.5 419 0.5 0.01 419.5 420 0.5 0.01 422.5 424 1.5 0.01 RK-24-189 310 -70 537 130 No Significant Intersections RK-24-190 310 -70 547 123.8 No Significant Intersections RK-24-191 310 -70 402 N/A No Significant Intersections RK-24-192 310 -70 444 108.5 No Significant Intersections RK-24-193 310 -70 621 N/A Assays Pending RK-24-194 310 -70 420 98.8 No Significant Intersections
All depths and intervals are meters downhole, true thicknesses are yet to be determined. Unconformity of 'N/A' denotes a lack of visible contact between Athabasca sandstone and basement rock. Maximum internal dilution 2.0 m downhole. Minimum thickness of 0.5 m downhole. Cutoff grade 0.01% U3O8. All depths and intervals are metres downhole, true thicknesses are yet to be determined. Resource modelling in conjunction with an updated mineral resource estimate is required before true thicknesses can be determined.
About NexGen
NexGen Energy is a Canadian company focused on delivering clean energy fuel for the future. The Company's flagship Rook I Project is being optimally developed into the largest low cost producing uranium mine globally, incorporating the most elite standards in environmental and social governance. The Rook I Project is supported by a NI 43-101 compliant Feasibility Study which outlines the elite environmental performance and industry leading economics. NexGen is led by a team of experienced uranium and mining industry professionals with expertise across the entire mining life cycle, including exploration, financing, project engineering and construction, operations, and closure. NexGen is leveraging its proven experience to deliver a Project that leads the entire mining industry socially, technically, and environmentally. The Project and prospective portfolio in northern Saskatchewan will provide generational long-term economic, environmental, and social benefits for Saskatchewan, Canada, and the world.
NexGen is listed on the Toronto Stock Exchange, the New York Stock Exchange under the ticker symbol "NXE" and on the Australian Securities Exchange under the ticker symbol "NXG" providing access to global investors to participate in NexGen's mission of solving three major global challenges in decarbonization, energy security and access to power. The Company is headquartered in Vancouver, British Columbia, with its primary operations office in Saskatoon, Saskatchewan.
Technical Disclosure*
All technical information in this news release has been reviewed and approved by Jason Craven, NexGen's Manager, Exploration, a qualified person under National Instrument 43-101.
Natural gamma radiation in drill core reported in this news release was measured in counts per second (cps) using a Radiation Solutions Inc. RS-125 gamma spectrometer. The reader is cautioned that total count gamma readings may not be directly or uniformly related to uranium grades of the rock sample measured; they should be used only as a preliminary indication of the presence of radioactive minerals.
A technical report in respect of the FS is filed on SEDAR ( www.sedar.com ) and EDGAR (www.sec.gov/edgar.shtml ) and is available for review on NexGen Energy's website (www.nexgenenergy.ca ).
Cautionary Note to U.S. Investors
This news release includes Mineral Reserves and Mineral Resources classification terms that comply with reporting standards in Canada and the Mineral Reserves and the Mineral Resources estimates are made in accordance with NI 43-101. NI 43-101 is a rule developed by the Canadian Securities Administrators that establishes standards for all public disclosure an issuer makes of scientific and technical information concerning mineral projects. These standards differ from the requirements of the Securities and Exchange Commission ("SEC") set by the SEC's rules that are applicable to domestic United States reporting companies. Consequently, Mineral Reserves and Mineral Resources information included in this news release is not comparable to similar information that would generally be disclosed by domestic U.S. reporting companies subject to the reporting and disclosure requirements of the SEC Accordingly, information concerning mineral deposits set forth herein may not be comparable with information made public by companies that report in accordance with U.S. standards.
Forward-Looking Information
The information contained herein contains "forward-looking statements" within the meaning of applicable United States securities laws and regulations and "forward-looking information" within the meaning of applicable Canadian securities legislation. "Forward-looking information" includes, but is not limited to, statements with respect to mineral reserve and mineral resource estimates, the 2021 Arrow Deposit, Rook I Project and estimates of uranium production, grade and long-term average uranium prices, anticipated effects of completed drill results on the Rook I Project, planned work programs, completion of further site investigations and engineering work to support basic engineering of the project and expected outcomes. Generally, but not always, forward-looking information and statements can be identified by the use of words such as "plans", "expects", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", or "believes" or the negative connotation thereof or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved" or the negative connotation thereof. Statements relating to "mineral resources" are deemed to be forward-looking information, as they involve the implied assessment that, based on certain estimates and assumptions, the mineral resources described can be profitably produced in the future.
Forward-looking information and statements are based on the then current expectations, beliefs, assumptions, estimates and forecasts about NexGen's business and the industry and markets in which it operates. Forward-looking information and statements are made based upon numerous assumptions, including among others, that the mineral reserve and resources estimates and the key assumptions and parameters on which such estimates are based are as set out in this news release and the technical report for the property , the results of planned exploration activities are as anticipated, the price and market supply of uranium, the cost of planned exploration activities, that financing will be available if and when needed and on reasonable terms, that third party contractors, equipment, supplies and governmental and other approvals required to conduct NexGen's planned exploration activities will be available on reasonable terms and in a timely manner and that general business and economic conditions will not change in a material adverse manner. Although the assumptions made by the Company in providing forward looking information or making forward looking statements are considered reasonable by management at the time, there can be no assurance that such assumptions will prove to be accurate in the future.
Forward-looking information and statements also involve known and unknown risks and uncertainties and other factors, which may cause actual results, performances and achievements of NexGen to differ materially from any projections of results, performances and achievements of NexGen expressed or implied by such forward-looking information or statements, including, among others, the existence of negative operating cash flow and dependence on third party financing, uncertainty of the availability of additional financing, the risk that pending assay results will not confirm previously announced preliminary results, conclusions of economic valuations, the risk that actual results of exploration activities will be different than anticipated, the cost of labour, equipment or materials will increase more than expected, that the future price of uranium will decline or otherwise not rise to an economic level, the appeal of alternate sources of energy to uranium-produced energy, that the Canadian dollar will strengthen against the U.S. dollar, that mineral resources and reserves are not as estimated, that actual costs or actual results of reclamation activities are greater than expected, that changes in project parameters and plans continue to be refined and may result in increased costs, of unexpected variations in mineral resources and reserves, grade or recovery rates or other risks generally associated with mining, unanticipated delays in obtaining governmental, regulatory or First Nations approvals, risks related to First Nations title and consultation, reliance upon key management and other personnel, deficiencies in the Company's title to its properties, uninsurable risks, failure to manage conflicts of interest, failure to obtain or maintain required permits and licences, risks related to changes in laws, regulations, policy and public perception, as well as those factors or other risks as more fully described in NexGen's Annual Information Form dated February 24, 2023 filed with the securities commissions of all of the provinces of Canada except Quebec and in NexGen's 40-F filed with the United States Securities and Exchange Commission, which are available on SEDAR at www.sedar.com and Edgar at www.sec.gov .
Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in the forward-looking information or statements or implied by forward-looking information or statements, there may be other factors that cause results not to be as anticipated, estimated or intended. Readers are cautioned not to place undue reliance on forward-looking information or statements due to the inherent uncertainty thereof.
There can be no assurance that forward-looking information and statements will prove to be accurate, as actual results and future events could differ materially from those anticipated, estimated or intended. Accordingly, readers should not place undue reliance on forward-looking statements or information. The Company undertakes no obligation to update or reissue forward-looking information as a result of new information or events except as required by applicable securities laws. NexGen Energy Ltd. Logo (CNW Group/NexGen Energy Ltd.) Cision
View original content to download multimedia:https://www.prnewswire.com/news-releases/nexgen-announces-additional-mineralization-discovered-at-patterson-corridor-east-assays-from-rk-24-183-and-commencement-of-expanded-summer-exploration-program-302157942.html
SOURCE NexGen Energy Ltd.
NexGen Announces Additional Mineralization Discovered at Patterson Corridor East, Assays from RK-24-183 and Commencement of Expanded Summer Exploration Program
You are reading a free article with opinions that may differ from the recommendation given by Kalkine in its paid research reports. Become a Kalkine member today to get access to our research reports, in-depth technical and fundamental research. Learn more
Start Your Free Trial Now!Download Free Report – Explore 3 Stock Ideas & Industry Insights
Unlock 3 stock ideas and key industry insights in our free report. This information is general in nature and does not consider your personal objectives, financial situation, or needs. It is not financial advice.
All investments involve risk—consider independent advice before making any investment decisions.
View 3 Research ReportsThis information, including any data, is sourced from Unicorn Data Services SAS, trading as EOD Historical Data (“EODHD”) on ‘as is’ basis, using their API. The information and data provided on this page, as well as via the API, are not guaranteed to be real-time or accurate. In some cases, the data may include analyst ratings or recommendations sourced through the EODHD API, which are intended solely for general informational purposes.
This information does not consider your personal objectives, financial situation, or needs. Kalkine does not assume any responsibility for any trading losses you might incur as a result of using this information, data, or any analyst rating or recommendation provided. Kalkine will not accept any liability for any loss or damage resulting from reliance on the information, including but not limited to data, quotes, charts, analyst ratings, recommendations, and buy/sell signals sourced via the API.
Please be fully informed about the risks and costs associated with trading in the financial markets, as it is one of the riskiest forms of investment. Kalkine does not provide any warranties regarding the information on this page, including, without limitation, warranties of merchantability or fitness for a particular purpose or use.
Please wait processing your request...